Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH ; Zf X/7 SEWAGE PLAN REVIEW CHECKLIST Location: AM -2C LOTZ7d Date of Subdivision Approval Street /' .t,die,% Zone of Contribution: In Out Village Q/,-/i1w Commercial Residential Owner: I fl�S Lh Installer 7;1-/4 Builder: .2 Engineer A7 //,ieu- . N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) (....---'- 4. Foundation 2 feet above high point of fronting road for new construction. /- 5. Water availability letter from Water Department for new construction. L..------ 6. Benchmark indicated and shown - NGVD if near wetlands. �/' 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. L/ 9. Leaching a minimum of 20 feet from house and 10 feet from deck, 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. t./ 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. L-- 15. System not in top or subsoil or 5 foot removal. _ 16. Proposed contours are suitable. %' - 17. System meets slope requirements - min. 1/8", 1/4" preferred. i/ , 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. t,>----- 19. Specified tee sizes are proper, gas baffle on outlet tee. ,., :_ 20. Sewage flow under 10,000 gpd for parcel. ;` ?1. No garbage disposal. ;✓ 22. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. c/ 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a, clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature, 31. H2O loading when system subject to vehicular traffic. c/ 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. v 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading., 35. Subdivided prior io April 7, 1989 - Phosphorus Zone 300'. ' Plan reviewed by: CW 1 M