Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot 6 71 6 Zone of Contribution: In .- Out_ Acreage Commercial: Residential: Street: lU ,.crrfat ( vA Village: S'y Floor Plan: # Bedrooms: Owner: it)d U 0 GC//V1 & Installer: -i-LAI F: ems. Address: `v ASri;t& Lv. Phone: c-ba. 3 ti _ ,2 is 1 Phone: Builder: Engineer: 4 attLi 6'y) L.1,10'- 'tI Address: Phone: 7?ti_ 7i(-,7 i(i3 Phone: N/A YES NO 1. Required#of copies received iv 2. Date of soils exam and percolation test not older than 2 years 1/ 3. 4-5 ft of naturally occurring pervious material,above water table L, 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: v 5. Water line 10 ft from septic components Var.: v. 6.Benchmark indicated and shown-NGVD if near wetlands v 7. Septic tank minimum 10 ft from foundation,deck Var.: v 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred i/ 18. System meets breakout requirements PVC liner: Wall: ;/ 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use ✓ 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed ,f 29.Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: )/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t 33. H-20 loading is subject to vehicular traffic,groundwater ✓ 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: /_,2' -0311 ` l 6/03/03