Loading...
HomeMy WebLinkAboutEngineer PlanLEGEND 'gar an HreSiAfn �'oa 67 - - EXISTING CONTOUR a x 100.98 EXISTING SPOT GRADE OVERHEAD WIRES y JAN 10 2024 G EXISTING GAS SERVICE „ 2 77 HEALTH DEPT. EXISTING CESSPOOL W EXISTING WATER SERVICE TO BE PUMPED, FILLED M/TH ® `�_ SAND AND ABANDONED TEST PIT BENCHMARK N LOCUS LABAN LANE ® Q 99.02 edge of pavement P 00 ET LOCUS MAP 99,77 ,_,. �-' -- ,00 GENERAL NOTES: 100.47 18• 101.0 99,78 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL 75.00 100.68 x R�2 BOARD OF HEALTH AND THE DESIGN ENGINEER. 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS x100,69 -9� �� 100,8 F� OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE ] LOCAL RULES AND REGULATIONS, EXCEPT AS REQUESTED BELOW: a 1 -310 CMR 15.405(b)- LOCAL UPGRADE APPROVAL �� Myl Q-i-1® - 1) A 10' variance, S.A.S. to cellar wall, fora 10' setback. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR EXISTING SEPTIC TANK TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE TOP OF TANK, EL.=100.14 DESIGN ENGINEER. INV.(OUT)=98.80(UERIFY) 101,01 x 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING r --0 n FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN 100.73 M� ENGINEER BEFORE CONSTRUCTION CONTINUES. 101.72 5. ALL ELEVATIONS BASED ON AN ASSIGNED DATUM. 3 101,40 0 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF '0 100.93 THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF 1014 �_f HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. EXISTING _ 101,56 z 0 r,, 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 0 PATIO HOUSE(#423) r , x 0 0 GARAGE T.O.F.=101.9i' I P 21 v q 8. THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED S.A.S. cn I o (,t ° °' 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS 0 `D AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE SPIKE 4 3 ;. DIRECTED BY THE APPROVING AUTHORITIES. L7ae nth HM4th Deb*::; a._.iLt�C � 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ff`T •D f I✓ THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING 101,56, f 1C-�--�-CONSTRUCTION. PATIO 101,38 x TP 11 x11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS LOT 19 / Date IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S.A.S. AND 9,583±S.F. 10'� 13 REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE 0 INSPECTED BY DESIGN ENGINEER PRIOR TO BACKFILL. N 13. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND 101,17x 101.04 NOT CONSIDERED TO BE A PROPERTY LINE SURVEY. 102.32 x 101.31 102.56 OF M 14. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED SEPTIC x 100.00 �P��� ASSSYSTEM COMPONENTS NOT SHOWN ON THE PLAN. TUMP � G S 89' 16'S0" E S102,69 o PETER T. �, MAP ID: 1 00- 7 A BENCHMARK McENTEE of # � COR.IBOTT. STEP U NoC1VIL 35109 N PROPOSED SEPTIC SYSTEM UPGRADE PLAN EL.=102.08 ) IC nR0 �Tx i, F £G/STE 423 NORTH MAIN STREET, YARMOUTH PORT, MA d&tI �HOOD PROPOSED S.A.S. Prepared for: 423 North Main St LLC, 12 Courtyard Place, Lexington, MA 02420 Na 35031 s .A.S. Z t d 2-500 GAL CHAMBERS 1 )�1 3 Engineering by: Surveying by: SCALE DRAWN JOB. NO. SURROUNDED WITH STONE OWNER OF RECORD Engineering Works, Inc. Richard J. hood PL5 N.T.S. P.T.M. 262-23 423 NORTH MAIN STREET LLC 12 West Crossfield Road 12 Settlers Path DATE CHECKED SHEET N0. �Y. a ��;•.y 12 COURTYARD PLACE Forestdole, MA 02644 Sandwich, MA 02563 LEXINGTON, MA 02420 (508) 477-5313 (508) 246-6260 11/17/23 P.T.M. 2 Of 2 PROPOSEDEXISTING SEPTIC TAN :_• PROVIDE OVER • MANHOLES AND SET WITHIN 6" OF FINISH GRADE SET TO 6" OF GRADE T.O.F=101.9± 00EL.=101.5 ,loll @ I - as owawana S 01 . c0 . VC EXISTING -'j 48" LIQUID - 1 LEVEL ADD GAS NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPES & INVERTS EXITING HOUSE, PRIOR TO INSTALLATION. 2) D-BOX SHALL BE SET LEVEL AND TRUE TO GRADE ON A MECHANICALLY COMPACTED SIX INCH CRUSHED STONE BASE, AS SPECIFIED 310 CMR 15.221(2). 3) INSTALL INLET & OUTLET TEES AS REQUIRED. 4) A GAS BAFFLE SHALL BE INSTALLED ON OUTLET TEE AS MANUFACTURED BY TUF-TITE, ZABEL OR EQUAL. DESIGN CRITERIA NOTE: TO PREVENT BREAKOUT, THE PROPOSED FINISH GRADE SHALL NOT BE < EL. 98.0 FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE S.A.S. PROPOSED S.A.S. INSTALL RISER & COVER OVER ONE CHAMBER AND SET TO 3" OF F.G. TO SERVE AS INSPECTION PORT F.G. EL.=101.5f MAINTAIN 2% SLOPE OVER S.A.S. f-2" LAYER OF 1 /8" TO 1 /2" DOUBLE WASHED STONE (OR APPROVED FILTER FABRIC) liP�INV.=97.70 2' EFF. a�aaaa®DEPTH aaaaaaa-3/4" TO 1-1/2" DOUBLE 2.6' 4.8' 2.6' WASHED STONE INV.=97.87 INV.=98.8f D-BOX EFFECTIVE WIDTH = 10' (VERIFY) 3 OUTLETS INV.=97.50 H-10 2-500 GALLON LEACHING CHAMBERS WITH STONE AROUND AND BETWEEN CHAMBERS AS SHOWN INSTALL PIPE H-10 RATED BETWEEN CHAMBERS TOP CONC. ELEV.= 98.8t 41 BREAKOUT ELEV.= 98.00 INV. ELEV.= 97.50 aaBE a a®B ' / EXISTING ' / HOUSE(#423) T.O.F.=101.9f' PROPOSED S.A.S. 2-500 GAL CHAMBERS SURROUNDED WITH STONE BOTTOM ELEV.= 95.50 a ' 4' ENDS 8.5' 4' S.A.S. LAYOUT 4' OF NATURALLY OCCURRING EFFECTIVE LENGTH = 29.0' PERVIOUS MATERIAL 5' ABOVE GROUNDWATER LEACHING SYSTEM SECTION NO GROUNDWATER, EL.=90.00 - 3/4" TO 1-1/2" DOUBLE -- ---- ------ ----- WASHED STONE 423 North Main Street, South Yarmouth, MA SEPTIC SYSTEM PROFILE 3" LAYER OF , DOUBLE WASHED HEED STT ONEE I (OR APPROVED FILTER FABRIC) Gil Bedroom t dl I 11'X 36' NUMBER OF BEDROOMS: 3 BEDROOMS SOIL TEXTURAL CLASS: CLASS I (LOADING RATE=0.74 GPD/SF) DESIGN PERCOLATION RATE: <2 MIN/IN DAILY FLOW: 330 GPD DESIGN FLOW: 330 GPD GARBAGE GRINDER: NO -not allowed with design LEACHING AREA REQUIRED: (330 GPD) = 445.9 SF .74 GPD/SF EXISTING SEPTIC TANK: 1000 GALLON CAPACITY PROPOSED D-BOX: 1 INLET, 3 OUTLET (MIN.), H-10 RATED USE 2-500 GALLON LEACHING CHAMBERS IN SERIES WITH STONE AROUND AND BETWEEN CHAMBERS (10.0' x 29.01 SIDEWALL AREA: 2(10.0' + 29.0') X 2 = 156.0 SF BOTTOM AREA: 10.0' x 29.0' = 290.0 SF TOTAL AREA: ................................................. .... ...... 11.446.0 SF DESIGN FLOW PROVIDED: 0.74 GPD/SF(446.0 SF) = 330.0 GPD SOIL LOG DATE: NOVEMBER 13, 2023 SOIL EVALUATOR: ANNA WIMMER SE-14615 WITNESS: BARRY LEWIS HEALTH AGENT ELEV. T P -1 DEPTH ELEV. T P- 2 DEPTH 101.5 A 011 101.5 q 10" LOAMY SAND 100.5 B 10YR 4/2 LOAMY SAND 10YR 5/6 98.7 C1MED. SAND 98.2 10YR 5/6 2MED. SAND 97.9 2.5Y 6/4 3MED. SAND 5 96.2 C4YR 5/8 MED. SAND 2.5Y 7/3 LOAMY SAND 10YR 4/2 12" 100.5 B LOAMY SAND 10YR 5/6 34" 98.7 1MED. SAND 10YR 5/6 40" 98.2 2MED. SAND 2 .5Y 6/4 44" 97.9 3MED. SAND 5YR 5/8 63" 96.2 C4 MED. SAND 2.5Y 7/3 90.0 138" 90.0 PERC RATE <2 MIN/IN. "C" HORIZON NO GROUNDWATER ENCOUNTERED 12" 34" 40" 44" 63" 138" a"xtyeoot,t ._a Mill SECOND FLOOR tag:tr ,� tr.ts II a tr.m j tr�tr FIRST FLOOR BASEMENT PROPOSED SEPTIC SYSTEM UPGRADE PLAN 423 NORTH MAIN STREET, YARMOUTH PORT, MA Prepared for: 423 North Main St LLC, 12 Courtyard Place, Lexington, MA 02420 Engineering by: Surveying by: SCALE DRAWN JOB. NO. Engineering Works, Inc. Richard J. Hood PL5 N.T.S. P.T.M. 262-23 12 West Crossfield Road Forestdole, MA 02644 12 Settlers Path Sandwich, MA 02563 DATE CHECKED SHEEP NO. (508) 477-5313 (508) 246-6260 11/17/23 P.T.M. 2 Of 2