HomeMy WebLinkAbout21-094 Christopolous Request for Partial Cert of Compliance939 main street rte 6a
yarmouth port
mass 02675
down cape engineering, inc
civil engineers & land surveyors
TRANSMITTAL
JANUARY 18, 2024
FROM: HEATHER CORNELL
HCORNELL@DOWNCAPE.COM
YARMOUTH CONSERVATION RE: 47 NICKERSON FARM WAY
SOUTH YARMOUTH
tel. (508) 362-4541
fax (508) 362-9880
PARTIAL CERTIFICATE OF COMPLIANCE
DCE#21-094 CHRISTOPOULOS
SE83-2293
METHOD OF DELIVERY: DROP OFF
/.
Please find attached documents to support a Request for a Partial Certificate of
Compliance for 47 Nickerson Farm Road in South Yarmouth, including:
• Statement from Down Cape Engineering
• WPAForm8A
• Site Photos
• Filing Fee
CC: FILE
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
design s
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
January 17, 2024
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE83-2293 (47 Nickerson Farm Way)
Dear Commission Members,
tel. (508) 362-4541
fax (508) 362-9880
Dani el A. Ojala, P.E., P.L.S.
Arne H. Ojala P.E., P.L.S.
Dani el E. Gonsalves, P.E., S.E.
Craig J . Ferrari, E.I.T., S.E.
In September 2021 , the Commission issued an Order of Conditions for the above-referenced
site, for the construction of a new single family residence.
A site visit was made to review site conditions relative to the Order. The proposed work was
found to be constructed in substantial compliance with the approved plan and Order of
Conditions. Final site landscaping was completed in October 2023; Special condition #19 in
the Order of Conditions requires 2 years of monitoring repotis. Therefore, we are requesting a
pa1iial ce1iificate of compliance at this time . Site photos are enclosed for review .
This is to ce1iify, to the best of my knowledge and belief, that the work was performed in
substantial compliance with the approved plan and Order of Conditions, with the above-
mentioned exception of monitoring repo1is on the plantings. We respectfully request the
issuance of a paiiial Ce1iificate of Compliance. After the plantings have survived two years
and the required monitoring repo1is are submitted we will request a final Ce1iificate of
Compliance .
Thank you for your consideration .
Very truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
Page 1 of 1
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
WPA Form 8A -Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
DEP File Number:
SE83-2293
Provided by DEP
Important:
When filling out 1. This request is being made by :
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key .
~
~
Daniel Christopoulos
Name
PO Box 1120
Mailing Address
South Yarmouth
· City/Town
Phone Number
MA
State
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Daniel Christopoulos
Applicant
9-13-2021 SE83-2293
02664
Zip Code
Dated
Upon completion 3 of the work . The project site is located at:
DEP File Number
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
47 Nickerson Farm Way
Street Address
118
Assessors Map/Plat Number
Yarmouth
City/Town
23.2
Parcel/Lot Number
4 . The final Order of Conditions was recorded at the Registry of Deeds for:
Daniel Christopoulos
Property Owner (if different)
Barnstable
• County
Certificate (if registered land)
5. This request is for certification that (check one):
34511
Book
169
Page
D the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
C8] the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
Construction of the House, septic, driveway and pool are complete. Final landscaping was
recently completed in October 2023. Special condition #19 in the Order of Conditions requires 2 years of
monitoring on the plantings and is the only outstanding item remaining.
D the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaformBa .doc .. rev. 5/29/14 Pag e 1 of2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
WPA Form 8A -Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
DEP File Number:
SE83-2293
Provided by DEP
6 . Did the Order of Conditions for this project , or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer , architect, landscape
architect, or land surveyor?
IX] Yes
□ No
If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
B. Submittal Requ irements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision , submit this request to the appropriate DEP Regional
Office ( see http ://www. mass. gov /eea/ag encies/massd ep/a bouUcontacts/fi nd-th e-massdep-reg ion a 1-office-
for-you r-city -or-town . html ).
wpaformBa .doc •· rev. 5/29/14 Page 2 of 2