HomeMy WebLinkAboutplan hand revised 3.7.24—• , —.... " —m . —sw wvw6a% &jmiw i%p P"rc rnwrvau+ iu or.
RECONSTRUTCED IN KIND, WITH NO EXPANSION.
9. THE THREE EXISTING "FLAGSTONE" STEPS EAST OF THE DOCK SHALL BE REBUILT WITH GRANIT
STEPS FOR STABILITY.
to, f�uw- , ) V �" 4-t, �' I + � "t- aw i-I (&� '�-a Y/7/2 r
Yarmouth f'omervation Cornnl.'.
Datc: _ 4
1
I I
1 �
DATE
TE #23--042
`bbp'L-�ri oF,t�s�cy
DANIELA �s
OJALA
CIVIL y
No. 46502
\Fc 4-�w�>2
DANIEL ti
A.
OJALA
q No. 40980
Ql vv-
8S�O nQ>ii
DANIEL A. OJALA, P.E., P.L.S.
NO PART OF THIS DRAWING MAY BE USED BY ANY
PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF
SHOREFRONT CONSULTING AND
DOWN CAPE ENGINEERING, INC.
PLAN SHOWING PROPOSED
SEASONAL DOCK
sc-220
� AS SH01�"
°� 9 8 3
pow
MATTHEW & SARAH FITZSIMMONS
Dow IV MCB
° IN DO
FlTYSIMMONS.D
DOWN CAPE ENGINEERING
030 MAIN STREET
YARMOIJTHPORT, MA 02873
(S08) W2--041
SHOREFRONT CONSULTING_'
200 CENTER STREET
DENNIS PORT, MA. 02630
(008) 280-8048
1 1