Loading...
HomeMy WebLinkAboutCross section plan 2-22-2210" DIAM piers located at 14' OC; installed by hydraulic compression PIER DOCK 5/8" GALV BOLT-WASHERS-DOUBLE NUT (@8") FROM PIER DOUBLE 3" X12" X 14' PT (MARINE GRADE) TOP OF EXISTING BULKHEAD =5.78 NAV 88USE THRU-FLOW COMPOSITE DECK SURFACE -WASHERS-NUTS B.V.W.1+20 1+10 1+00 0+90 0+80 0+70 0+60 0+50 0+40 0+30 0+20 0+1012.4213.0211.2211.829.4210.6210.02 8.228.827.627.02MHW= (+)2.30 MLW= (-)1.3 DOCK PLATFORM FLOATS R A M P T O P L A T F O R M 2" X 4" W/2" X 6" "T" SUPPORT RAIL THRUFLOW™ =ELEV=7.02 10" ° MARINE PIER @ 16' (driven, and cut flush SUPPORTED WITH (4) 2" X 12" X 14' JOISTS 4" X 4" PT POSTS 2" X 6" PT 2" X 12" PT BEAMS DOUBLERS BOLTED 12.00 2" X 12" CROSSTIE AND RUNNER TRUSS (X 2) 4'-10" LESS THAN 3' SEPARATION FROM MARSH 2" X 12" CROSSTIE AND RUNNER TRUSS (X 2) GREATER THAN 3' SEPARATION FROM MARSH PLANK STEPS 4' 0+600+500+400+300+200+100+00 on top); POINTED POLY "BIRD" CAPS CENTER TO CENTER OF PILES PLATFORM =14.2 FF=19.5 HOUSE 13.62 LANDING= LANDING= Buffer area between LOW and straw wattle Window well drop-in elevated stairway example erosion control as needed EXISTING DOCK AND STAIRS NEW W 5/8" GALV BOLTS 2" X 4" SADDLE ALUM I N U M 14' **Note: DOCK, nor any water-dependent structures included in this amendment. BATBERRY AND BUFFER AREA MITIGATION AREA - VIOLATIONRev: 02-23-24-ViolationBulkhead & Window wellsStairway to Dock