Reinforcing steel was inspected for arrangement, cleanliness and checked against working drawings
and reference specifications of ACI-301 for the following items. Check marks indicate compliance.
All items in non-compliance are either corrected during inspection or noted below.
Size and location:Clearance to forms:
Grade Strength:Extra bars at openings:
Splice Lapping:Adequate ties:
Spacing:Concrete coverage:
Supports:Stirrup spacing:
Location and Drawing #:Footings and piers
Drawing #'s:R1- 02, R1- 06, R1- 07, Dated 09/14/23
Remarks:A reinforcing steel inspection was performed for the above location. All reinforcing
steel inspected conformed with the appropriate drawings/ specifications.
Note: All test results and findings contained within this report are limited to the areas
indicated.
100 Weymouth St., Unit B-1, Rockland, Ma 02370
100 Pound Rd., Cumberland, RI 02864 Approved:
Director of Field Operations:YHSean Skorohod
PARTLY CLOUDY
WICKED WAVES CC INFLAT PARK
32693
Mario Noel
11/13/23
√
√
Sean Skorohod
√
√
√√
√
√
√
√