HomeMy WebLinkAboutEngineer Certification Letter David B. Mason, RS, CSE
28 Powder Hill Road
Barnstable, MA 02630
TO: Yarmouth Health Department
FROM: David B. Mason ,
DATE: December 19, 2023
SUBJECT: 30 Ellis Circle, Yarmouthport, MA
The septic system installed at the subject location by Ellis Brothers
Construction was installed per the plan and the allowances
indicating compliance with the State Title V requirements.
The septic design plan as approved by the Yarmouth Health
Department met the requirements of Title V and the Yarmouth
Board of Health Regulatioins. Theinstallation of components and
elevations meets the requirements of the design plan.
The depth of soil was verified below the system as that
encountered during the soil analysis and groundwater was not
encountered.
This certification shall not act as a guarantee that the system will
operate as designed as such is dependent on the type of use and
disposal in the system by the owner.
DEC 2 `I 2023
HEALTH DEPT.