Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot r'K 7/r:a;� Zone of Contribution: In Lout Acreage Commercial: Residential: . Street: l co- go A (P' ) �f Village: nR Floor Plan: -c�� # Bedrooms: `' Owner: 1 a Vein prA jjc,/1/ -ft.)/ Installer: I/��0 irt,.Q; 4 Address: , m611A Phone: _ e/3 u- 2I 63 Phone: S-z2 Builder: Engineer: 437m j;7C" 4 �' h d Address: Phone: 4/v. 0)3 6 C Phone: N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 1/- 3. 4-5 ft of naturally occurring pervious material,above water table V 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5. Water line 10 ft from septic components Var.: v` 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: :r 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred ;/ 18. System meets breakout requirements PVC liner: Wall: � 19. Specified tee sizes are proper,gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use r/ 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25.Inspection port on plastic chambers/leach field v 26.Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size I 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: v 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 1/ 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwa sor's Map Plan reviewed by: ( 7 J d i 6/03/03