HomeMy WebLinkAboutReview Checklist p1LtS ✓ `
��� TOWN OF YARMOUTH 01L kC w
SEWAGE PLAN REVIEW CHECKLIST 1
Location: A.M. Lot Zone of Contribution: In Out_Acreage
Street: 1 "
pl 4./,k"5( IA_p� Commercial: Residential:
Village: Floor Plan: S #Bedrooms: 3
Owner: Installer: T-.D
Address: Phone:
Phone:
Builder: Engineer: �',�%1 V
Address: Phone:
Phone:
N/A YES / NO
1. Required#of copies received �/
2. Date of soils exam and percolation test not older than 2 years Eli ,/
3. 4-5 ft of naturally occurring pervious material, above water table ✓
4.Foundation 2 ft above high point of road H.P.: /QO. nd:lOZ.1 Var.: ✓
5. Water line 10 ft from septic components Var.: ✓
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: /
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: 4
.;.keaching set 4-5 ft above adj. water or bottom of test hole Var.: /6
64 System not in top or subsoil(A,B horizons)or 5' removal - �' - 3pY44
•.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee _
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox /
24. Manhole covers within 6"of grade,pump chamber cover to grade ✓✓ /
25. Inspection port on plastic chambers/leach field t/
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: ✓-
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
Y-20 loading is subject to vehicular traffic, groundwater
itle V Application and permit fee,installer signature
3 .Foundation footing min.2 feet above adjusted ground water for new house
036.Deed Restriction required max. #bedrooms: max. flow: gpd t .
37. Check area lots for groundwater/Lab oundwater in Assessor's Map
Plan reviewed by: 6/03/03