SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot 90/►S a Zone of Contribution: In Out /Acreage
nn Commercial: Residential: /
Street: 5-6 1��,b h ce �►Q;�-. 1 Jcti� /
Village: Sy Floor Plan: V # Bedrooms: ‘./
Owner: r u,. ►Js S �
1 Uc� Installer: _ (� 6�
Address: Phone: 77- 1s*?7
Phone:
Builder: Engineer:
Address: Phone: co c, '23 o 3-9
Phone:
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years ✓
3.4-5 ft of naturally occurring pervious material,above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ./
5. Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation,deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: /
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: ✓
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal V
16. Proposed contours are suitable r/
17. System meets slope requirements-min. 1/8", '/"preferred ✓
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal ✓
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox r/
24.Manhole covers within 6"of grade,pump chamber cover to grade ✓
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system -2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking Z. •
30. Buoyancy calculations for tank/pump chamber .""
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic,groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater i is Ma
Plan reviewed by: (-�GI O Z 6/03/03