Loading...
HomeMy WebLinkAboutEngineer PlanGENERAL NOTES: I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET, SEE SITE PLAN. 3. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR APPROVED EQUAL. 6. SEPTIC TANK AND D-BOX SHALL BE REINFORCED PRECAST CONCRETE AND WATERTIGHT. D-BOX SHALL BE WATER TESTED TO CHECK FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE". 1-888-DIG-SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING CESSPOOLS TO BE PUMPED DRY. REMOVED IN THE AREA OF THE NEW SYSTEM AND BACKFILLED WITH CLEAN SAND. 9. EXISTING INVERTS *2 AND *3 ARE TO BE VERIFIED PRIOR TO CONSTRUCTION. ELEVATIONS SHOWN ARE THE LOWEST POSSIBLE. SHOULD EXISTING INVERTS BE LOWER. THE WHOLE SYSTEM MAY NEED TO BE LOWERED. CONTACT THE DESIGN ENGINEER SHOULD THE EL VA T IONS CHANGE. ACCESS COVERS MUST BE WITHIN 9' MINIMUM. 6' OF FINISH GRAD 3' MAXIMUM COVER 100 44 FIRST 2' TO BE LEVEL MIN 2' OF PEASTONE 4' D/AM PIPf 314' - 1 1/2 DIA. *I-98.6 96.45 96.2 10'16' H-20 �' DOUBLE WASHED STONE *2-97.25 a BAFFL£ 96.37 '� 96. 0 o 94.67 *3-97.5 3 OUTLET 8 HIGH CAPACITY INFI LTWOR 96.7 'D D-BOX CHAMBERS W/4' STONE AROUND, 6' I500 GAL UNDER SEPTIC TANK I0.83'w X 58'1 X 16'd 6' CRUSHED STONE OR COMPACTED BASE PROFILE : NOT TO SCALE wp BM CATCH BASIN R RIM 99.69 np gF CAPACI TY ATOR CHAMBERS 'ONE AROUND C \J INVERT ELEVATIONS: INVERT AT BUILDING */. 98.6 INVERT AT BUILDING *2: 97.25 INVERT AT BUILDING *3: 97.5 INVERT IN SEPTIC TANK. 96•7 INVERT OUT SEPTIC TANK: 96.45 INVERT IN DIST. BOX: 96.37 INVERT OUT DIST. BOX: 96.2 INVERT IN LEACH CHAMBER: 96.0 , BOTTOM OF LEACH CHAMBER: 95. 17 - ADJUSTED GROUND WATER: N/A OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE *l: 89.6 DESIGN CRITERIA: DESIGN FLOW: 3 CHAIR DENTIST OFFICE AT 200 G.P.D PER CHAIR EOUALS 600 G.P.D. SEPTIC TANK REOUIRED: 600 G.P.D. X 2009 - 1200 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REOUIRED: DESIGN PERC RATE ( 5 MIN/INCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 600 GPD / 0.74 GPD/SF - 811 S.F. REOUIRED I PROVIDED: 8 HIGH CAPACITY INFILTRATOR CHAMBERS W/4' STONE AROUND. A-611 S.F. 811 S.F. x 0.74 - 600 GPD SOIL TEST PIT DA TA& INDICATES INDICA TES PERCOLATION = OBSERVED TEST GROUNDWATER TP *1 0' HORIZON TEXTURE COLOR 99.6 A LOAMY IOYR SAND 4/2 / ................... 8. D LOAMY 98.9 IOYR D SAND 5/8 97.9 C I MEDIUM 2.5Y SAND 6/4 46' 120 ' 1 NO WATER 1 69.6 s' IRSl' V \ Al'i o DATE: JANUARY 6. 2000 �1so�F�oE Pap TEST BY: STEPHEN HAAS 65Pp�; 9-9 aT- WITNESSED BY: KELDA WELSH PERC RATE: C MIN/INCH 1 VARIANCES REQUIRED: �ASt0�E / TITLE 5. MAXIMUM FEASIBLE COMPLIANCE 4 y�F o ! .OAP 20011* SECTION 15.211:0) MINIMUM SETBACK DISTANCES �. l0' IS REQUIRED BETWEEN THE SAS AND THE PROPERTY LINE. 7' VARIANCE IS REOUESTED. N .N `"9 '� LOT D `s.'' ,� ,: �N �,-- e�rcArcHeasiN ®RIM - 100.49 / 1 3' IS PROPOSED, A 20' IS REOUIRED BETWEEN THE SAS AND THE CELLAR WALL. 10. 700+ S.F. �, F. 61, S,D��p�K 15' IS PROPOSED. A 5' VARIANCE IS REOUESTED. 5 ` D S -/� Q T / C - -7- S S E-M O E S / G /V / 2-58 ROUTE- 28 . MAP 00. PARCEL / 22 <S'3/V3> Tf� YA R pro v 7", "A . . -" PREPARED FOR po 10 Ocus ,-/OH/V S / S T / 23 CHEST•ERF/ELLS ST. RE -AD V/LLE. MA 02/37 SCAL E : / " - 20 MARCH 3 . 2000 REVISED: MAY il, 2000 EAGLE SUFRVEY I NG I NC 923 Route 6A Yarrnouthpart MA- 02675 1 (508) 362-8 1 32 (508) 432-5333 LOCUS MAP 0 /0 20 40