HomeMy WebLinkAbout24-A020 16 Church StreetRELIEVED TOWN OF YARMOUTH
FEB 2�24 1146 ROUTE 28, SOUTH YARMOUTH. MA 02664-4451
Telephone (508) 3W2231 Ext. 1292—Fax (508) 398-0836
of x Ohl iu'OLD _ING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
APPLICATION FOR
CERTIFICATE OF APPROPRIATENESS
Application is hereby made for issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts of 1973 as
amended, for proposed work as described below & on plans, drawings, photographs, & other supplemental info accompanying this
application PLEASE SUBMIT 4 COPIGS OF SPEC SHEET(S), ELEVATIONS, PHOTOS, & SUPPLEMENTAL. INFORMATION.
Check All Categories That Apply: Indicate type of Building: _... Commercial X Residential
1) Exterior Building Construction: New Building Addition _Alterations Reroof Garage
Shed Solar Panels X Other:
2) Exterior Painting' Siding Shutters Doors Trim Other:
3) Signs/Billboards: New Sign Change to Existing Sign
4) Miscellaneous Structures: Fence Wall Flagpole Pool Other:
Please type or print legibly:
Address of proposed work, 16 Church St, Yarmouth Port, MA 02675 _ MaplLot # 7
Owner(s): Peter Barnes Phone A (248) 310-0213
All applications must be submitted by owner or accompanied by letter from owner approving submittal of application.
Mailing address: 16 Church St, Yarmouth Port, MA 02675 Year built: 1940
Email: peter@brayfarmllc.com
Agenticontractor Tristan Souza of Venture Home Solar
Preferred notification method: Phone X Email
Mailing Address: 231 Weaver St Unit E Fall River, MA 02720
Phone #: 508-808-3704
Email permittingma@venturesolar.com Preferred notification method:
Description of Proposed Work:
qo -,%IN pWVcls av) 51 a=0- 2Mn rYir.I�Yao s
Signed (Owner or agent)
7�
Phone X Email
Date: 2/2/2024
Ownerlconlractorlagent is aware that a permit is required from the Building Department (Check other departments, also.)
> If application is approved, approval Is subject to a 1U-day appeal period required by the Act.
This certificate is good for one year from approval date or upon date of expiration of Building Permit, whichever date shall be later
➢ All new construction will be subject to Inspection by OKH OKH-approved plans MUST be available on -site for framing 8 final inspections
Rcvd Date: �"►
Amount 11--
CasIVCK #: fD
Rcvd by: 4�)�
45 Days:
Date Signed:
Approved Approved with Modifications Denied
Reason for Denial.
Signed.
'- Aoa0
APPLICATION #:
TOWN OF YARMOUTH
1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-4451
Telephone (508) 398-2231 Ext. 1292 Fax (508) 398-0836
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
45-DAY TIMEFRAME
WAIVER
Application #: q, Av;�a
Project Address: 16 Church St, Yarmouth Port, MA 02675
Application Received Date:
45 Day Decision Deadline: 2✓'! �,_
Me, the undersigned owner, contractor, or agent, do hereby waive the
45-day timeframe for a determination on our application for a Certificate
of Appropriateness/Demolition/Exemption by the Old King's Highway
Historic District Committee for the following project:
C S a✓192,Y,4b &I 516+ Kew-
Date: 2/2/2024
ECFIVED
FEB 0 8 2024
I M1l1YlVV I r,
Signed:
Owner
Owner
Contractor/AgepW
e2q --/vb
GENERAL SPECIFICATION SHEET
Project Address: 16 Church St, Yarmouth Port, MA 02675
FOUNDATION: Material: Exposure (Not to exceed 18"):
CHIMNEY: Material/Color: GUTTERS: Material/Color:
ROOF: Material: Asphalt Pitch (7/12 min) 9112 Height to Ridge: Color: Tan
SIDING: Material/Style: Front: Sides/Rear: COLOR CHIPS
Color: Front: Sides/Rear:
TRIM: All windows & doors to be trimmed with: 1x 4 1x5 (Circle one.)
Material: Color:
DOORS: Qty: Material: Color:
Style/Size (if not listed/shown on elevations):
STORM DOORS: Qty: Material:
GARAGE DOORS: Qty: MatT Style:
WINDOWS: lslde:: Front: Left:
Manufacturer/Series:
Grilles (Required): Pattern (616, 2/1, etc.) _
Snap -In: Between Glass:
Color:
Color:
Right: Rear: Color:
Material:
_ Grille Type: True Divided Lite:
Permanently Applied: Exterior Interior
STORM WINDOWS: Qty: Material:
Color:
SHUTTERS: Mad: Style: Paneled Louvered Color:
SKYLIGHTS: Qty: Fixed Vented Size Color:
FEB 0 8 2024
0ANIVIOU I r,
OLD KING'S HIGHWAY
DECK: Size: Decking MatT Color:
Railing MatT Style: Color:
WALLSIFENCES* (Max S' height): Height: MatT
Style: Color:
(Show running footage & location on plot plan.) *Finished side of fence must face out from fenced in area.
UTILITY METERSIHVAC UNITS: Location:
LIGHTS: Qty: Style:
Location(s):
Screening:
Color:
LIGHT POSTS: Qty: Material: Color:
Location(s): 16 Church St, Yarmouth Port, MA 02675
Additional information:
Install 17.00 kw Hanwha 425 solar panels on roof. 40 total panels. No battery. No structural.
Panels may be partially visible but will not significantly impact public way.
2-General
APPLICATION #:
TOWN OF YARMOUTH
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
ABUTTERS' LIST
Applicant's (Owner) Name: Peter Barnes
Property Address/Location: 16 Church St, Yarmouth Port, MA 02675
Hearing Date:
Notices must be sent to the applicant and abutters (including owners of land on any
public or private street or way) whose property directly abuts or is across the street from
the applicant. The OKH Office will send out notices using the addresses as they appear
on the most recent applicable tax list.
Note: Instructions for obtaining the abutters Map and Lot numbers can be found on the Old King's
Highway Department page on the Town website: www.varmouth.ma.us
Map Number Lot Number
Applicant Information
Abutter Information:
RECRVED
FEB 0 8 2024
r HHIVIUO l r,
MIS
153C,1
i92t
-73 15360
-7 D 53 (0
-71 15 3
(aL 5151
Application* 941 AD X
1221 73► r 1
ROBINSON DOUGLAS C
ROBINSON MARY C
4 CHURCH ST,
YARMOUTH PORT, MA 02675
1221 721 r 1
LEVINE HAROLD
C/O BARNES PETER A
16 CHURCH ST
YARMOUTH PORT, MA 02675
1221 711 1 1
MELLOR MARCIA
24 CHURCH ST
YARMOUTH PORT, MA 02675-1101
1221 701 1 1
MELLOR MARCIA
24 CHURCH ST
YARMOUTH PORT, MA 02675-1101
1221 661 1 1
GRADER ABRAHAM S
GRADER MICHAL H
17 CHURCH ST,
YARMOUTH PORT, MA 02675
Please use this signature to certify this list of properties
directly abutting and across the street from the parcel located at:
16 Church St., Yarmouth Port, MA 02675
Assessors Map 122, Lqt 72
Andy LWchado, Director of Assessing
February 23, 2024
RECEIVED
FEB 2 3 2024
�Amvi V V ! n
v (. J1 r1�r
�
O
-t
,7o_A6>0
u�
n
a
fV �
'� •e
Y
�
v
y
se
f
r
f•
RF -VI o
r r} g 2024
I
�Hf-1IVlUillh
_ �D JNG' H1 HWAY
2
d
N
N
d
CV
a
Mo
3
H �k
g ETT yx, i'
€3 }�
N 05
°' t,
a •�
°' Noun 4
oj
ga
°C)
{.� X
u
3 0
= St
0
Gh'�� ,
'h
w
,
❑
0
0
9
RECFIVFt-.,
FEB G 8 2024
(Ahiviuu i r,
i
.1
W
FtOV%t of Huse
3
Y
EIT
1 *4C\
0
NaM09
94-Ab;to
g
7 aC
c
fA
'C m
a
3
FF
U
8
E FI VE D
`P 0 8 2024
fAmivjuV I fi
4SETT c.
NW1P1
E-
�c
qq'A;�o
S
v�
z
P
Q
0
J
z
0
a
0
N
Q1
0
0
v
N
C
a _
a E
E
3 �
Ln
� a c
u N �
N �
Ln
L
U N
m
@ o �-
a
� u
O o
�
m
w c a o
z
N
°1
nj
o E -
F rn E c
m
w w
E
Q- 0
E
Q r
M
d c „ ul
N
mr
E
Ea
d
.E
� mE
co^
Ev E
v
^M c�i
a
N,n
0 x �O
coE
V
c o
c°n
D t= �p a
y
00 M p E
70
00
r: n
o-'
n .�
- o cn E
m
,o s.
v o V
rn
,o � 'n a
N
0
v° ° g
� U m
c
o W 0 0 0
LL 3LL cooLL U� uv
Rl
OLD KlNG'S HI
li{1riEi
- �
.! i•
,�'�
'} ] �
�, i,E :i
L� i IH���
:fi
'$il
fi ,
r
'=:I �iit
�IN
fiEl.=f.,
11
j
j
fit
«A
i
WAY
J _ 1
z Y W� W1 W 1
ZZ w
�_,�
§10_INV
A I
f�
Sd<?Y
a
L
RA
m
0a
SETT _
` o glut
g ��1TR09 `
RF— 09VIED
8 2024
...I- )loin r)
O •W
0
LL
�WM"15
it
�Fzmb
.1 xa � a
C=RH 9 fli t oZO�i mMSE-20'
RWN T-1EIr HI
or�
r-
�
g
$
t
c
0= ..
r
Alf
Nofi10�
RECEIMD
FEB 4 R 2924
MI
LO
ul
N�rno�
N
N
OM
M
N
N
N
`u
V
A
7
C
E
0
Z
eo
G
= N
U
3
V S
r EB 0 � 2024
AP'
?4-ACPD
s
44
w
f�4
f�4
r4
F4
r4
t
E
3
G
3 �940IZ- ao5;F
N
L
C
a
NM�
NM�
z
a
�
I
I
.A
tI
e
C
lip
E
.,, �
4
Q
QJ
O �
N Z
4
wa
zm
0 0
0 ,n
Q{;
I Z
� Lf)
OR
Z Li1
DECEIVE
FEB Q S 2024
YAAlvfUU'I r,
OLD KING'S HIGHWAY
z �
J
m f •��de
F
yU
u
08C j � J — a
J�Z f
z 5�
mta
L yy8
—
Z L
,9L4,Al—)
E-CEIE
FEB () 8 2024
'f Aty,vriUu i n
m
m
O O - N - - O O O O O O O o S d 0 0
0
a
a4 04 m oc [G1 f1 [G]
a m Y V Y a m Y Yg mY V 9 � _U _U
,�
(O
a
J
ti A m R P O 71 p
mQpa �aa�g v_ma
o
w
o 8
q{Gs�
3
L
a u a $ w
Z
w
z
w C
C c W ww�
W w
W
U
fCa-
G
C
LL
O
w
W
a
is
n
m
>_.
W
m 7 m N N R
IL
oD N 1D O Y V N Z
LL
O
O O O O O O O O O O O O
CD
LL
g
Op
a
C
a
V
t
n.
•
in c c LL "' oo
c CC m Q O C Ja
w en �e g
q c a a v m
2
v
99
4
N
t&~ p c c c
QQ
m p V Q
N o m x Z
A V x
t
Q u a L
... V} a_
u
V
T
m
c
= E v
c m
L°
w
w
a#
w
E Z j m tl1CD
2 ur N io
N m
P
a° g
y U
p
G
m
G
G
U
o
v
m
4!
t!
1!
m
$
U.
LL
s
3
�
I u
A0 ,140?-D
9EMOVED
FER 0 8 2024
rr 1� It1r,
.� �.....�ir a rir•__.Gll
m
v
44
_ �.�, 96.
L
m $
o ;
to a�IAg a
00
`'
°I
k � � � � �■
. L `
. �� •� �
e
� a CL\
AP
scrr f
� I
l i 0 8
t
RO ,
O -4
F.
FEB 0 8 2024
r F11 SrJltlU I r4
1 OLD KINGSV
To
d "1 Ai
ii
VL1
:I V �
Ij
PET
:.
FEB 8 2024
'rARVIOUT h
OLD KINGS HIGHWAY
2
0
m
F
I
foh
pF
op
Nil
Al
Fi
' V. - - '!i-il• of * ,
1 '• r 1 �T f�� 5i f .� rs\ ;S,"' ? pia`••," .eY'i,' I e �~ ��tF'}:l,;Hy. 4
4} 4,ti � • i" .�# n � 'fir. ri � . �nK .
1. V* I rll�'
it
� v � 1'4 s ��.�� '. fir+ �•,. +1 1,�
3: a%' �.� ?� fix• �` 3'F4{ }' ` - �k * } ,
'I
fs 1 -i
AI
w
.A.
4
# � rt '/`'. ��� r.`�, �: {�* T l�C•/ 1*al �'*fV• � •. r ,fir �y .w� ya
Ak
�,.. wd Af T. • ? fir;r. ' '! °I' +] .' -
k.
or
1 b e y r� r S !•i
ref. L �`•}"''T `t .III+F�+�� •yi�rs:
JS
IW
01,
IX
AA
or
JL
At
�� isr 'rNF �,�� x ` r � � •r 'j � � ,y' i. � �lJ f•' � * #
14
;� t . _ � ".. �✓w Ia' - ., , `', file ► • 1f �q ,
DocuSign Envelope ID. 87072771-72294F22-AE4D-486D8AA20AF
Dmusqn.d by.
Aurora Shade Recr#,,,A0DD,A,.24..t, V baMA S
Customer
Peter Barnes
Address
16 ChurCh 5t YarrnoUln
Port
MA 02675
Annual irradiance
FINAL DESIGN
Designer
Vpul Pradhan
Coordinates
(41 707052, -70 2426381
DEB I'D 8 2r'4
`e� E-I11 E 0
Organization I FEB 0 8 2024
venture Solar LLC
(At iivi�)u f t-,
Date OLD KINGS HIGHWAY
kWhlm2/Year
2,450 or more
2,100
1,750
1.400
1.050
700
350
0
-� 2 .January 2024
Summary
A►ray
Panty Carmt
Azirnwh (dog.)
Pitch (d".)
Annual TOF (`k)
Annual Solar Accra (%)
Amual TSRF (4 }
1
18
72
37
70
85
60
12
252
37
85
82
70
3
5
162
37
99
69
69
1
5
72
23
76
81
61
WerpMad average by
panel count
-
-
-
81.7
64
Peter Barnes
ENPHASE
DATA SHEET
IQ8M and IQ8A Microinverters
Our newest I08 Microinverters are the industry's first microgrid-forming, software -
defined microinverters with split -phase power conversion capability to convert DC
power to AC power efficiently. The brain of the semiconductor -based microinverter
is our proprietary application -specific integrated circuit (ASIC) which enables the
micro'nverter to operate in grid -tied or off -grid modes. This chip is built in advanced
55nm technology with high speed digital logic and has super -fast response times
to changing loads and grid events, alleviating constraints on battery sizing for home
energy systems.
Part of the Enphase Energy System, IQ8 Series
Microinverters integrate with the Enphase IQ
Battery, Enphase IQ Gateway, and the Enphase
App monitoring and analysis software.
Connect PV modules quickly and easily to
IQ8 Series Microinverters using the included
O-DCC-2 adapter cable with plug-n-play MC4
connectors_
IQ8 Series Microinverters redefine reliability
standards with more than one million
cumulative hours of power -on testing,
enabling an Industry -leading limited warranty
of up to 25 years.
IQ8 Series Microinverters are UL Listed as
PV Rapid Shut Down Equipment and conform
with various regulations, when installed
according to manufacturer's instructions.
® 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, I08 Microinverters,
and other names are trademarks of Enphase Energy, Inc. Data subject to change.
IQ8MA-DS-0003-01- EN-US-2022-03-17
FEB 0 8 2024
YARMOU-I i-.
Easy to install
• Lightweight and compact with
plug-n-play connectors
• Power Line Communication
(PLC) between components
• Faster installation with simple
two -wire cabling
High productivity and reliability
• Produce power even when the
grid is down'
• More than one million cumulative
hours of testing
• Class II double -insulated
enclosure
• Optimized for the latest high-
powered PV modules
Microgrid-forming
• Complies with the latest
advanced grid support"
• Remote automatic updates for
the latest grid requirements
• Configurable to support a wide
range of grid profiles
• Meets CA Rule 21(UL 1741-SA)
requirements
• Only when installed with IQ System Controller 2,
meets UL 1741.
•' 108M and IQSA supports split phase.
240V installations only.
IQ8M and IQ8A Microinverters
INPUT DATA r
,:
Commonly used module pairings'
W
260 - 460
295 - 500
Module compatibility
60-oelf/120 half -cell, 66-cell/132 half -cell and 72-cell/144 half -call
MPPT voltage range
V
33 - 45
36 - 45
Operating range
V
25 - 58
Min/max start voltage
V
30 / 58
Max input DC voltage
V
60
Max DC current2 [module Isc)
A
15
Overvoftage class DC port
it
DC port backfeed current
mA
O
PV array configuration
OUTPUT i
1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit
Peak output power
VA
330
386
Max continuous output power
VA
325
349
Nominal (L-L) voltage/range'
V
240 / 211- 264
Max continuous output current
A
1.35
1.45
Nominal frequency
Hz
60
Extended frequency range
Hz
50 - 68
AC short circuit fault current over
�I1^. "HS. #yR�+
Fr!_
j Y� 1 r_L
2
,
3 cycles
Arms
Max units per 20 A (L-L) branch clrcult4
Total harmonic distortion
<596
Overvoltageclass AC port
III
' OLD KING 5 1 iI6.'.`0'vAY
AC port backfeed current
MA
30
Power factor setting
1.0
Grid -tied power factor (adjustable)
0.85leading - 0.85 lagging
Peak efficiency
%
97.6
97.6
CEC weighted efficiency
%
97
97.5
Night-time power consumption
mW
60
Ambient temperature range -400C to +60°C (-40°F to+140°F)
Relative humidity range 4%to 100%(condensing)
DC Connector type MC4
Dimensions (WxWxD) 212 mm MY) x 175 mm (6.9") x 30.2 mm (1.2")
Weight 1.08 kg (2.38 Ibs)
Cooling Natural convection - no fans
Approved for wet locations yes
Pollution degree PD3
Enclosure Class II double -Insulated, corrosion resistant polymeric enclosure
Environ. category / UV exposure rating NEMA Type 6 / outdoor
CA Rule 21(UL 1741-SA), UL 52109 1, UL1741AEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01
Certifications This product Is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014. NEC 2017, and NEC 2020 section
69012 and C22.1-2016 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when Installed according to
manufacturer's Instructions.
(1) No enforced DC/AC ratio. See the compatibility calculator at https://Ilnk.enphase.com/module-compatibility
(2) Maximum continuous Input DC current is 10.6A (3) Nominal voltage range can be extended beyond nominal if required by
the utility. (4) Limits may vary. Refer to local requirements to define the number of microinverters per branch In your area. 108MA-DS-0003-01-EN-US-2022-03-17
;X4_10;V
01/25/2024
Peter Barnes
16 Church Street
Yarmouth Port, Massachusetts 02675
Re: Solar Panel Installation
Dear Mr./Ms. Barnes,
At your request, Patrick Bussett of Venture Solar LLC (MA license #56934), has carefully reviewed the existing roof
framing and the proposed connection of the solar panels to the roof for the building referenced above.
The following building codes were used in conjunction with the 9th Edition of the Massachusetts State Building
Code — 780 CMR to generate pertinent design criteria:
ASCE 7-10 — Minimum Design Loads for Buildings and Other Structures
International Building Code 2015 Edition (IBC)
National Design Specification for Wood Construction 2015 Edition (NDS)
Design Criteria: Design Gravity Load: Snow/Live Load = 30 Ibs/ftz, Dead Load = 12 psf
Design Wind Load: Vuh = 140 mph; Exposure B, Risk Category II
"Wind loads exceed seismic loads and therefore govern the design
Field observations identified the following conditions:
The new solar panels will impose an additional dead load of approximately 3 psf. Roofs A, B & C consists of asphalt
shingles over plywood sheathing supported by 240 rafters at 16" o.c. The rafters are sloped at a 36' pitch and
have a maximum projected horizontal span of 17'-0"±. Roof D consists of asphalt shingles over plywood sheathing
supported by 2x6 rafters at 24" o.c. The rafters are sloped at a 38' pitch and have a maximum projected horizontal
span of 16'-0"± with an intermediate knee wall support. The framing is assumed to be Douglas -Fir #2 graded or
better.
The calculations determined that the existing framing has adequate capacity to support the PV panels as shown in
our PV panel layout plan with no structural upgrades required. I therefore certify that this installation complies
with the applicable codes and is acceptable for approval. Please feel free to contact me if you have any questions
or concerns.
Best,
I oo_
Patrick Bussett, PE
Email: patrick.bussett@venturesolar.com
FFB -9 8 2924
/ -`,)h?v
0
�i
L
W
IMP
H
IA
7
C
N
r�
W
V
D
cl
0
�c
a
J
J
3
CL
�J
0
0
s
0
c-
ro
V)
(1)
S
v
L
FD
u
m
w
a
a
w
a?
FEB 0 8 2024
Hrtiwuu I r-t
i
94_A);O
laws
LA
0
s
0
0
IM N
0
u
Ln
0
0
= a�
- L I
u
CD
� 0 i
DocuSign Envelope ID; 87072771-7229-4F22-AE4D-4486D8AA20AF
_4ont re solar
Letter of Authorization / Property Owner Authorization Form
I, Peter Barnes,
am the owner of the property located at address:
16 Church St, Yarmouth Port, Massachusetts 02675
hereby authorize Venture Home Solar, LLC dba Venture Solar Power of Attorney to
handle dealings associated with the successful interconnection and application for
obtaining local building and other permits from the Authority Having jurisdiction as
required for a Solar Photovoltaic System located on my Property. I further authorize you
to release my account information for the prior twelve (12) months, including electrical
usage and demand history. Venture Solar agrees to keep this information confidential and
use it only for the purposes of designing, installing, and interconnecting my photovoltaic
system, obtaining incentives on my behalf, and establishing interconnection agreements,
proper metering, and approvals.
Print Name: Peter Barnes
UocuSigned by: i
Owner Signature: 1pthr b"W's
Ct Enono,A6e64z4.
Date: 1/19/2024
Print Name: Peter Barnes
OocuSigned by
Utility Bill Owner Signature: Fpdv t ouAls
:'vA-0D1A6B6424
Date: 1/19/2024
1=EB e S 2024
DocuSlgn Envelope ID: 87072771-7229-4F22-AE4D-4486D8AA20AF
Fenture solar
Venture Solar Damage Liability Addendum for PV Installations
Customer: Peter Barnes
Installation Address: 16 Church St, Yarmouth Port, Massachusetts 02675
Venture is liable to pay for damage to your real property caused by our
negligence during your installation. We shall not be liable for damage to the
system's installation area due to old, deteriorated, or improperly installed roofing,
sub -roofing, roof coverings, supports, siding, exterior paint or covering, or other
non -visible installations.
In the event that you suspect there may be damage to your property caused by our
installation please contact us immediately at 347-305-7999 or email
supportftventuresolar.c om to schedule an on site inspection of the damage.
Venture may elect to hire a sub -contractor to repair the damage.
After we conduct our inspection of the alleged damage, we will contact you with a
plan to correct the damage.
If you elect to use a contractor other than Venture to repair the damage without
written consent from Venture, we reserve the right to not reimburse you for the
damages.
Our total liability shall be limited to the amounts due payable to Venture under
your agreement.
Except as set forth in this addendum, you agree there are no oral or written
representations or inducements, expressed or implied, any way conditioning this
addendum, and we expressly disclaim their existence. By signing this addendum,
you acknowledge that you have read and understand this agreement or have had a
competent legal representative explain its terms, and hereby accept this addendum
in its entirety. You further acknowledge receiving a complete copy of this
agreement.
Loocu8lpnedhy: CEIE 1/19/2024
P
CIERODDIABB8424 FEB' 0 8 2024
Signature
Date
9 LK/jUJa
support@venturesolar.com 347.305.7999
DocuSign Envelope ID: 87072771-7229-4F22-AE4D-4486D8AA20AF
ik, re solar
Venture Solar System Removal Addendum for Residential PV Installations
Customer: Peter Barnes
Installation Address: 16 Church St, Yarmouth Port, Massachusetts 02675
If you elect to have your solar energy system removed and re -installed in the future
there will be a charge of $325 per panel to remove, store, and re -install the PV
system. If you elect to have the system removed, but not re -installed there will be a
charge of $220 per panel. This pricing is valid for 120 months from the date of
signature.
Venture guarantees the penetrations related to the solar PV system and the area 6"
around them for 10-years, but takes no responsibility for the roof or it's integrity
otherwise.
Except as set forth in this addendum, you agree there are no oral or written
representations or inducements, expressed or implied, any way conditioning this
addendum, and we expressly disclaim their existence. By signing this addendum,
you acknowledge that you have read and understand this agreement or have had a
competent legal representative explain its terms, and hereby accept this addendum
in its entirety. You further acknowledge receiving a complete copy of this
agreement.
IPOocuSlpnad by:
��'t.v' 15"VO-S
CI EAODWABBU24
Signature
1/19/2024
Date
In the event that you suspect there may be an issue with your roof, please contact
us immediately at 800-203-4158 or email support@venturesolar.com to schedule
an on site inspection.
s
F[-B 0 8 2024
, V ,'JIi-
- ,
support@venturesolar.corn
347.305.7999
DocuSign Envelope ID: 87072771-7229-4F22-AE4D-4486D8AA20AF
ven 1 1 +re solar
Venture Solar Customer Agreement Addendum for Electrical Work
Name: Peter Barnes
Address: 16 Church St, Yarmouth Port, Massachusetts 02675
This electrical addendum ('Addendum") is in connection to and made a part of the Solar Electric
Installations Agreement ("Agreement") between Venture Horne Solar LLC {"Venture") and Peter Barnes ('Owner') to
take place at 16 Church St, Yarmouth Port, Massachusetts 02675 ('Site'}. Venture and Owner may individually be
referenced herein as a'Party' or collectively as the 'Parties'. The Parties agree as follows:
1. In addition to the electrical work stated in the Agreement, Venture shall complete additional electrical work as
follows: TF
Tap Box p
2. Venture offers a 10-year workmanship warranty. Q 8 44
3. The total cost of the electrical work is $1,135.00
4. Venture will remove all debris and garbage from the site. -OLD (1�If1JVIU0 i i
hCl�[G.S f�ilCtiyW��
S. Venture will make its best efforts to complete the work within 24 to 48 hours of the scheduled date but is not
liable for any delays due to permitting, policy change, weather, or force majeure events. While performing the
Additional Work, Venture may discover certain undisclosed or unidentified Issues. Any costs related to those items
are specifically excluded from this proposal. Owner and Venture shall execute a change order addressing those
items.
6. Owner to supply all electricity at the Site and represents that the existing electrical system at the Site is in full
compliance with the current National Electrical Code.
7. Venture shall furnish all tools, equipment, supplies, superintendence, transportation, and other construction
accessories, services and facilities necessary for Venture to perform the Additional Work. Venture shall furnish all
material, supplies and equipment specified to be incorporated into and form a permanent part of the Additional
Work. Venture will provide and perform all necessary labor in connection with the Additional Work in a
professional and skillful manner.
8. If the project is not substantially complete within 180 days of the execution of this document, the Owner may
cancel with no penalty.
g. Customer Payment of $0 due on the day the Additional Work begins.
10. In the event Venture determines that any of the Additional Work outlined in this Addendum is not necessary,
Venture may elect not to proceed with those portions of the Additional Work. Venture will inform the Owner of the
Additional Work that isn't going to be completed and reimburse Owner for any out of pockets costs incurred.
Venture Home Solar, LLC
-Dmuftmd by:
�ttt,lr jrJat VOIS
Owner LLLLL c,EA0oDIAOB8424
94, A%?V
DocuSi&n Envelope ID: 87072771-7229-4F22-AE4D-4486D8AA20AF
tur,- sear
Our Cancellation Policy, Explained
While we never like to see anyone go, we understand that things can
happen to change circumstances and we want to be as transparent and
clear as possible about the policy around cancellations.
The following form attached is the only acceptable method of cancellation
agree that if I cancel outside of the cancellation window associated on the next page that I will
be liable to pay the charges associated and I cannot refuse to pay. If I refuse to pay, Venture's
legal team will pursue legal action.
,DS
Initial P15
I agree that the only acceptable method of cancellation is to send the cancellation form to
canceirequest@venturesolar.com
DS
Initial rb
1 agree that I cannot cancel verbally with any team member under any circumstances. If
attempt to cancel verbally with any team member it will be considered null and void
Lp
S
Initial
I agree that if I am canceling based upon a competitor providing a lower price, I am willing to
allow Venture an opportunity to price match the previous offer. Venture has a price match
guarantee and will pay $500 toward another company if we cannot match the other quote
apples to apples.
DS
Initial
If you are outside of 7 days, I agree that I need to speak with a member of cancellations team in
order to process the cancellation
Initial PCti r yP�'p"`L:
LT
2n:4
r �lr .ri 1lil r
OLD KINGS HIGHWAY
DocuSign Envelope ID: 87072771-7229-4F22-AE4D-4486D8AA20AF
Fentu re solar
Venture Solar Customer Cancellation Addendum
This addendum is in relation to the solar photovoltaic installation agreement ('Agreement')
between Venture Home Solar, LLC ('Venture') and Peter Barnes ('Owner') to take place at 16 Church
St, Yarmouth Port, Massachusetts 02675 ('Site`). Venture and Owner may individually be referenced
herein as a 'Party' or collectively as the'Parties'.
TRANSACTION DATE:
YOU MAY CANCEL THIS TRANSACTION WITHOUT ANY PENALTY OR OBLIGATION, WITHIN SEVEN (7)
BUSINESS DAYS FROM THE ABOVE DATE.
TO CANCEL THIS TRANSACTION, FOLLOW THE INSTRUCTIONS IN THE SECTION BELOW.
The following cost schedule is enforceable if the Owner chooses to cancel their project:
Cancellation Timeline
• Within seven (7) days of signature
• Between eight (8) and thirty (30) days of signature
• Outside of thirty (30) days of signature
• Within two (2) days of scheduled installation
Fee;,-
n.
$1,275.00 �8 0 8 2024
$2,675.00
• ri1�IJ1tiJ�J i
$4,750.00 oz Kl G'S Hl ' k AY
Your signature below indicates your agreement to the timeline and fee schedule in the event you
choose to cancel your project post signature.
Docu ftnW br.
p!.iv 15AVVI)IS
Signature
1/19/2024
Date
In the event that you wish to cancel, please sign below and email a copy to
cancelrequest@venturesolar.com. The cancellation fee will be based on the date above and the date
that the copy is received via email.
I, Peter Barnes, wish to cancel my solar installation with Venture Home Solar, LLC and agree to pay
the fee associated based on the time passed from entering the installation agreement.
Signature
support@venturesolar.com
Date
347.305.7999
Ln
r-
kD
N
O
LU
N
V
Ln
LA
2
t
t=
LIWUM ...
s
L
C CU
cu
c
E
CD
Ch
rA
-I
Ln LU
m0 a
ai A
O v
A G1
c a
o �
p
4-J C
C
a,
E
CL_0
•
_B 0 S 2024
4 .�
V
r
(V C
ri it NJ ifs
4
N
V
L
0
4-J
v
c �
�
a�
0 0
0
V)
}' u
:S
L
a �
j
a
C
N N
W
mC to
4
�
a4
C •C
a �
uIIe
O
-0
L�
V
fo
L1
m
LO
v
N
L cr
i �
L
m
C O
'
L
L
4-
Qj
a
a1
�
r
m
94Jt&`"
DocuSign Envelope ID: 87072771-7229-4F22-AE4D-4486D$AA20AF
@ 0 HomeWorks
min
Energy
Venture Solar & HomeWorks Energy Partnership
Venture has partnered with a local Mass Save Energy Efficiency contractor to maximize savings
available to our customers who are choosing to switch to solar.
As a part of this partnership, you are eligible to have a free home energy audit that will include
no cost energy efficiency upgrades.
During the energy assessment we will determine which upgrades you are eligible for.
The assessment is a short, painless process that we can help you schedule online.
This is an option available to you at no cost, and is in no way required for your solar project.
Most of our customers find this to be a valuable service if they have not already had a home
energy assessment.
After your assessment, you will receive a report. You will be eligible for no cost air sealing, and
have options for weatherization measures with a nominal co -pay if you elect to have those
measures installed.
You can begin scheduling your home energy assessment here:
https://www.homeworksenergy.com/corporate/venture-solar
FEB 0 s 21124
Hruviuu i ri
1_0 KIN 'S HIGHWAY
O�p
DocuSign Envelope ID: 87072771-7229-4F22-AE4D-4486D8AA20AF
venture� solar
FEB �09 8 2024
Referral Program S IJ'
QI.D KING'S HIGHWAY
In our tier based system, you earn more for referring more people.
Starting with $500 per referral, you move up tiers to make up to
$1,000 per referral.
❑ Yes, enroll me ❑ 1 don't want to help my friends / family ❑ I don't have friends
Referral l:
Referral Z:
Referral 3:
Referral 4:
Referral 5:
..:IEAaDuiA686424
Bronze Tier:
1-3 referrals
$500 each
Silver Tier:
4-5 referrals
$750 each
Gold Tier:
6+ referrals
$1,000 each
DocuSign Envelope ID: 87072771-72294F22-AE4D-4486D8AA20AF
venture
Sotar
SCHEDULE E
Energy Usage and Billing Assumptions
Customer: Peter Barnes
Installation Address: 16 Church St, Yarmouth Port, Massachusetts 02675
FEB 0 s 2"
(A- wev, .
Our goal at Venture Solar is to provide the best customer experience possible by delivering the highest
quality installation and service. We also strive to set proper expectations about your solar energy
system's expected performance and its effect on your future energy usage.
Venture Solar uses the historical energy usage information made available by the customer to calculate
the annual energy kilowatt-hour (kWh) needs and to design the most efficient System possible to
reduce the energy needs from your utility provider within the bounds of any local rules and regulations.
There may be adjustments to the estimated energy needs based on input from the customer such as,
but not limited to, purchasing an electric vehicle, upgrading appliances, or a change to the number of
people living in the home.
Customer acknowledges that Venture determines historical and future energy needs to the best of its
ability based on the information provided but makes no promises or guarantees related to how much
energy the customer will use in the future. Estimated remaining energy needs from your utility provider
are an estimate based on the energy usage in kWh displayed on your proposal. If your energy usage
increases or decreases, it may affect the percentage of energy in kWh that is provided by your System
and resulting utility bills.
Customer acknowledges that utility rates fluctuate and will likely increase over time. If utility rates
increase, the resulting remaining energy in kWh that the customer needs beyond what the System
produces may cost more than originally presented in your proposal. For any avoidance of doubt, if the
cost of power with your utility company increased by $0.05 per kWh and you needed 1,000 kWh
annually beyond what your system energy system produced, you would pay approximately $50 more
per year than expected at the time your proposal was calculated assuming no other changes in your
utility billing structure or plan. Venture Solar includes an assumption of utility rate increases when we
calculate your lifetime savings.
Names) Peter Barnes
•.._ .C'1MDD1AGB5424
Signature
1/19/2024
Date
Sherman, Lisa
From: Mary Robinson <marycrobinson@yahoo.com>
Sent: Sunday, March 3, 2024 10:31 PM
To: Old Kings Highway
Subject: Solar Panels Yarmouth Port North of 6A
Attention!: This email originates outside of the organization. Do not open attachments or click links
unle:. you are sure this email is from a known sender and you know the content is safe. Call the
sender to verify if unsure. Otherwise delete this email.
Dear Historic Committee,
I was shocked to receive the request for variance to add 40 solar panels to a roof that abutts my property in the
historic district of Yarmouth Port!
My property will be impacted by the glare and this addition detracts from the historical quality of the
neighborhood. This addition will also set precedent for future modern additions and solar panels.
Recent research has shown that degrading solar panels leach lead and cadium into the atmosphere posing an
environmental debate.
As the committee that protects the historic architecture of this lovely area I hope you will decline this request.
Douglas and Mary Robinson
4 Church Street
Yarmouth Port
MAR a 2024
iH!twiUUIr
9L& 1 v "
Sherman, Lisa
From: Robinson <marycrobinson@yahoo.com>
Sent: Monday, March 4, 2024 8.00 AM
To: Old Kings Highway
Subject: Do Solar Panels Kill Birds? Uncovering the Surprising Truth - Anker US
Attention!: This email originates outside of the organization. Do not open attachments or click
links unless you are sure this email is from a known sender and you know the content is safe.
Call the sender to verify if unsure. Otherwise delete this email.
Dear Kings Highway Committee,
Here is a concerning article on the negative effects of solar panels on water fowl.
In addition to historical concerns the « sides » of the 16 Church Street property to be fitted
face 6A and are also visible from Church Street.
https://www.anker-com/blogs/solar/do-solar-panels-ki11-birds
Thank You
Mary Robinson
4 Church Street
Yarmouth Port
Sent from my Whone
MAR
OLD KING'S HIGHWAY
qt'�-At�?b
Do solar panels kill birds?
Do solar panels kill birds? Solar panels, both in residential and in solar power plants,
do not kill birds outright. However, it has been observed that some birds are somehow
attracted to the shininess of solar panels, which can resemble moving water when seen
from above. Aquatic bird species, in particular, may mistake the panels for bodies of
water and attempt to dive into the "water," resulting in injury or death.
Despite this issue, it's worth noting that solar panel -related bird deaths are often
exaggerated. In residential areas that are not close to large water bodies, this problem
is less likely to occur. Researchers are currently using Al technology to track and
monitor bird species that are prone to diving into solar panels, with the aim of
preventing such incidents. Importantly, even the National Audubon Society, a
nonprofit organization committed to bird and bird habitat conservation, supports solar
power, indicating that the benefits of this renewable energy source outweigh the
potential risks to birds.
How do solar panels kill birds?
Here we go again with the million -dollar question of "how do solar panels kill birds".
Let's dig in? Solar panels can potentially kill birds through a phenomenon known as
the "lake effect." Migrating waterfowl and shorebirds may perceive the reflective
surfaces of photovoltaic (PV) panels as bodies of water and collide with the structures
as they attempt to land on the panels. However, it is important to note that the effect
of solar panels on bird mortality rates is relatively low compared to other causes, such
as collisions with buildings, vehicles, and power lines or predation by domestic cats.
Utility -scale solar energy facilities, particularly concentrated solar power (CSP)
towers, can also pose a threat to birds. CSP towers use mirrors to concentrate sunlight
onto a central tower, generating intense heat. Birds attracted to the light beam or the
mirrors may be killed by the extreme heat generated by these facilities. However, the
overall impact of solar energy on bird populations is still considered to be much lower
than that of fossil fuel industrial facilities: -power plants, which can cause bird
mortality through collisions, electrocution, and poisoning.
What to do to prevent killing
birds when installing solar panels?
To prevent bird deaths when installing solar panels, consider the following steps:
1. Choose the Right Location for Your PV Solar Panels
Select a site that is not in a known bird migration path or near a nesting area. Avoid
installing solar panels near wetlands, rivers, or other bodies of water, as these are
often critical habitats for birds. Also, consider placing your solar panels on rooftops or
other existing structures to minimize the impact on the surrounding environment.
2. Avoid Using Reflective or Mirrored Panels
Reflective or mirrored solar panels can confuse birds, causing them to collide with the
panels. Instead, opt for solar panels with a matte or non -reflective surface, like
the Anker 625 Solar Panel, which has a lower risk of causing bird collisions.
$60
OFF
Anker SOLIX 10OW Foldable Solar Panel
$239.00$299.00
Code:
WSTDBDMPELCOPY
High Conversion Efficiency: The solar panel converts up to 23% of sunlight into solar
energy, charging your solar generators even on cloudy days. Smart Sunlight Alignment:
Equipped with Anker's proprietary Suncast technology, adjust the solar panel properly to
capture direct sunlight for maximum charge. Made for PowerHouse: Anker 625 Solar Panel
is compatible with PowerHouse 521, 535, and 757 (sold separately), making it an ideal all -
in -one power solution for road trips, camping trips, RVs, and more. The lightweight solar
panel features a USB-C and a USB-A output port to charge 2 devices at the same time.
Highly Durable: The solar panel is scratch and weather -resistant to last as long as your
adventures do. What You Get: Anker 625 Solar Panel (100W), solar charging cable, XT-60
To DC7909 connector, welcome guide, our 18-month warranty, and friendly customer
service.
Learn More
Buy Now
But wait, there's more! Boost your daily activities with the high -conversion efficiency
capability of the Anker 625 Solar Panel, converting up to 23% of sunlight into solar
electrical energy. Featuring our Suncast technology for smart sunlight alignment, it's
compatible with PowerHouse 521, 535, and 757 (sold separately). Ideal not only for
home use but also for road trips, camping, and RVs. The lightweight panel offers
USB-C and USB-A output ports for dual device charging. It's scratch and weather -
resistant, so you can ensure that it can withstand the test of time.
3. Install Anti -Perching Devices
Birds may perch on solar panels or the structures supporting them, increasing the risk
of collisions or entrapment. Installing anti -perching devices, such as bird spikes or
sloping covers, can help discourage birds from landing on your solar panels.
4. Maintain a Safe Distance Between Panels
2-Uq "
Leaving enough space between solar panels can help prevent birds from becoming
trapped between them. Ensure that the gaps between panels are either too small for
birds to enter or large enough for them to escape easily.
5. Use Bird -Safe Netting or Mesh
If you need to install solar panels close together, consider using bird -safe netting or
mesh to cover the gaps between them. This can help prevent birds from becoming
trapped while still allowing sunlight to reach the panels.
6. Install. Visual Deterrents
Visual deterrents, such as bird -scaring tape or predator decoys, can help discourage
birds from approaching your solar panels. Be sure to change the location of these
deterrents regularly to maintain their effectiveness and prevent solar panels killing
birds.
Conclusion
To wrap up, while solar panels have been associated with bird fatalities, the overall
impact is minimal compared to other human -induced threats. By taking responsible
steps in solar panel installation and maintenance, we can utilize the power of the sun
while preserving our avian friends' safety. Embracing solar energy as a sustainable,
clean power source is essential in the fight against climate change, and with continued
research and advancements in technology, we can strike the perfect balance between
harvesting renewable energy and protecting bird populations. So, let's soar towards a
brighter, greener future, hand in wing with our avian allies!
Here are some commonly asked queries about "Do solar panels kill birds".
Do solar panels attract birds?
Solar panels do not inherently attract birds, as they do not emit any signals or produce
food sources that would entice them. However, some birds may find the flat surfaces
of solar panels suitable for nesting or perching, especially if the panels are installed
near trees or other natural habitats.
Is the disposal of solar panels bad for the envi
ronment?
The disposal of solar panels can be harmful to the environment if not done correctly.
Solar panels contain materials like cadmium, lead, and some other heavy metals that
can be toxic if released into the environment. Proper recycling and disposal methods
are essential to minimize the environmental impact and ensure that valuable materials
are recovered and reused.
Can birds damage solar panels?
While it is relatively rare, birds can potentially cause damage to solar panels. They
may peck at the wiring or scratch the surface of the panels, which can result in
reduced efficiency or even malfunction. Additionally, bird droppings can accumulate
on the panels, reducing their ability to absorb sunlight and produce electricity. Regular
maintenance and cleaning can help prevent and mitigate any potential damage caused
by birds.
Featured Articles
I;Q,Ab?O