HomeMy WebLinkAboutEngineer Certification Letter * lb JC ENGINEERING, Inc.
q; Civil & Environmental Engineering
41/4,„ '4 2854 Cranberry Highway
East Wareham, Massachusetts 02538
Ph. 508-273-0377
March 8, 2024
Mr. Jay Gardiner
Health Director
Town of Yarmouth
Health Division
1146 Route 28
South Yarmouth, MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
36 Pebble Beach Way, South Yarmouth,Massachusetts
Dear Mr. Gardiner:
This letter is to certify that the new septic system located at 36 Pebble Beach Way was
constructed in substantial compliance with the approved design plan entitled, Proposed
Septic System Upgrade, dated January 22, 2024, prepared by our office. See attached as-
built plan provided by the installer (Robert B. Our Co., Inc.).
Should you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
•
John I,. CIi , Jr., PE, PLS
President
JLC/mcp
cc: RBO MAR 1 y 2024
File
HEALTH DEPT