HomeMy WebLinkAboutcoc request939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
December 19, 2023
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE 83-2312 (60 Bray Farm Road North)
Dear Commission Members:
tel. (508) 362-4541
fax (508) 362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E.
Craig I Ferrari, E.I.T., S.E.
On 1/28/22, the Commission issued an Order of Conditions for the
above -referenced site, to permit the rebuilding of an existing
deck with expanded footprint at the above -referenced site.
A site visit/inspection/measurements were made for the purpose of
closing out the Order of Conditions. A split rail fence was
installed just landward of the (discontinuous) bank to be used as
a demarcation between maintained lawn area and the area to be left
naturally vegetated. It was installed in the location as staked
in the field by DCE prior to installation and is shown on the
enclosed plan, as -built.
This is to certify, to the best of my knowledge
the Worl was performed in substantial compliance
plan and Order of Conditions. We hereby request
Certificate of Compliance at this time.
Thanle you for your consideration.
Very truly yours,
Daniel A. Ojala, P , PLS
Down Cape Engineering, Inc.
cc: John Reizian
encl.
and belief, that
with the approved
the issuance of a
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
teb
r�
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
1. This request is being made by:
Ir)WK1 RI=171ANI
2.
Name
60 BRAY FARM ROAD NORTH
Mailing Address
YARMOUTH PORT
City/Town
RAn-gas-QAAJ
DEP He Number:
083-2312 __
Provided by DEP
MA 02675
State Zip Code
Phone Number
This request is in reference to work regulated by a final Order of Conditions issued to:
MARY MANNING TRUST OF DECEMBER 22, 2020
Applicant
01 /28/2022
The project site is located at:
60 BRAY FARM ROAD NORTH
Street Address
151
Assessors Map/Plat Number
083-2312
DEP File Number
YARMOUTHPORT
City/Town
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
nnoQv naAnlrylNr TRl IST nF DECEMBER 22, 2020
Property Owner (if different)
County
Certificate (if registered land)
5. This request is for certification that (check one):
Z
34943
Book
227
Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the work regulated by the above -referenced Order of
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
Page 1 of 2
wpaform8a.doc ••rev. 5/29/14
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
DEP File Number:
083-2312
Provided by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.).
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final. Decision, submit this request to the appropriate DEP Regional
Office (see http //www mass gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-offic
for-your-city-or-town.html).
Page 2 of 2
wpaform8a.doc •• rev. 5/29/14
NO BANK /
S 99 /
L� �
NATURALLY VEGETATED
N�o
AREA (TO BE LEFT L 6P
UNDISTURBED) S GOPS�P
v
EXISTING 2ND
GON�\NUO
STORY DECK
�� �, REBUILT / %`�
/� 0
NO BANK / • /" / /GOPc��P
90
RNL FENCE 50 ' p�6`
•/ P
DECK EXPANSION K
i
OF
v OJALP,
A No. 40980
�o�ES \oae-
Sc le 1 2
0 10 20 30 40 50 FEET
I off 508-362-4541
fax 508-362-9880
downcape.com
down cope eagiaeenag, lace
civil engineers
land surveyors
939 Main Street ( Rte 6A)
YARMOUTHPORT MA 02675
1-295 NINE
EXISTING
DWELLING
TOF = 28.1'
LOT 4
48, 812f
APPRX. o�F�
LOCATION^ j0� ��-
� LF
i
i
AS -BUILT PLAN
FOR FILING WITH REQUEST FOR CERT, OF COMPLIANCE
IN
60 BRAY FARM RD. NO.
YARMOUTH
PREPARED FOR
JOHN REIZIAN
SCALE: 1' = 20' DATE: DEC. 19, 2023
AMP
aa
,1, � �.,� ,�k-. v �'_ y'9i*..�"cT`-�'� •���'r�t rye"_ -
r r
IL
i
11 / 21 12023 %-]A � 09
p a,
.� idrom
oror FF too. vis
1 IF 'gym!""•- ,
r
rJ. ,or e9
A +I
to r
ot
ot
so
e'� ems` `hyyK
too `,a
k n
r ... w
k
lot I
-- -
-
1
7
44 oIIt rf 71—
_ .
FI
Io II
IF FEI
I Soft
of
FF
If to it IF
Fill! pp
Ir
I If I Flow
too. t
TL
- III ! 7. ..'r •.. t. .1 I I. A ;. _ w -
ot
tor ooF_to tit
of 6
I too
It Foom W. 0 It
It
ooim too 1— 0
\ I \ rGo I to"/It IF
of
lFF
ftt
I.
FII
of of L t0000ap�
ot
of
fir'.. ,�: _ _ram .1.
of
I, 1
to
_ _ I
•' h'. •!l
G it �rIt
A�
All filings must be made on Town of Yarmouth forms.
CONSERVATION
OFFICE
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office - mailed to or dropped off at Town Hall.
1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirienzo(cDvarmouth.ma.us.
1� Statement from Engineer and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*.
Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma. us/696/Fi li nq-Forms.
*Click Yarmouth Street Index for parcel -related Conservation documents.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(c�,yarmouth.ma.us
Rev 8/2022