HomeMy WebLinkAboutcover letter revised plan 2.29.24 RONALD J.CADILLAC,PLS Professional Land Surveyor 18 Brewster Road West Yarmouth,MA 02673 775-9700 February 29,2024 Mr.Edward Hoopes,Chair Yarmouth Conservation Commission 1146 Rt 28 S.Yarmouth,MA Re:Amending SE083-2252-Paul&Linda McCarthy,65 Winter St,Yarmouth Port.Now: 10230 Heritage Bay Blvd.#423,Naples,Florida 34120 Dear Commissioners: The enclosed plan has been revised for your approval,which includes: Removal of unpermitted walls and fill in the 35'to 50'buffer Reducing the pool to 9'-1"x 17'-6" A proposed 3'-10"retaining wall 50'-6"off wetland Planting Beds increase by 840 sf Removing stone from swale and planting native grasses We ask the commissioners to be aware that while the locus is a 1.27 acre lot, 15,000 sf of wetland is in the middle of the lot. As you may observe the lot is funnel shaped with much upland wooded and in the rear of the lot.In our particular case usable rear yard space is at a premium. This places a special burden on the McCarthy's. It is my understanding that the plantings proposed in beds B&C will grow into solid brush in a few years. Would the Commissioner's allow us to plant native grasses and native wildflowers in beds B&C? As you can see above we are providing 840 sf of plantings over required amount. Thank you. Sincerely, notes04.4._ Ronald J.C i ,PLS PROPOSED CONSTRUCTION SEQUENCE Property location: 65 Winter Street, Yarmouth Port, MA 02675 The homeowner, Paul J. McCarthy will be the general contractor and direct the subcontractors: A. The Wall Contractor—Removing walls and fill to original grade within the 50' buffer and building any Conservation Approved Walls. B. The Landscape Contractor—Responsible for installing Plantings proposed by Phil Cheney and approved by the Commission. C. The Pool Contractor—Installing the proposed pool per building permit. Upon approval from the Commissioners, the following work proposal will commence: 1) Before work starts, install straw waddle in front of the silt fence along the 35 ft boundary line and as shown on plan. Time required 1 week. 2) The surveyor will locate and mark the location of the original 2 ft wall along with the location of the 3'-10" ft wall. Time required 1 week. 3) This includes deconstruction of the walls between the 50 to 35 ft area and removing fill. This will require manpower and a walk behind Bobcat to remove the stones, cement block and fill that was previously installed. Some of the natural stone will be saved to use on the 2 ft wall. The remaining materials will be removed from the site. Time required 3 weeks. 4) After fill is removed down to original grade for the footings the surveyor will remark the 2 ft. and 3'-10' walls and construction will commence using stones and fat face engineered block. Time required 4 weeks. 5) Finish grading the 35 —50 ft zone as gradually as possible in preparation to installing the approved plantings. Time required 4 days. 6) Remove enough stone from the swale in order to maintain the shape and slope so that soil and grasses can be installed as per the drawings. Time required 10 days. 7) Install plantings in the 35 —50 ft zone and the swale, as per the attached schedule of plantings. Time required 2 weeks. 8) Pool contractor to install pool and mechanicals per building permit. Time required 2 weeks 9) Finish proposed work—Patios, plant grass, plantings outside 50 buffer, and proposed shower. After plantings are established call surveyor to inspect and file with Commission.