HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot r'K 7/r:a;� Zone of Contribution: In Lout Acreage
Commercial: Residential: .
Street: l co- go A (P' ) �f
Village: nR Floor Plan: -c�� # Bedrooms: `'
Owner: 1 a Vein prA jjc,/1/ -ft.)/ Installer: I/��0 irt,.Q; 4 Address: , m611A Phone: _ e/3 u- 2I 63
Phone: S-z2
Builder: Engineer: 437m j;7C" 4 �' h d
Address: Phone: 4/v. 0)3 6 C
Phone:
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
1/-
3. 4-5 ft of naturally occurring pervious material,above water table V
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: V
5. Water line 10 ft from septic components Var.: v`
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: :r
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred ;/
18. System meets breakout requirements PVC liner: Wall: �
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use r/
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade,pump chamber cover to grade ✓
25.Inspection port on plastic chambers/leach field v
26.Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size I
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: v
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature 1/
35. Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwa sor's Map
Plan reviewed by: ( 7 J d i 6/03/03