HomeMy WebLinkAboutRequest for a CoC WPA Form 8A-Saffordwpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
083-2291
Provided by DEP
A.Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1.This request is being made by:
Michael Talbot, Talbot Ecological Land Care
Name
6 Highland Circle
Mailing Address
Uncasville
City/Town
CT
State
06382
Zip Code
508-889-7172
Phone Number
2.This request is in reference to work regulated by a final Order of Conditions issued to:
Howard and MaryJo Safford
Applicant
07/26/2021
Dated
083-2291
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3.The project site is located at:
310 South Shore Drive
Street Address
Yarmouth
City/Town
26
Assessors Map/Plat Number
112
Parcel/Lot Number
4.The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County Book Page
1-436-250
Certificate (if registered land)
5.This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
083-2291
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).