Loading...
HomeMy WebLinkAboutDEP comment DiRienzo, Brittany From: SERO_NOI@MassMail.state.ma.us Sent: Tuesday, December 19, 2023 3:22 PM To: Whritenour, Robert; andrew.poyant@mass.gov; permitting@coastalengineeringcompany.com Cc: sero_noi@state.ma.us; DiRienzo, Brittany; sero_noi@state.ma.us Subject: MassDEP NOI File Number Attention!:This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY& ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION SOUTHEAST REGIONAL OFFICE 20 RIVERSIDE DRIVE, LAKEVILLE, MA 02347 508-946-2700 Date: 12/19/2023 Municipality YARMOUTH RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c. 131, §40): Applicant TOWN OF YARMOUTH Address 1146 ROUTE 28,SOUTH YARMOUTH Owner MA Address 261, 275, & 281 ROUTE 28** , Locus YARMOUTH MA This project has been assigned the following file# : SE 083-2410 ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF APPLICATION Although a file# is being issued, please note the following: Provide proof of electronic delivery to: Division of Marine Fisheries Southeast Marine Fisheries Station Email: DMF.EnvReview-South@mass.gov 310 CMR 10.32(3) and (4)- Because of its east-west orientation there will likely be shading impacts from the bridge structure and allowing adequate light penetration to the vegetation is essential.The structure should be elevated at least as great as the width within the bordering vegetated wetland and the vegetated portions of the coastal dune. The spacing between decking should be no less than 3/4" and it is recommended that light penetrating decking alternatives be considered.The Conservation Commission and proponent are advised to consult MassDEP's Guide to Permitting Small Docks and Piers (https://www.mass.gov/doc/permitting-small-pile-supported-docks-and-piers- guidance/download). ADDITIONAL REQUIREMENTS: 1 A Chapter 91 license may be required.Application and transmittal forms are available on the MassDEP website http://www.mass.gov/eea/agencies/massdep/water/approvals/wetlands-and-waterways-forms.html#2.For additional information,contact MassDEP Waterways Program by email at dep.waterways@mass.gov or visit https://www.mass.gov/waterways-program-chapter-91. Regards, for MassDEP, (508)-946-2845 Andrew.Poyant@mass.gov 2