HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out_
Acreage Street:
Village:
•
Commercial: Residential:_ _
Floor Plan: #Bedrooms:
Owner: Installer:
Address: Phone:
Phone:
Builder: Engineer:
Address: Phone:
Phone:
1. Re.uired#of copies received N/A YES NO
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from s-'tic com.onents Var.: _
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation,deck Var.: _
8.Leachin. minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I I
--9. Leaching minimum 100 ft from wetlands
Var.:
10. Leachin• minimum 150 ft from drinking well/25 ft irrigation well Var.:
1111111111111111111111111
„` 7,F4 •'". '`rig minimum 10 ft from •ro.ert line Var.:
12. System meets all other setback requirements Var.:
11111.111111111111111
13. Uses ad.ustment for maximum high groundwater Var.:
14. Leachino set 4-5 ft above ad . water or bottom of test hole Var.: .0.1111111111111111111
15. S stem not in to. or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable
1111111.11111111.1
17. System meets slope requirements-min. 1/8", 'A"preferred
18. System meets breakout requirements PVC liner: Wall:
19. S•ecified tee sizes are .ro.er, vas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel -
21.No oarbage dis.osal
22. System ade uately sized for its intended use
23.Minimum 6"stone or come acted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit forpump chamber/Separate meter for duplexes
27.Pam. system-2"line,wee. hole,check valve, tee in dbox, •ump size
11111
28. Septic tank/pump chamber to be factory waterproofed
Illai
29. Vent •rovided if leachin below 3 feet,under driveway/parking
30. Buo anc calculations for tank/sumo chamber
31. En_'neer to ins r ect and certify soils: wall:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature commercial:
33.H-20 loading is sub.ect to vehicular traffic, : oundwater
34.T tl- V Aummutra j : era...�uuuryr Itaga_•. .
35.Foundation footino min. 2 feet above ad'usted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow:
37. Check area lots for groundwater/Label . oundwater in Assessor's Ma. gpd
Plan reviewed by:_ _