Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot 90/►S a Zone of Contribution: In Out /Acreage nn Commercial: Residential: / Street: 5-6 1��,b h ce �►Q;�-. 1 Jcti� / Village: Sy Floor Plan: V # Bedrooms: ‘./ Owner: r u,. ►Js S � 1 Uc� Installer: _ (� 6� Address: Phone: 77- 1s*?7 Phone: Builder: Engineer: Address: Phone: co c, '23 o 3-9 Phone: N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years ✓ 3.4-5 ft of naturally occurring pervious material,above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ./ 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: / 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons)or 5' removal V 16. Proposed contours are suitable r/ 17. System meets slope requirements-min. 1/8", '/"preferred ✓ 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ✓ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox r/ 24.Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system -2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking Z. • 30. Buoyancy calculations for tank/pump chamber ."" 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic,groundwater 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater i is Ma Plan reviewed by: (-�GI O Z 6/03/03