HomeMy WebLinkAbout188 Berry Ave Memo to contractor re YHC and Demo 9.1.2015Vozella, Beth
From: Vozella, Beth
Sent: Tuesday, September 01, 2015 2:22 PM
To: .slhetz@hotmail.com'
Subject: 188 Berry Ave.
Hello Steven -
When you have a moment, please give me a call at 508-398-2231 X1292. I would like to discuss our recent conversation
regarding 188 Berry Ave. I believe we discussed the possibility of you razing and rebuilding a garage along with some
other updates/renovations at this location. What I don't recall is if there is a timetable for these projects.
Because the garage is over 75 years old, the raze and rebuild is subject to review by the Yarmouth Historical
Commission. Once the application for demolition is submitted to the Building Department, the YHC has ten days to
make a determination as to whether or not the structure proposed for demolition is "significant". This review includes a
site visit by the YHC followed by a meeting at the Town Hall at which the Owner/Contractor will be asked to present the
raze/rebuild plans. A determination is usually made during this meeting.
I will brief the YHC on this possible raze/rebuild at the next meeting which is scheduled for Thursday, September 10,
2015 at 3:00. If you are available, this would be a good opportunity for you to attend and discuss your plans. Please let
me know by this Friday, September 4th if this is something you think you may be interested in doing.
I look forward to hearing from you.
Sincerely,
-Beth
Beth Vozella
Office Administrator
Yarmouth OKH Committee/Historical Commission
Town of Yarmouth
1146 Route 28, South Yarmouth, MA 02664-4451
Tel: 508-398-2231 X 1292
Fax: 508-398-0836