Loading...
HomeMy WebLinkAbout21-094 Christopolous Request for Partial Cert of Compliance939 main street rte 6a yarmouth port mass 02675 down cape engineering, inc civil engineers & land surveyors TRANSMITTAL JANUARY 18, 2024 FROM: HEATHER CORNELL HCORNELL@DOWNCAPE.COM YARMOUTH CONSERVATION RE: 47 NICKERSON FARM WAY SOUTH YARMOUTH tel. (508) 362-4541 fax (508) 362-9880 PARTIAL CERTIFICATE OF COMPLIANCE DCE#21-094 CHRISTOPOULOS SE83-2293 METHOD OF DELIVERY: DROP OFF /. Please find attached documents to support a Request for a Partial Certificate of Compliance for 47 Nickerson Farm Road in South Yarmouth, including: • Statement from Down Cape Engineering • WPAForm8A • Site Photos • Filing Fee CC: FILE 939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system design s inspections permits down cape engineering, inc civil engineers & land surveyors January 17, 2024 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE83-2293 (47 Nickerson Farm Way) Dear Commission Members, tel. (508) 362-4541 fax (508) 362-9880 Dani el A. Ojala, P.E., P.L.S. Arne H. Ojala P.E., P.L.S. Dani el E. Gonsalves, P.E., S.E. Craig J . Ferrari, E.I.T., S.E. In September 2021 , the Commission issued an Order of Conditions for the above-referenced site, for the construction of a new single family residence. A site visit was made to review site conditions relative to the Order. The proposed work was found to be constructed in substantial compliance with the approved plan and Order of Conditions. Final site landscaping was completed in October 2023; Special condition #19 in the Order of Conditions requires 2 years of monitoring repotis. Therefore, we are requesting a pa1iial ce1iificate of compliance at this time . Site photos are enclosed for review . This is to ce1iify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions, with the above- mentioned exception of monitoring repo1is on the plantings. We respectfully request the issuance of a paiiial Ce1iificate of Compliance. After the plantings have survived two years and the required monitoring repo1is are submitted we will request a final Ce1iificate of Compliance . Thank you for your consideration . Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Page 1 of 1 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 8A -Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information DEP File Number: SE83-2293 Provided by DEP Important: When filling out 1. This request is being made by : forms on the computer, use only the tab key to move your cursor - do not use the return key . ~ ~ Daniel Christopoulos Name PO Box 1120 Mailing Address South Yarmouth · City/Town Phone Number MA State 2. This request is in reference to work regulated by a final Order of Conditions issued to: Daniel Christopoulos Applicant 9-13-2021 SE83-2293 02664 Zip Code Dated Upon completion 3 of the work . The project site is located at: DEP File Number authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 47 Nickerson Farm Way Street Address 118 Assessors Map/Plat Number Yarmouth City/Town 23.2 Parcel/Lot Number 4 . The final Order of Conditions was recorded at the Registry of Deeds for: Daniel Christopoulos Property Owner (if different) Barnstable • County Certificate (if registered land) 5. This request is for certification that (check one): 34511 Book 169 Page D the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. C8] the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). Construction of the House, septic, driveway and pool are complete. Final landscaping was recently completed in October 2023. Special condition #19 in the Order of Conditions requires 2 years of monitoring on the plantings and is the only outstanding item remaining. D the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaformBa .doc .. rev. 5/29/14 Pag e 1 of2 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 8A -Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) DEP File Number: SE83-2293 Provided by DEP 6 . Did the Order of Conditions for this project , or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer , architect, landscape architect, or land surveyor? IX] Yes □ No If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. B. Submittal Requ irements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision , submit this request to the appropriate DEP Regional Office ( see http ://www. mass. gov /eea/ag encies/massd ep/a bouUcontacts/fi nd-th e-massdep-reg ion a 1-office- for-you r-city -or-town . html ). wpaformBa .doc •· rev. 5/29/14 Page 2 of 2