Loading...
HomeMy WebLinkAboutEngineer PlanN > v ® { D C" O `c ° V CD C r CD Ln ° o a m CD Amstead Rd Quartermaster Row Windjammer Lane LOCUS LOCUS MAP NOT TO SCALE Yarmouthuth Health Department ® 1�TED Name Date OF 4gss9cyG o PETER T. MCENTEE CIVIL No. 35109 LEGEND -- 98 -- EXISTING CONTOUR x 100.98 EXISTING SPOT GRADE —W EXISTING WATER SERVI —0.H. W.— OVERHEAD WIRES TEST PIT BENCHMARK 106' t (LOTS 14 & 17) 22,080 S.F.t 103,05 X PARCEL ID: 77-64 PLAN REFERENCE ENGINEERED PLAN BY ENGINEERING WORKS INC. JC ENGINEERING INC., DATED 8/8/2011 OWNER OF RECORD COELHO, JOSEPH F COELHO, KATHLEEN M 90 QUARTERMASTER ROW SOUTH YARMOUTH, MA 02664 CB/TIPPED EXISTING CESSPOOLS E N 79*21144„ 2280, 102.49 x PROPOSED S.A.S.a\ 3-500 GALLON CHAMBERS SURROUNDED WITH 3.5' OF STONE, ALL SIDES /iIS7 �► Ift- PARTIAL STRIPOUT SEE NOTE 11, SHEET 2 7 (STING D—B IN .(IN)=98.9 PROPOS��-SEW R CONNE 100.76 INV.(IN)--9.96t _ \L=35.02'. R=906-.-c�o 100.61 edge cb co S 7( 4 f 108.00' ABOVE GROUND Z� POOL ` t O `w� . 102,572E A 103,23 x 103.16 '1EXISTING , HOUSE(#90 T.O.F.=103.9� 10�5I� 103, K 102� '� �'08 -- 1)z2 �. -- a�' x 102,69 L=122.20' ------ --- R=900.00' - ] T 100,61 of povem nt -/ E-R&A S BENCHMARK-2 TOP OF TANK, EL.=101.35 RECEIVED EXISTING SEPTIC TANK JAN 10 2024 INV.(OU )=100.00-± 101.35 HEALTH DEPT. BENCHMARK-1 ICOR.IBOTT STEP, EL.=104.25 100,43 100.33 Rojv SPIKE + T 103.34 001a EJ w w N LrL m 103.60GA _ -102 77, DDL nIVE �. 100.68 100,64 100,54 100.27 100 27 100,15 100.06 CO Q C1t a PROPOSED SEPTIC SYSTEM UPGRADE PLAN 90 QUARTERMASTER ROW, SO. YARMOUTH, MA Prepared for: Robert B. Our, 24 Great Western Rd, Harwich, MA 02645 Engineering by: SCALE DRAWN JOB. NO. Engineering Works, Inc. 1"=20' P.T.M. 105-24 12 West Crossfield Road, Forestdale, MA 02644 DATE CHECKED SHEET NO. (508) 477-5313 1 /02/24 P.T.M. 1 Of 2 SEPTIC TANK INSTALL RISERS & COVERS OVER INLET & OUTLET AND SET TO 6" OF FINISH GRADE EXISTING NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS, PRIOR TO INSTALLATION. 2) D-BOX SHALL BE SET LEVEL AND TRUE TO GRADE ON A MECHANICALLY COMPACTED STABLE BASE OR OR SIX INCH AGGREGATE BASE, AS SPECIFIED IN 310 CMR 15.221(2). 3) INSTALL INLET & OUTLET TEES AS REQUIRED, 4) A GAS BAFFLE SHALL BE INSTALLED ON OUTLET TEE AS MANUFACTURED BY TUF-TITE, ZABEL OR EQUAL. NOTE: TO PREVENT BREAKOUT, THE PROPOSED FINISH GRADE SHALL NOT BE < EL.=98 FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE S.A.S. PROPOSED D-BOX INSTALL RISER & WATERTIGHT PROPOSED S.A.S. COVER SET TO 6" OF GRADE INSTALL ONE RISER TO GRADE FOR INSPECTION PORT TOP CONC. ELEV.=99.5t BREAKOUT ELEV.=98.95 INV. ELEV.=98.45 BOTTOM ELEV.=96.45 - 4' OF NATURALLY OCCURRING PERVIOUS MATERIAL 5' (MIN.) ABOVE G.W. BOTTOM OF TEST PIT, EL.=91.5 SEPTIC SYSTEM PROFILE N.T.S. DESIGN CRITERIA NUMBER OF BEDROOMS: 3 BEDROOMS SOIL TEXTURAL CLASS: CLASS I DESIGN PERCOLATION RATE: <2 MIN/IN DAILY FLOW: 330 G.P.D. DESIGN FLOW: 330 G.P.D. GARBAGE GRINDER: NO LEACHING AREA REQUIRED: (330) = 445.9 S.F. .74 EXISITNG SEPTIC TANK: 1500 GALLON CAPACITY PROPOSED D-BOX: 1 INLET, 4 OUTLET (MINIMUM), H-20 RATED USE 3-500 GALLON LEACHING CHAMBERS IN SERIES SURROUNDED BY 3.5' DOUBLE WASHED STONE -ALL SIDES SIDEWALL AREA: 2 x (11.8' + 325) x 2' = 177.2 SF BOTTOM AREA: 11.8' x 32.5' = 383.5 SF TOTAL AREA: .......... : ............................................. 560.7 SF DESIGN FLOW PROVIDED: 0.74 GPD/SF(560.7 SF) = 414.9 GPD F.G. EL.=102.4f -2" LAYER OF 1/8" TO 1/2" DOUBLE WASHED STONE (OR APPROVED FILTER FABRIC) " TO 1-1/2" DOUBLE WASHED STONE .�• • no • ::• .111 . •. .•�► 5' 1- 3 x 8.5' = 25.5' EFFECTIEVE LENGTH = SOIL LOG DATE: AUGUST 3, 2011 SOIL EVALUATOR: PETER McENTEE (SE#1542) WITNESS: AMY VON HONE HEALTH AGENT ELEV. TP DEPTH 102.5 0 A LOAMY SAND 10YR 4/2 102.0 B 16" LOAMY SAND 10YR 5/8 99.5 36" C PERC 34"/46" MED. SAND 2.5Y 6/4 91.5 1 122" PERC RATE <2 MIN/IN.("C" HORIZON) NO GROUNDWATER ENCOUNTERED GENERAL NOTES: 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. 2• ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE LOCAL RULES AND REGULATIONS. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON ASSUMED DATUM. 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE:CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED S.A.S. 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE DIRECTED BY THE APPROVING AUTHORITIES. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION. 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S.A.S. AND REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY HEALTH DEPARTMENT PRIOR TO BACKFILL. 13. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY. SEPTIC LAYOUT PROPOSED SEPTIC SYSTEM UPGRADE PLAN 90 QUARTERMASTER ROW, SO. YARMOUTH, MA Prepared for: Robert B. Our, 24 Great Western Rd, Harwich, MA 02645 Engineering by: SCALE DRAWN JOB. NO. Engineering Works, Inc. NTS P.T.M. 105-24 12 West Crossfield Road, Forestdale, MA 02644 DATE CHECKED SHEET NO. (508) 477-5313 1 /02/24 P.T.M. 2 Of 2