Loading...
HomeMy WebLinkAbout32693-01-10-24-RS.xls - Compatibility Modec.r.s.i.rev2,02 Concrete Reinforcing Steel Report Briggs Engineering & Testing PROJECT: A Division of PK Associates, Inc.PROJECT#: INSPECTOR: EMP.#:REPORT#:DATE:CODE: PAGE OF TEMP.:H 50F L 40F WIND: H 15 mph L 10 mph HUMID: H 85%L Reinforcing steel was inspected for arrangement, cleanliness and checked against working drawings and reference specifications of ACI-301 for the following items. Check marks indicate compliance. All items in non-compliance are either corrected during inspection or noted below. Size and location:Clearance to forms: Grade Strength:Extra bars at openings: Splice Lapping:Adequate ties: Spacing:Concrete coverage: Supports:Stirrup spacing: Location and Drawing #:Spread footings- at AP59, AP13 & 62, AP12, AP102, AP19 Piers/ pedestals- at AP59, AP 13 & 62, AP12, AP102, AP19, AP61, AP63, AP17, AP18, AP20, AP60, AP64 Runout tank walls- elevations E, F, G, H Drawing #'s:Plans By Rebars & Mesh/ R1.01, R1.02, R1.03, R1.04, R1.05, R1.06, R1.07, Dated 10/17/23 Plans By Rebars & Mesh/ R2.03, R2.04, Dated 12/27/23 Remarks:A reinforcing steel inspection was performed for the above location. All reinforcing steel inspected conformed with the appropriate drawings/ specifications. Note: All test results and findings contained within this report are limited to the areas indicated. 100 Weymouth St., Unit B-1, Rockland, Ma 02370 100 Pound Rd., Cumberland, RI 02864 Approved: Director of Field Operations:YH √ Sean Skorohod WICKED WAVES CC INFLAT PARK 32693 Robert Carter 01/10/24 √ Sean Skorohod √ √ √√ √ √ √ √