HomeMy WebLinkAbout33 Summer St - rebar pe letter 11924 Brig 2„IN Entziriceritill, & Testinf2
. , RECEIVED
i nf,,,,„..,,, PA f 1171S tx(
BUILDING DEPARTME-NT
--,-
I JAN 1 9 2024
L_
By
W.D. Price Inc. January 19,2024
161 Main St.
Yarmouth Port, MA 02675
Attn: Wesley D. Price
PROJECT: 33 SUMMER ST., YARMOUTHPORT
RE: Structural Investigation of New Addition Footings& Walls
As per your request,on 1/18/24 Briggs Engineering&Testing reported to the above noted
project, to conduct a scan of the Footing and Walls of the new addition.The purpose of this scan
is to locate and confirm the presence of reinforcing steel installed within the concrete walls
and footing for conformance to the project drawing requirements.
OBSERVATIONS,DATA AND COMMENTS
I) The concrete scanning was conducted using our Humbolt Micro Cover Meter.
This instrument is designed to detect steel elements within concrete substrates
and establish the depth/coverage of the detected reinforcing steel.
2) After completing our scans of accessible footing and wall surfaces and locating
Reinforcing Bars.The installed reinforcing bars are as shown on Drawing A7,
Details 4,6& 7 and on foundation note#1 and thus appear to be in conformance to those
drawings and details.
Please see the attached A7 Drawing for details and locations investigated.
If you have any questions or comments,please contact me at our office.
Sincerely,
, .
Kevin M. Curran,Director Structural Division
vk vk.brige,se n gi ti et'ri n g.coiti _
100\\C\mouth Slice( - Unit C-2 100 Pound Road
Roddimit MA 02370 Curiihtilaild. RI 028(14
Phone (781) $7 I-6100 . Fax (781) 871-4340 Phone (4(11 h48-2.990 . Fa\ (401)658-107 7