Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out_ Acreage Street: Commercial: Residential:_____ Village: Floor Plan: a Bedrooms:_ Owner: Installer: Address: Phone: Phone: Builder: Engineer: Address: Phone: Phone: 1. Required#of copies received N/A YES NO 2. Date of soils exam and percolation test not older than 2 years ' - 3. 4-5 ft of naturally occurring pervious material, above water table - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: -5. Water line 10 ft from s-'tic com.onents Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: - 8. Leachin_ minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:V I - 9. Leachin. minimum 100 ft from wetlands Var.: I 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: I L ' skit inQ minimum 10 ft from .ro.ert line Var.: � 1 12. System meets all other setback requirements Var.: _-- I� 11.111111111111.1111111111 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above ad.. water or bottom of test hole Var.: 15. System not into. or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", IA"preferred _IIIIIIIIII- 18. System meets breakout requirements Ell 19. Specified tee sizes are proper, gas baffle on outlet tee PVC liner: Wall: 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal _ 22. System adequately sized for its intended use 1 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection pOrt on plastic chambers/leach field 26. Electrical permit forpump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed III 1 29. Vent .rovided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature _ 33.H-20 loading is subject to vehicular traffic,groundwater __ 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: 37. Check area lots for groundwater/Label groundwater in Assessor's Map gpd Plan reviewed by: _