Loading...
HomeMy WebLinkAbout32693-12-13-23-RS.xls - Compatibility Modec.r.s.i.rev2,02 Concrete Reinforcing Steel Report Briggs Engineering & Testing PROJECT: A Division of PK Associates, Inc.PROJECT#: INSPECTOR: EMP.#:REPORT#:DATE:CODE: PAGE OF TEMP.:H 45F L 35F WIND: H 15 mph L 10 mph HUMID: H 40%L Reinforcing steel was inspected for arrangement, cleanliness and checked against working drawings and reference specifications of ACI-301 for the following items. Check marks indicate compliance. All items in non-compliance are either corrected during inspection or noted below. Size and location:Clearance to forms: Grade Strength:Extra bars at openings: Splice Lapping:Adequate ties: Spacing:Concrete coverage: Supports:Stirrup spacing: Location and Drawing #:Isolated pier footings- AP5, AP7, AP45, AP50, AP51, AP52, AP53, AP54, AP68, AP85, AP86, AP100 Piers/ pedestals- AP3, AP4, AP5, AP7, AP8, AP9, AP10, AP11, AP45, AP46, AP47, AP49, AP50, AP51, AP52, AP53, AP54, AP68, AP85, AP86, AP95, AP100 Drawing #'s:Plans By Rebars & Mesh/ R1.01, R1.02, R1.03, R1.04, R1.05, R1.06, R1.07, Dated 10/17/23 Remarks:A reinforcing steel inspection was performed for the above location. All reinforcing steel inspected conformed with the appropriate drawings/ specifications. Note: All test results and findings contained within this report are limited to the areas indicated. 100 Weymouth St., Unit B-1, Rockland, Ma 02370 100 Pound Rd., Cumberland, RI 02864 Approved: Director of Field Operations:YH N/A Sean Skorohod WICKED WAVES CC INFLAT PARK 32693 Glenn Geikie 12/13/23 √ Sean Skorohod √ √ √√ √ √ √ √