Loading...
HomeMy WebLinkAboutWY Parks OOC SE83-2410 RECORDEDMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 13l, g40 Bk 36■76 P3342 ÷■454 申■―■2-2024 a l~J8=4■QProvided by MassDEP: MassDEP File #:083-2410 eDEP Transaction #:1653441 CitylTown:YARMOUTH A. General Information l. Conservation Commission YARMOIIIH a ' 00C2. Issuance 3. Applicant Details a. First Name c. Organization d. Mailing Address e. City/Town 4. Properly Owner a. First Name c. Organization d. Mailing Address e. City/Town 5. Project Location a Strcct Addrcss 261,275,&281 ROUTE 28*ホ b.r Amended OOC b. Last Name f. State MA TOWN OF YARMOIIIH l146 ROUTE 28 SOUTH YARMOIIIH TOWN OF YARMOIIIH l146 ROUTE 28 SOUTHYARMOIIIII YARMOIIIH 37,37,38 41.65315N g.ZO COde o2664 b.Last Name l State MA b.City/rown d.Assessors Map/Pla畔 f Latitude a.Plan Title: CHASE BR00K PARK RESTOM■ON& PEDESm BRIDGE CONSRUCII10N SHEETS G-001, 002,003,C-101, 102,ANI)201 c. Zip Code e. Parcel,/Lot# g. Longitude g.Zip Code o2664 02664 61,60,1 70.25352W T.Dates a. Date NOI Filed : 121712023 b. Dare Public Hearing Closed: 12/2112023 S.Final Approved Plans and Other Documents 6. Property recorded at the Registry of Deed for: a. County bo Ce=trlcate c. Book d. Page 12816,32664,22511 132,305,319 c Datc Oflssuance: 1/8/2024 AS NO‐Db. Plan Prepared by: c. Plan Signed/Stamped by: d. Revised Final Date: e. Scale: CATH□田NE RICKS, COASTAL ENGINEERINTG 12/7/2023 P.E. CO. Page l of10*ELECTRONIC COPY ヽ、メ CHASE BR00K PARK RESTORAI10N& PEDES■uAN BRIDGE CONSRUmON SHEETS L-100, 201,202,203,301, 302,303 ヽ十o〔餘w(、セ B.Findings COASTAL ENGINEERING CRAWFORD LAND い AGEMttNT Provided by MassDEP: 卜〔ぉsDEP Fllc#:083-2410 eDEP Transaclon#:1653441 Ciリ ソT¨ 'レ 「ARⅣIm ASmm 鯛|ハ a. linear feet Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 13 I , $40 12/7/2023 町げキ COα 颯`<管 へOfttb r1 [z.ozi l.Findings pursuant to the Massachusetts Wetlands Protection Act Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission furds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. 17 Public Water Supply b. 17 Land Containing Shellfish c. tr Prevention of Pollution d. 17 PrivateWaterSupply e. 17 Fisheries f. 17 ProtectionofWildlifeHabitat 17 Ground Water Supply h. F Storm Damage Prevention i. 17 Flood Control 2. Commission hereby finds the project, as proposed, is: Approved subject to: a" !7 The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modi$ or differ fiom the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: b. r The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. s. f* The information submitted by the applicant is not sufficient to describe the site, the work or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of lntent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the Act , and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). ・「磁隠 鷺罵鏃∬請離潔i:1路 もI血 t°fpr.ed dSm島 狙ce and ie wetland Inland Resource Area Impacts:(For Approvals Only): Page2 of l0 * ELECTRONIC COPY Resource Area Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 13l, $40 Proposed Permitted Alteration Alteration hided by MassDEP: MassDEP Filc#:083-2410 cDEP Transac●on#:1653441 C″TOWn:YARMOIIIH Proposed Perllllitted Replacement Replacement 4.「Bank 5。「 Borderlng Vcgctatcd Wetland 6.「Land ullder Waterbodes and Waterways 7. r Bordering Land Subject to Flooding Cubic Feet Flood Storage 8.1- Isolated Land Subject to Flooding Cubic Feet Flood Storage 9.17 Riverfront Area Sq ft within 100 ft Sq ft between 100-200 ft Coastal Resource Area Impacts: Resource Area l0.r Designated Port Areas I l.I- Land Under the Ocean 12.「Barier Bcaches 13.「Coastal Bcaches 14.「Coastal Dunes 15.●Coastal Banks a. linear feet b.linear feet c. linear feet d. tirr"- feet d:q#tr;; A;quffit a. square feet b. square feet c. square feet a. square feet b. square feet c. square feet e. c/y dredged f. c/y dredged a. square feet b. square feet c. square feet d. square feet e. cubic feet a. square teet c. c"bic feet 1042s a. totat sq.EA ■cubic feet b. square feet d.cubic fcet 10425 g. cubic feet h. cubic feet e. cubic feet f. cubic feet b. total sq. feet c. square feet d. square feet e. square feet f. square feet g. square feet h. square feet i. square feet j. square feet Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement lndicate size under Land Under the Ocean, below a. square feet b. square feet ;c,/y dredged d. c/y dredged Indicate size under Coastal Beaches and/or Coastal Dunes below a. square feet b. square feet c. c/y nourishment d' c/y nourishment ;sqr-"EA b-: rq".. f""t -F;rttffiAi A;/fiffih-*t 28 28 a. linear feet b. linear feet Page 3 of10*ELECTRONIC COPY Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, $40 16.「Rocky lntertidal Shores 17.「Salt Marshes 18.「Land Under Salt Ponds a. square feet b. square feet a. square feet b. square feet c. square feet d. square feet a. square feet b. square feet .r4, dr"dged A;E drAg"d a. square feet b. square feet c. square feet d. square feet Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above .*/y dr"dg.d A;, dredged 21.fr Laad Subject to Coastal Storm Flowage 11773 11773 ". squ.r;Gi b. sq".re feet 7) l- Restoration/Enhancement (For Approvals Only) Ifthe project is for the purpose ofrestoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c & d or B.l7.c & d above, please entered the additional amount here. a. square feet of BVW 23. b. square feet of Salt Marsh !(Streams Crossing(s) If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. I a. number ofnew stream crossings b. number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modifu this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion ofprivate rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the P薫 》ided by MassDEP: MassDEP Flle#:083‐2410 cDEP Transac●on#:1653ZИl Ciリ ソT¨:YARMOUTH 19.奮 Land Containing Shellflsh 20.「Fish Rms Page 4 of l0 * ELECTROMC COPY Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 13l, $40 RЮ 宙dcd by MassDEP: MassDEP Filc#:083-2410 cDEP Transa減 on#:1653441 C″Tttn:YARMOIIIH extension date and the special circumstances warranting the extended time perioa are set forth as a special condition in this Order. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date ofthe Order. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work.. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, " Massachusetts Department of Environmental Protection" [or'MassDEP"] File Number :"083-241 0" Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a parry to all agency proceedings and hearings before Mass DEP. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. The work shall conform to the plans and special conditions referenced in this order. Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is signihcant enough to require the filing of a new Notice of Intent. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a dailybasis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notifu the Conservation Commission, which reseryes the right to 7. 9. 10. 12. Page 5 of l0 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. I 3 l, $40 Provided by MassDEP: MassDEP File#:083-2410 eDEP Transaction#:1653“1Ciリ ソT¨ '「 ARン 呻 require additional erosion and./or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS I 9. The work associated with this Order(the "Project") is ( I ) r is not (2) r subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a) All work, including site preparation, land disfurbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and./or treatrnent, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifoing the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard l0; rv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M PIan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the futrue responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention PIan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long- term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions l9(f) through l9(k) with respect to that BMP shall be a violation of ihe Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving Page 6 of l0 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. l3 I , $40 more ttran one lot, the legally binding agreement shall also identifu the lots that will be sewiced by the stormwater BMPs' A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. 0 The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g) The responsible party shall: l. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and./or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type ofmaterial and the disposal location;; 2. Make the maintenance log available to MassDEP and the Conservation Commission ('Commission;'; upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMp established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifring pervious areas for the purpose of the Low Irnpact Site Design Credit (as defined in the MassDEP Storrnwater Handbook, Volume 3, Chapter l, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l) Access for maintenance, repair, and,/or replacement of BMPs shall not be withleld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance l.Is a municipal wetlands bylaw or ordinance applicable?;7 Yes {- No 2.The Conservation Commission hereby(check one that applies): a[- DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw; O't APPROVES the proposed work, subject to the following additional conditions. RЮ 宙ded by MassDEP: ヽ1ぉ sDEP Filc#:o83‐2410 cDEP Transac●on#:1653441 Clty/「om:YARMOIIm 2.Citation CHAPTER 143l. Municipal Ordinance or Bylaw YARMOIIIH ヽ電T曰 俎¶DBYLAW Page 7 of 10 * ELECTRONIC COPY Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 13 1 , g40 3.The Commission orders that all work shall be perforrned in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modifu or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall conhol, The special conditions relating to municipal ordinance or bylaw are as follows: SEE ATTAC}IED SPECIAL CONDMONS PAGES 8A AND 88 RЮ 宙dcd by MassDEP: MassDEP Filc#:083-2410 cDEP Transac●on#:1653ZИl C″TOWn:YARMOUTH Page 8 of10*ELECTRONIC COPY WPA FORM s-ORDER OF CONDITIONS SPECIAL CONDITIONS-PAGE 8A OF 10 SE83-2410 Town of Yarmouth 261,275, and 281 Route 28 l. This Order shall apply to any successors and assigns in interest or control and any other person engaging in activity on the property identified in the Notice of Intent. 2. The applicant/owner shall be responsible for having a copy of the "Order of Conditions" on the job site at all times and shall be responsible for insuring that all persons performing the permitted activity are fully aware of its terms and conditions. Failure to do so may result in the revocation of these "Orders", a fine or both. 3. The Conservation Commission, its agent(s) or assigned(s) shall have the express right of entry upon the job site at all reasonable times for the purposes of establishing compliance with the "Order of Conditions", "By -Laws" and "Regulations". Commission members and the Conservation Administrator may acquire any information, measurements, photographs, observations and/or materials or may require the submittal of any datalinformation deemed necessary by this Commission for that evaluation.4. A preconstruction review shall be arranged by the contractor with the Conservation Administrator and shall occur prior to the commencement of any work. 5. Any change in the approved plan(s) shall require the Applicant to file, in writing, a notice of project change with this Commission. The Commission will determine the significance of the change and determine whether administrative approval or an "Amended Order of Conditions" is required. Should the project be changed without permission or found by the Yarmouth Conservation Commission to be altered in any way from the approved plan(s), all work will immediately cease untilthe project is reapproved by the Commission. 6. The "Order of Conditions" is valid for three years from the date of issuance unless otherwise specifically noted in the "Orders". Extension Permit requests must be applied for at least 30 calendar days prior to the expiration date of the originalOrders". Failure to do so will result in a new "Notice of Intent" filing.7. Noncompliance with these conditions shall constitute grounds for an Enforcement Order and possible fines. Fines shall not exceed $300.00 per day'per violation. 8. A "rvork linrit " line shall be established rvith Erosion Controls (i.e. strarv bales, staked filter fabric, bark mulch, "silt sacks", products made with r ice straw, and other weed-free products or approved by the Commission). Hay bales are not allowed. It is the applicant's responsibility to implement and maintain appropriate and adequate erosion controls measures throughout the construction process. 9. No work of any kind shall occur on the Resource Area side of the work limit line. This line shall be established prior to any construction or work. 10. All imported fill shallbe clean and not contain any foreign debris such as cement, bituminous concrete, rubber, metal, trash, boulders, etc. Boulders will be allowed in specific instances if part of the project design. I I . Debris, including litter, shall be picked up immediately. Any excess material that is excavated from the job site shall be disposed of at a location approved by the Conservation Administrator or in a covered dumpster. No debris shall be allowed in a Wetland or Waterway. 12. Washing of equipment/tools shall be done OFF -SITE or handled in a manner appropriate by the Conservation Administrator. 13. No equipment shall be refueled, nor shallfuelbe stored within 100 feet of a resource area. 14. Any area that is disturbed during construction shall be revegetated immediately or as soon after the growing season commences, with appropriate native plantings. Permanent stabilization shall be carried out in order to minimize erosion. 15. Native vegetation shall be planted per the approved plan. The vegetation shall be left UNDISTURBED. This is an on-going condition, in-perpetuity, that does not expire with the issuance of a Certificate of Compliance. The applicant must wait until the second growing season is complete before the Request for a Certificate of Compliance is submitted. During this time period, the Commission/Conservation Page 8a of10*ELECTRONIC COPY WPA FORM s-ORDER OF CONDITIONS SPECIAL CONDITIONS-PAGE 88 OF 10 SE83-2410 Town of Yarmouth 261,275, and 281 Route 28 Administrator may require additional plantings if it is determined that any specimens are dead or dying and need replacement. 16. No lawn shall exist beyond as shown on the approved plan. This is an ongoing condition, in perpetuity, that does not expire with the issuance of a Certificate of Compliance. 17. Landscape Debris, including leaves, grass clippings, brush, or other shall not be allowed within the wetland resource area. This is an on-going condition that does not expire with the issuance of a Certificate of Compliance. 18. Further alteration within the restoration or mitigation area is prohibited, except as may be required to maintain the area in its restored or mitigated condition. Prior to requesting the issuance of the Certificate of Compliance, the applicant shall demonstrate the restoration or mitigation has been successfully completed for at least two growing seasons. 19. Nourishment material shall be of equal grain size and appropriate slope to avoid premature loss from the beach and impacts to near shore bottom habitat. Grain size analysis shall be provided prior to nourishment activity. All beach nourishment material shall be placed above the MHW line to facilitate a more gradual distribution of sediment, allowing mobile organisms to avoid the area of impact and burrowing organisms to respond to a smaller sediment load. 20. The project shall consist of using only non -leaching types of treated lumber. CCA or creosote lumber is prohibited. 2l. No heavy construction equipment, vehicles or barges shall be permitted on a bordering vegetated wetland, saltmarsh or tidal flat during the construction. 22. A copy of the Chapter 9l license from DEP Waterways shall be submitted to the Conservation Commission. 23. A time-of-year (TOY) restriction shall be observed on all herbicide treatments to protect sensitive life stages of river herring. No herbicide treatment within the intertidal or wetland areas shall take place from April I - June 30 of any year. 24. Upon completion of the project, a "Request for a "Certificate of Compliance" shall be submitted by the applicant to the Conservation Commission for review. The "Order of Conditions" shall be considered incomplete until the "Certificate of Compliance" is issued by the Conservation Commission and recorded at the Registry of Deeds. Findings: The use of lawn, even in the form of drought tolerant no-mow fescue is generally not allowed within the 35-foot no disturb zone in the Town of Yarmouth. Due to the importance of close interaction with nature for public benefit and education, the commission decided to allow a small amount of no-mow fescue lawn within this area for public benefit and enjoyment of the resource areas. It was also taken under consideration that this area was formerly developed with the Yankee Village hotel, and the restoration plan overall is a vast improvement over the previously developed lot. Page 8b of10*ELECTRONIC COPY Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, $40 E. Signatures This order is valid forthree years from the date of issuance, unless otherwise specified pursuant to General condition #4. If this is an Amended order of Conditions, the Amended order expires on the same date as the original order of Conditions. Please indicate the number of members who will sign this form. This order must be signed by a majority of the Conservation Commission. Provided by MassDEP: MassDEP File #: SE083-2410 eDEP Transaction #: 1653441 City/Town: YARMOUTH '/(/ zozq l. Date of Original Order Ll\ --r 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental protection Regional Office, if not filing electronically, and the property owner, if different from applicant E by certified mail, retum receipt requested, on Date /*n^ odelivery on Date \ | t\eozt F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The requesl must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 3 l0 CMR 10.03(7) within ten busineis days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the conservation commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act BARNSTABLE REG:STRY OF DEEDS John F. Meade, Reglstar rage j of [U* ELECTRONIC COPY PЮ 宙ded by MassDEP: MassDIP Flle#:083-2410 cDEP Transaction#:1653441 Gッ T∝咀:YARMOIIIII Suり eCttO the Order ofCondidons.The recording mfomation on this page shall be subnutted to the Conservation Conlmission listed below. YARMOUTH Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: YARMOLIIH Conservation Commission Please be advised that the Order ofConditions for the Project at: 261,275,&281 ROUTE 28** Project Location Has been recorded at the Registry of Deeds of: 083-2410 MassDEP Filc Number County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book ln accordance with the Order of Conditions issued on: Instrument Number If registered land, the document number identifuing this transaction is: Document Number Signature of Applicant Page Date Irrecorded' r gf 1 lg -Tr F+T ÷■454 4■Q■■―■2-2●24 a 08= Page 10 of10■ELECTRONIC COPY ヽく Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, 940