HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot /? 1 Zone of Contribution: In_ Out Acreage
/ Commercial: Residential: i/
Street: .3j C./r��t„v 4 rl
Village: Floor Plan:�_s LA 5 -r, :1.... #Bedrooms:
����� I/ c' Installer: 1.7?.4(r. GO� r
Owner: r,2A lfl 1dl 0 ri
Address: :-97 /;I r-3 51 Phone: 47/3 09 y/- i.-
Phone: {}
Builder: Engineer: a L,' C9 LI, I1 y 6 L iT /E Co fie et
Address: Phone: 55-- 3 t1 - G 5 `3
Phone:
N/A YES NO
1. Required#of copies received _=-
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: i/
5.Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation,deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 3,5 l s
9.Leaching minimum 100 ft from wetlands Var.: ✓
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: v
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: t,
14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L
15. System not in top or subsoil(A,B horizons)or 5' removal t,
16. Proposed contours are suitable v
17. System meets slope requirements-min. 1/8", 'A"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee .,
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal `.
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pu -chamberto'be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater
34. Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max.flow: gpd
37. Check area lots for groundwater/Label groundwater' e or's Map
Plan reviewed by: / -p7 3 02`( 1 6/03/03
i
I
I