Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In ,---Out_ Acreage ) n ? Commercial: Residential: ✓ Street: 8-0 ,.L,1;c R..c' Village: w y. Floor Plan: ✓ # Bedrooms: Owner: id Lq ca,,r c1v 5.e r,i / 1.4, Installer: (2, 6, 0 Address: ca_t, av c j Phone: S b Sc- `/7 7- as--7 7 Phone: Builder: Engineer: Z'A S LA"'✓4 jZL" Address: Phone: 5 Zj' - jD�, 36 c v Phone: N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table L/ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: v 5. Water line 10 ft from septic components Var.: ;, 6. Benchmark indicated and shown-NGVD if near wetlands V 7. Septic tank minimum 10 ft from foundation,deck Var.: ✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V 9. Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11. Tank/leaching minimum 10 ft from property line Var.: ,/ 12. System meets all other setback requirements Var.: _ 7 13.Uses adjustment for maximum high groundwater Var.: .✓ 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: / 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable V 17. System meets slope requirements-min. 1/8", 'A"preferred V 18. System meets breakout requirements PVC liner: Wall: X ✓ 19. Specified tee sizes are proper,gas baffle on outlet tee ,/ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use i 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature / 33. H-20 loading is subject to vehicular traffic,groundwater 34. Title V Application and permit fee, installer si•nature 35. Foundation footing min. 2 feet above a 'usted ground water for new house 36. Deed Restriction required max. #bedrooms:nq max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 1 _Doi- 1 - 6/03/03