HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out_
Acreage
Street:
Commercial: Residential:_____
Village: Floor Plan:
a Bedrooms:_
Owner: Installer:
Address: Phone:
Phone:
Builder: Engineer:
Address: Phone:
Phone:
1. Required#of copies received N/A YES NO
2. Date of soils exam and percolation test not older than 2 years ' -
3. 4-5 ft of naturally occurring pervious material, above water table -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: -5. Water line 10 ft from s-'tic com.onents Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: -
8. Leachin_ minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:V I -
9. Leachin. minimum 100 ft from wetlands
Var.: I
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
I L ' skit inQ minimum 10 ft from .ro.ert line Var.:
�
1 12. System meets all other setback requirements Var.: _-- I�
11.111111111111.1111111111
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above ad.. water or bottom of test hole Var.:
15. System not into. or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", IA"preferred _IIIIIIIIII-
18. System meets breakout requirements Ell
19. Specified tee sizes are proper, gas baffle on outlet tee PVC liner: Wall:
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal _
22. System adequately sized for its intended use 1
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection pOrt on plastic chambers/leach field
26. Electrical permit forpump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
III 1
29. Vent .rovided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature _
33.H-20 loading is subject to vehicular traffic,groundwater __
34.Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow:
37. Check area lots for groundwater/Label groundwater in Assessor's Map gpd
Plan reviewed by: _