HomeMy WebLinkAboutCover letter for revised plan
WRS Engineering LLC
67 Stetson Street
Hyannis, MA 02601
508-776-0956 royokurowski@gmail.com
March 4, 2024
By hand delivery
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Paul and Nancy Cruz Notice of Intent for Enforcement Order Revised Information
Proposed Mitigation Plantings
52 Prince Road
Yarmouth, MA
Map 29 Parcel 88
Dear Commissioners,
Upon feedback from the Conservation Agent and Commissioners, our client hired a landscape designer to
incorporate a variety of native plantings in the area of the existing crushed stone hardscape around the perimeter
of the bulkhead. Please see attached site plan.
This proposal still includes the replanting with native buffer vegetation in excess of the requirements of the 2:1
stated in the enforcement. Including the removal of the crushed stone around the perimeter of the bulkhead.
After the owner’s consultation with the agent/commission, we enhanced/revised this proposal to include the
following:
- Permit all existing patio hardscape (Areas A&C = 631 SF) and rinsing station (Area B = 26 SF).
- Removal of existing crushed stone hardscape around perimeter of bulkhead (1,776 SF) + an additional 44
SF of stone in front of the outdoor shower
- Total required mitigation at 2:1 is 1,314 SF, this proposal incorporates 3,640 SF of mitigation which far
exceeds the requirements stated in the enforcement order. The mitigation consists of the removal of the
1,820 SF hardscape and the planting of loam, various plantings in accordance with the Planting plan
prepared by Gilly’s Landscaping included on the submitted site plan of 1,820 SF.
- Installation of 50 Gallon drywell for outdoor shower
- Addition of approximately 300+/- LF of post and rail fencing along the outer edge of the plantings along
the bulkhead
- Proposed kayak holder attached to bulkhead
- Repair of (2) two wooden staircases in kind that lead to the water
Please schedule this for your March 21, 2024 public hearing. If you have any questions or require additional
information, please give our office a call. Thank you.
Sincerely,
WRS Engineering LLC
Roy E. Okurowski P.E.
Enclosures: 8 Copies of WRS Engineering revised site plan dated 02-29-24 “Proposed Mitigation Plan” that
also incorporates Gilly’s Landscaping plan