Loading...
HomeMy WebLinkAboutNOI Plan SetSETUCKET ROAD PARTIAL CULVERT REPLACEMENT INDEX OF DRAWINGS 02 SHEET NO.DESCRIPTION TOWN OF YARMOUTH SETUCKET ROAD LOCATION PLAN SCALE IN FEET 1000 0 1000 2000 YARMOUTH, MA BID DOCUMENTS MAY 2024 CLIENT: TOWN OF YARMOUTH 1146 ROUTE 28 SOUTH YARMOUTH, MA 02664 CIVIL ENGINEER: GREEN INTERNATIONAL AFFILIATES, INC. CIVIL AND STRUCTURAL ENGINEERS 100 AMES POND DR., TEWKSBURY, MA (978) 923-0400 PROJECT AREA EXISTING CONDITIONS PLAN NOTES AND LEGEND TITLE SHEET & INDEX01 03 04 SITE PLAN SITE DETAILS05-07 SHEET NO. 7OF1 PREPARED BY: TOWN OF YARMOUTH PREPARED FOR: SHEET NO. 7 DRAWING TITLE: DESIGN SUBMISSION: Civil and Structural Engineers (978) 923-0400 TEWKSBURY, Massachusetts GreenIntl.com GREEN INTERNATIONAL AFFILIATES, INC. PARTIAL CULVERT REPLACEMENT SETUCKET ROAD OF SCALE: DESIGNED BY: DRAWN BY: CHECKED BY:PROJECT NO. 23089 SS DATE: MAY 2024 NO.DATE REVISIONS BID DOCUMENTS AS SHOWN SK/GS SK 2 GENERAL NOTES: 1.THE EXISTING CONDITIONS SHOWN ON THIS BASE MAP ARE THE RESULT OF AN ON-THE- GROUND INSTRUMENT SURVEY PERFORMED BETWEEN JANUARY 16, 2024 AND JANUARY 18, 2024 BY GREEN INTERNATIONAL AFFILIATES, INC.(GREEN). 2.HORIZONTAL AND VERTICAL CONTROL WAS ESTABLISHED BY GREEN INTERNATIONAL AFFILIATES, INC, BETWEEN JANUARY 16, 2024 AND JANUARY 18, 2024. HORIZONTAL DATUM IS BASED ON THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM (MAINLAND) NAD83 (2011), 2010.00 EPOCH. VERTICAL DATUM IS NAVD88 (COMPUTED USING GEOID18). 3.WETLAND RESOURCE AREAS IDENTIFICATION AND DELINEATION PERFORMED BY ECOSYSTEM SOLUTIONS ON JANUARY 15, 2024. 4.CONTRACTOR SHALL PROTECT ALL PROPERTY MARKERS OF ABUTTERS. 5.TREATMENT OF SLOPE AREA SHALL BE REPLACED IN KIND, OR AS NOTED. 6.MAINTAIN A MINIMUM OF 6 INCHES OF SEPARATION BETWEEN OUTSIDE OF PIPES AT ALL UTILITY CROSSINGS. NOTIFY ENGINEER IF 6 INCHES OF SEPARATION CANNOT BE PROVIDED DUE TO FIELD CONDITIONS. 7.ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF LEGALLY OFF SITE. 8.ALL SITE WORK SHALL BE SECURED AT THE END OF THE WORK DAY TO REDUCE EROSION AND SEDIMENT PROBLEMS. THIS INCLUDES AS APPLICABLE, COVERING STOCKPILES OF SOIL, INSTALLING TEMPORARY VEGETATION OR BY USING GEOTEXTILES TO COVER DISTURBED AREAS WITH STEEPER SLOPES. 9.ANY DISCREPANCIES BETWEEN DRAWINGS, SPECIFICATIONS AND SITE CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE OWNER'S REPRESENTATIVE FOR CLARIFICATION AND RESOLUTION PRIOR TO BIDDING OR CONSTRUCTION. SUMMARY OF UTILITY MAPPING QUALITY LEVELS: THE FOLLOWING IS A SUMMARY OF THE SURVEY MAPPING LEVELS FOR UTILITIES AS DESCRIBED IN ASCE STANDARD 38-02, "STANDARD GUIDELINE FOR THE DEPICTION OF EXISTING SUBSURFACE UTILITY DATA". THESE GUIDELINES ARE MORE FULLY DESCRIBED IN THE ASCE STANDARD. UTILITY QUALITY LEVEL A: PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE (OR VERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OF SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT. MINIMALLY INTRUSIVE EXCAVATION EQUIPMENT IS TYPICALLY USED TO MINIMIZE THE POTENTIAL FOR UTILITY DAMAGE. A PRECISE HORIZONTAL AND VERTICAL LOCATION, AS WELL AS OTHER UTILITY ATTRIBUTES, IS SHOWN ON PLAN DOCUMENTS. ACCURACY IS TYPICALLY SET TO 15-MM VERTICAL AND TO APPLICABLE HORIZONTAL SURVEY AND MAPPING ACCURACY AS DEFINED OR EXPECTED BY THE PROJECT OWNER. UTILITY QUALITY LEVEL B: INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. QUALITY LEVEL B DATA SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED BY THE PROJECT AND REDUCED ONTO PLAN DOCUMENTS. UTILITY QUALITY LEVEL C: INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND BY USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION TO QUALITY LEVEL D INFORMATION. UTILITY QUALITY LEVEL D: INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS.INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS. NOTES AND LEGEND UTILITY NOTES: 1.ALL UNDERGROUND UTILITIES AS SHOWN WERE COMPILED USING FIELD SURVEY INFORMATION AND AVAILABLE RECORD INFORMATION. 2.RECORD UTILITY INFORMATION FROM THE VARIOUS UTILITY COMPANIES AND PUBLIC AGENCIES, ARE APPROXIMATE ONLY AND ACTUAL LOCATIONS MUST BE DETERMINED IN THE FIELD. 3.ALL UTILITY COMPANIES, PUBLIC AND PRIVATE MUST BE NOTIFIED, INCLUDING THOSE IN CONTROL OF UTILITIES NOT SHOWN ON THIS PLAN, (SEE CHAPTER 370, ACTS OF 1963, MASSACHUSETTS) PRIOR TO DESIGNING, EXCAVATING, BLASTING, INSTALLING, BACKFILLING, GRADING, PAVEMENT RESTORING OR REPAVING. 4.THE LOCATION OF THE EXISTING UTILITIES ARE SHOWN APPROXIMATE AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES AND SUBSURFACE STRUCTURES. THE CONTRACTOR IS RESPONSIBLE FOR MAKING FIELD INVESTIGATIONS AND OBTAINING INFORMATION FROM UTILITY COMPANIES AND INDIVIDUALS TO PINPOINT THE LOCATION AND ELEVATION OF ALL SUBSURFACE UTILITIES AND STRUCTURES. DIG - SAFE : TELEPHONE 1-888-344-7233 5.SUBSURFACE UTILITY LOCATIONS HAVE BEEN PLOTTED TO MEET UTILITY QUALITY LEVEL "C" AS DESCRIBED IN ASCE STANDARD 38-02 AND SUMMARIZED ON THIS SHEET. THE UNDERGROUND UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS BASED ON ABOVE-GROUND FIELD OBSERVATION AND EXISTING RECORD INFORMATION RECEIVED FROM UTILITY STAKE-HOLDERS. 6.DRAINAGE ELEVATIONS ARE PROVIDED FOR DESIGN PURPOSES ONLY. THE CONTRACTOR SHALL VERIFY BY TEST PIT, THE LOCATIONS OF EXISTING UTILITIES WHICH MAY CONFLICT WITH THE PROPOSED DRAINAGE DESIGN. ANY FIELD ADJUSTMENTS REQUIRED WILL BE MADE AS APPROVED OR AS DIRECTED BY THE ENGINEER. ONLY AFTER THE CONTRACTOR VERIFIES ELEVATIONS FOR CONSTRUCTABILITY OF THE DRAINAGE SYSTEM SHALL ANY STRUCTURES BE ORDERED. ANY FIELD ADJUSTMENTS TO LINE AND GRADE UP TO A DEPTH OF 5 FEET SHALL BE INCLUDED IN THE COST OF THE PIPE. PIPE EXCAVATION GREATER THAN 5 FEET WILL BE PAID UNDER CLASS B TRENCH EXCAVATION. 7.WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED TO THE ENGINEER FOR RESOLUTION OF THE CONFLICT. 8.THE CONTRACTOR SHALL ALTER THE MASONRY OF THE TOP SECTION OF ALL EXISTING DRAINAGE STRUCTURES AS NECESSARY FOR CHANGES IN GRADE, AND RESET ALL WATER AND DRAINAGE FRAMES, GRATES, AND BOXES TO THE PROPOSED FINISH SURFACE GRADE. 9.AREA OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION, AT NO ADDITIONAL COST TO THE OWNER. SITE PREPARATION NOTES 1.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES AND PROCEDURES; AND FOR THE SAFETY PRECAUTIONS AND PROGRAMS REQUIRED FOR THE WORK UNDER THIS CONTRACT. THE CONTRACT DOCUMENTS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY AND THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING ALL SAFETY BARRIERS, WARNING FLASHERS, AND THE LIKE AS REQUIRED FOR THE PROTECTION OF WORKERS AND THE PUBLIC. COMPLY WITH OSHA REQUIREMENTS. 2.PRIOR TO THE START OF WORK, INSTALL WOVEN POLYPROPYLENE GEOTEXTILE FILTER BAGS IN CATCH BASINS. WHEN INSTALLING FILTER BAGS, HOLD APPROXIMATELY SIX INCHES OUTSIDE THE FRAME AND REPLACE THE GRATE, USING THE WEIGHT OF THE GRATE TO HOLD THE FILTER BAG IN PLACE. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CONSTRUCTION PERMITS REQUIRED FOR THIS PROJECT. 4.THE CONTRACTOR SHALL PROTECT ALL UTILITIES WITHIN THE PROJECT AREA, IN THE STREET, AND ON ADJACENT PROPERTIES FROM DAMAGE AND UNDERMINING DURING EXCAVATION. 5.ALL EXISTING UTILITY FRAMES, COVERS AND/OR GRATES WITHIN PROJECT LIMITS ARE TO BE ADJUSTED TO PROPOSED FINISHED GRADE UNLESS OTHERWISE NOTED. 6.TEMPORARY CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS SHOWN ON SITE DETAILS. 7.TREE AND SHRUB PROTECTION SHALL BE PROVIDED EVERYWHERE THE TREELINE IS WITHIN 5 FEET OF THE LIMIT OF WORK ALONG THE PROJECT UNLESS OTHERWISE NOTED ON THE PLAN. 8.TREE PROTECTION ZONE SHALL BE MARKED BY CONSTRUCTION FENCING TO BE LEFT IN PLACE FOR THE DURATION OF THE PROJECT. NO EQUIPMENT SHALL ENTER OR MATERIALS SHALL BE STORED WITHIN THIS ZONE. STRAW WATTLES SHALL BE PLACED ALONG THE UPHILL EDGE OF THE ZONE TO ENSURE THAT RUNOFF FROM THE CONSTRUCTION SITE DOES NOT ENTER THIS AREA. ALL EXCAVATION AND CONSTRUCTION OF PAVEMENT AND UTILITIES AND BOULDER PLACEMENT SHALL BE ACCOMPLISHED FROM OUTSIDE THIS ZONE. WORKERS SHALL ENTER THE ZONE ONLY FOR THE REMOVAL OF SOD AND PLACEMENT OF MULCH. ROOTS OVER 1” THAT ARE SEVERED BEYOND THE TREE PROTECTION ZONE SHALL BE CUT CLEANLY BY HAND. EROSION AND SEDIMENT CONTROLS 1.THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING THE EROSION AND SEDIMENT DURING THE CONSTRUCTION PROCESS. SITE SPECIFIC CONDITIONS MAY REQUIRE MODIFICATIONS IN THE FIELD, BUT THE CONTRACTOR MUST ENSURE THAT THE PROJECT SPECIFICATIONS THAT ARE DEVELOPED IN THE FIELD MEET THE MINIMUM REQUIREMENTS OF THIS PLAN. 2.IN ORDER TO MINIMIZE EROSION AND SEDIMENT RUNOFF FROM THE SITE, THE CONTRACTOR SHOULD MAINTAIN EXISTING VEGETATION WHERE POSSIBLE AND STABILIZE THE DISTURBED PORTIONS OF THE SITE AS QUICKLY AS POSSIBLE. THIS MAY INCLUDE PHASING THE PROJECT AS NEEDED TO MINIMIZE THE SIZE OF THE DISTURBED AREAS ON THE SITE. 3.THE CONTRACTOR MUST ALSO ANTICIPATE INCREASED RUNOFF FROM STEEPER SLOPES AND DURING HIGH GROUNDWATER CONDITIONS. THIS MAY OCCUR DURING THE WET SEASON (TYPICALLY MARCH THROUGH APRIL) OR AFTER SIGNIFICANT PRECIPITATION EVENTS. 4.THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF SILT FENCES, DRAINAGE SWALES, EARTH DIKES, TEMPORARY SETTLING BASINS, CHECK DAMS AND TEMPORARY OR PERMANENT SEDIMENT BASINS. THESE PRACTICES DIVERT FLOWS FROM EXPOSED SOILS, LIMIT RUNOFF AND THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS OF THE SITE TO THE DEGREE ATTAINABLE. 5.THE CONTRACTOR SHALL, AT ALL TIMES, HAVE A STOCKPILE OF STRAW WATTLES AND SILT FENCE ADEQUATE TO REINFORCE/REPLACE EROSION AND SEDIMENT CONTROL AS NEEDED. 6.ALL AREAS OF DISTURBANCE MUST HAVE TEMPORARY OR FINAL STABILIZATION WITHIN 14 DAYS OF THE INITIAL DISTURBANCE. AFTER THIS TIME, ANY DISTURBANCE IN THE AREA MUST BE STABILIZED AT THE END OF EACH WORK DAY. THE FOLLOWING EXCEPTIONS APPLY: i) STABILIZATION IS NOT REQUIRED IF WORK IS TO CONTINUE IN THE AREA WITHIN THE NEXT 24 HOURS AND THERE IS NO PRECIPITATION FORECAST FOR THE NEXT 24 HOURS. ii) STABILIZATION IS NOT REQUIRED IF THE WORK IS OCCURRING IN A SELF-CONTAINED EXCAVATION WITH A DEPTH OF 2 FEET OR GREATER. 7.THE CONTRACTOR SHALL UTILIZE STREET SWEEPING AND OTHER METHODS OF CONTROLLING SEDIMENT TO ENSURE THAT NO SEDIMENT ENTERS ANY PUBLIC RIGHT-OF-WAY AS OFTEN AS NECESSARY. 8.CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL. DUST CONTROL SHALL INCLUDE THE WATERING OF UNPAVED ROAD SURFACES AND STREET SWEEPING OF PAVED SURFACES. STREET SWEEPING SHALL OCCUR ON THE PAVED SURFACES WITHIN THE SITE AND OFF THE SITE WHERE VEHICLE TRACKING OF SEDIMENTS HAS OCCURRED. SITE GRADING NOTES 1.PROPOSED GRADING SHALL MATCH EXISTING GRADES AT THE LIMIT OF WORK. WHERE PROPOSED GRADES MEET EXISTING GRADES, CONTRACTOR SHALL BLEND GRADES TO PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING AND NEW WORK. 2.GRADE ALL AREAS TO DRAIN. 3.WALKWAYS SHALL BE CONSTRUCTED WITH A CROSS SLOPE OF NO MORE THAN 1.5% AND A LONGITUDINAL SLOPE OF NO MORE THAN 4.5%. 4.CONTRACTOR SHALL ADJUST UTILITY ELEMENTS MEANT TO BE FLUSH WITH GRADE (I.E. UTILITY MANHOLES, CATCH BASINS, ETC.) THAT ARE AFFECTED BY SITE WORK OR GRADE CHANGES, WHETHER SPECIFICALLY NOTED ON PLANS OR NOT. 5.ANY STONES OVER 4-INCHES THAT ARE OBSERVED WITHIN EXISTING SUBBASE TO REMAIN WILL BE REMOVED AND REPLACED WITH GRAVEL SUBBASE. ABBREVIATIONS (EXISTING) 10. ALL AREAS DISTURBED WITHIN THE LIMIT OF WORK WILL BE RESTORED TO EXISTING CONDITIONS OR BETTER. LEGEND (EXISTING) ⅊ CB GG GM TPL UPL# WG SETUCKET R O A D AUNT DORAHS LANEPREPARED BY: TOWN OF YARMOUTH PREPARED FOR: SHEET NO. 7 DRAWING TITLE: DESIGN SUBMISSION: Civil and Structural Engineers (978) 923-0400 TEWKSBURY, Massachusetts GreenIntl.com GREEN INTERNATIONAL AFFILIATES, INC. PARTIAL CULVERT REPLACEMENT SETUCKET ROAD OF SCALE: DESIGNED BY: DRAWN BY: CHECKED BY:PROJECT NO. 23089 SS DATE: MAY 2024 NO.DATE REVISIONS BID DOCUMENTS AS SHOWN SK/GS SK 3 20 SCALE: 1" = 20' 0 50 100 EXISTING CONDITIONS PLAN NAD83 SETUCKET R O A D AUNT DORAHS LANEPROP. CATCH BASIN W/ BEEHIVE GRATE TOP OF GRATE=46.75 CB FRAME RIM=46.00 INV.=42.00 REMOVE AND RESTORE EXIST. LANDSCAPED AREA D PROTECT AND SUPPORT EXIST. CB. INSTALL CB INLET PROTECTION FILTER BAG PROP. TREE PROTECTION INSTALL NEW ECCENTRIC DMH RIM=51.54 INV.A=40.67(ME) INV.B=40.92 PROP. 3'-12''D RCP. CONNECT TO EXIST. 12'' RCP WITH 12'' COUPLING/FIELD CONNECTION LIMIT OF PAVEMENT RESTORATION REMOVE AND RESTORE EXIST. BIT BERM. MATCH EXISTING GRADES PROTECT AND SUPPORT EXIST. 2-4''T PVC CONDUITS REMOVE AND DISPOSE EXIST. DMH (BURIED) LIMIT OF PAVEMENT RESTORATION PROP. 45'-6''D HDPE PIPE RESTORE EXIST. GRASS AREA PROP. TRENCH LIMITS PROTECT AND SUPPORT EXIST. 12''D RCP 47.1 (ME) X 46.5 (ME) X 46.1 (ME) X 47.2 (ME) X 47.5 X 47.3 X PROTECT EXIST. HEADWALL REMOVE, STACK, AND REUSE AS APPLICABLE. INSTALL ADDITIONAL STONES FOR PIPE ENDS. REFER TO MASSDOT SPECIFICATION SECTION M2.02.3 STONE FOR PIPE ENDS. PROP. SEDIMENT AND EROSION CONTROL SILT BARRIER CUT AND PLUG EXIST. 6'' DRAIN 48 PROP. BERM 47 REMOVE AND DISPOSE EXIST. 8'' TREE PREPARED BY: TOWN OF YARMOUTH PREPARED FOR: SHEET NO. 7 DRAWING TITLE: DESIGN SUBMISSION: Civil and Structural Engineers (978) 923-0400 TEWKSBURY, Massachusetts GreenIntl.com GREEN INTERNATIONAL AFFILIATES, INC. PARTIAL CULVERT REPLACEMENT SETUCKET ROAD OF SCALE: DESIGNED BY: DRAWN BY: CHECKED BY:PROJECT NO. 23089 SS DATE: MAY 2024 NO.DATE REVISIONS BID DOCUMENTS AS SHOWN SK/GS SK 4 20 SCALE: 1" = 20' 0 50 100 ME MATCH EXISTING PROP.PROPOSED EXIST. EXISTING DMH DRAIN MANHOLE LEGEND & ABBREVIATIONS (PROPOSED) D CB CATCH BASIN DRAIN MANHOLE SITE PLAN NAD83 LANDSCAPE RESTORATION PAVEMENT RESTORATION LIMIT OF WORK SILT FENCE AND COMPOST FILTER TUBE TREE PROTECTION PROP CONTOUR SPOT GRADE 48 x 47.5 PREPARED BY: TOWN OF YARMOUTH PREPARED FOR: SHEET NO. 7 DRAWING TITLE: DESIGN SUBMISSION: Civil and Structural Engineers (978) 923-0400 TEWKSBURY, Massachusetts GreenIntl.com GREEN INTERNATIONAL AFFILIATES, INC. PARTIAL CULVERT REPLACEMENT SETUCKET ROAD OF SCALE: DESIGNED BY: DRAWN BY: CHECKED BY:PROJECT NO. 23089 SS DATE: MAY 2024 NO.DATE REVISIONS BID DOCUMENTS AS SHOWN SK/GS SK 5 SITE DETAILS I MORTAR JOINT "V" OPENING 6" 24" STEP (TYP.) PRECAST BASE SECTION PREPARED SUBGRADE 6" 4'-0" 12" (TYP.) PRECAST RISER SECTION BUTYL JOINT SEALANT OUTLET PIPE (INFLOW) INSIDE DIA. 12'' NOTES: 1. PRECAST CONCRETE SECTIONS SHALL CONFORM TO ASTM C-478 2. STEEL REINFORCING SHALL CONFORM TO ASTM A185 3. MANHOLE STEPS SHALL BE 14" WIDE STEEL REINFORCED COPOLYMER POLYPROPYLENE PLASTIC AND SHALL BE CAST INTO MANHOLE SECTIONS BY THE PRECAST MANHOLE MANUFACTURER. HEAVY DUTY C.I. MANHOLE COVER MARKED "DRAIN" FINISHED GRADE FRAME AND COVER PROVIDE 30 " MAX. (DIA. VARIES) CRUSHED STONE BEDDING BENEATH STRUCTURE AND 6" BEYOND STRUCTURE WALL HEAVY DUTY C.I. CATCH BASIN FRAME SET IN FULL BED OF MORTAR. USE TWO (2) BRICK COURSES MAX. FOR GRADE ADJUSTMENT. PRECAST ECCENTRIC CONICAL RISER TYPICAL DRAIN MANHOLE DETAIL NOT TO SCALETMDRAIN PROPOSED PAVEMENT SEE PERMANENT TRENCH PAVEMENT DETAIL FULL DEPTH CONSTRUCTION 1'-0" 2'-0"MIN. EXISTING PAVEMENT SUBGRADE 1 1 MIN. TRANSITION 1'-0" MIN. SAWCUT EXIST. PAVEMENT (MATCH GRADE) TACK COAT EXIST. BIT. CONC. PAVEMENT OR OTHER MATERIAL TYPICAL SAWCUT DETAIL NOT TO SCALE TRENCH EXCAVATION AND BACKFILLING: 1/2 O.D.WATER LINES5'- 0" MIN. COVER FOR9" 12" W (MIN) O. D. PLASTIC WARNING TAPE PROPOSED FINISHED GRADE SUBGRADE REFER TO SPECIFICATION FOR MATERIAL REQUIREMENTS FIRST 3' BELOW GRADE OVERLAP FABRIC 12" AT END COMPACTED GRAVEL SUBBASE PLACED IN 6" LIFTS PIPE (DIAMETER VARIES) COMPACTED 3/4" DIA. CRUSHED STONE BEDDING PLACED IN 6" LIFTS PREPARED SUBGRADE4'- 0" MIN. COVER FORFORCE MAINTRENCH WIDTH(W): FOR PIPE £12"Ø; W= O.D. + 2'³3' FOR PIPE ³12"Ø; W= O.D. + 3' 1.EXCAVATE TRENCH BOTTOMS AS INDICATED. REMOVE STONES AND SHARP OBJECTS TO AVOID POINT LOADING. PLACE CRUSHED STONE PIPE BEDDING AS INDICATED. 2.PLACE AND COMPACT INITIAL BACKFILL OF SAND-GRAVEL MATERIAL, FREE OF PARTICLES GREATER THAN 1 INCH, TO A HEIGHT OF 12" ABOVE THE UTILITY LINE OR CONDUIT. 3.CAREFULLY COMPACT MATERIAL UNDER PIPE HAUNCHES AND BACKFILL EVENLY ON BOTH SIDES ALONG FULL LENGTH OF LINE TO AVOID DAMAGE OR DISPLACEMENT OF UTILITY SYSTEM. 4.COMPACT TRENCH BACKFILL IN 6" LIFTS WITH A HAND OPERATED (VIBRATOR PLATE) TAMPER AS FOLLOWS: UNDER PAVEMENT AND STRUCTURES; TO 95% MAX. DRY DENSITY PER ASTM D1557. UNDER SEEDED AREAS; 92% MAXIMUM DRY DENSITY PER ASTM D1557. PIPE TRENCH DETAIL NOT TO SCALE TOP OF GRATE= 46.75 2'X2' GRATE C.I. CATCH BASIN FRAME SET IN FULL BED OF MORTAR. USE TWO (2) BRICK COURSES MAX. FOR GRADE ADJUSTMENT. CB FRAME=46.00 PERMANENT TRENCH PATCH DETAIL NOT TO SCALE TACK COAT (TYP.) SAW CUT BOTH SIDES (TYP.) EXIST. PAVEMENT (TYP.) 1.75'' SUPERPAVE SURFACE COURSE 12.5(SSC-12.5) OVER EMULSION (TYP.) UNDISTURBED MATERIAL (TYP.) LIMIT OF EXCAVATION VARIES TRENCH WIDTH APPROVED BACKFILL MATERIAL PER SPECIFICATIONS OR ORDINARY BORROW COMPACTED GRAVEL BORROW12''12''12'' NOTES: 1.ALL TRENCH PATCHES IN THE ROADWAY SHALL BE THE MINIMUM 5.25" THICKNESS OR MATCH EXISTING PAVEMENT MATERIALS AND LAYER THICKNESS. 3.5'' SUPERPAVE BASE COURSE 37.5 (SBC-37.5) 1.PRECAST CONCRETE SECTIONS SHALL CONFORM TO ASTM C-478 2.STEEL REINFORCING SHALL CONFORM TO ASTM A185 NOTES: NOT TO SCALE CATCH BASIN WITH BEEHIVE GRATE DETAIL FLOW 1' HOOD UNDISTURBED MATERIAL (TYP.) SCREENED GRAVEL REINFORCING TO BE 9.9 in^2. /VERTICAL METER (MIN.) EACH WAY REINFORCING IN ACCORDANCE WITH a.a.s.h.t.o. DESIGNATION M199 PROVIDE "V" OPENINGS MORTAR ALL JOINTS ADJUST TO GRADE WITH BRICK MASONRY (TYP.) (MIN. OF ONE COURSE AND MAX. OF FIVE COURSES) OR PRECAST CEMENT CONCRETE RING (MAXIMUM 1' ADJUSTMENT) 1.5'-2' TAPERED SECTION OR ECCENTRIC 6" MIN. DEPTH VARIES HEIGHT OF RISER SECTION VARIES FROM 1' TO 4' 2" CL. (TYP.) 5" (MIN.) 4' SUMP (MIN.) 6" (TYP.) 6" (MIN.) 4' DIA. OUTSIDE OF PIPE +2" CLEARANCE 2' OUTLET PIPE 7.9'' (MIN.) INV.=42.00 3.5'' SUPERPAVE BASE COURSE 37.5 (SBC-37.5) 1.75'' SUPERPAVE SURFACE COURSE 12.5(SSC-12.5) OVER COMPACTED SUBGRADE 3.5'' SUPERPAVE BASE COURSE 37.5 (SBC-37.5) 1.75'' SUPERPAVE SURFACE COURSE 12.5 MIN. 9" COMPACTED GRAVEL SUB BASE BITUMINOUS CONCRETE WALKWAY DETAIL NOT TO SCALE CULVERT END 6' EXIST. GRADE PROP GRADE EXIST. HEADWALL TO REMAIN PROP. CLASS 2 STONES FOR PIPE ENDS. REFER TO MASSDOT SECTION M2.02.3 STONE FOR PIPE ENDS GEOTEXTILE FABRIC FOR SCOUR PROTECTION RIPRAP APRON AT INLET AND OUTLET OF CULVERT NOT TO SCALE SURFACE COURSE 12.5 PROTECT EXISTING HEADWALL WHEN PLACING THE STONES 2' FINISHED GRADE PROP. CLASS 2 STONES FOR PIPE ENDS. REFER TO MASSDOT SECTION M2.02.3 STONE FOR PIPE ENDS C:\Users\skhan\Pictures\Beehive two.PNG PREPARED BY: TOWN OF YARMOUTH PREPARED FOR: SHEET NO. 7 DRAWING TITLE: DESIGN SUBMISSION: Civil and Structural Engineers (978) 923-0400 TEWKSBURY, Massachusetts GreenIntl.com GREEN INTERNATIONAL AFFILIATES, INC. PARTIAL CULVERT REPLACEMENT SETUCKET ROAD OF SCALE: DESIGNED BY: DRAWN BY: CHECKED BY:PROJECT NO. 23089 SS DATE: MAY 2024 NO.DATE REVISIONS BID DOCUMENTS AS SHOWN SK/GS SK 6 SITE DETAILS II SEDIMENT BARRIER - COMPOST FILTER TUBE ENSURE FIRM CONTACT WITH GROUND TO PREVENT FLOW UNDERNEATH TUBES FOR SLOPES 3:1 OR AS NECESSARY, STAKE OR OTHERWISE SUPPORT TUBES (I.E., TREES, CINDER BLOCKS) AREA OF SOIL DISTURBANCE BIODEGRADABLE FABRIC PROTECTED ZONE FLOW 12" dia.* installed CAPTURE SEDIMENT AND PREVENT FLOW OFF SITE *9 INCH MAY BE USED FOR FLATTER SURFACES WITH APPROVAL FROM ENGINEER REDUCE HIGH WATER FLOW ONTO WORK ZONE 12 INCH STRAW WATTLE FOR USE ONLY ON SLOPES UP TO 5% AND WITH APPROVAL OF THE ENGINEER. NOT TO BE USED FOR WETLAND MITIGATION. 1" X 1" X 3' HARDWOOD STAKES STAKE MIN. OF EVERY 5 FEET TO SECURE TUBE OR PER MANUFACTURERS' INSTRUCTION TRENCH 3 INCHES INTO EXISTING SOIL. STAKE 6 INCHES MIN. INTO THE GROUND. FLOW 12" dia. installed SECTION PLACE TUBE AS CLOSE TO LIMIT OF SOIL DISTURBANCE AS POSSIBLE, ALONG CONTOURS, AND PERPENDICULAR TO FLOW. ADJUST LOCATION AS REQUIRED FOR OPTIMUM EFFECTIVENESS. DO NOT INSTALL IN WATERWAYS. CURVE ENDS UPHILL EXISTING TREE MIN. 3 FT OVERLAP FOR CONTINUOUS BARRIER. HARDWOOD STAKES PLACED OUTSIDE OF TUBES OR PER MANUFACTURERS' INSTRUCTION PROTECTED ZONE PLAN VIEW FLOW COMPOST FILTER TUBE BERM (SLOPES 2:1 OR STEEPER) NOT TO SCALE AREA OF SOIL DISTURBANCE RESOURCE AREA FLOW 1" X 1" X 4' HARDWOOD STAKES STAKE A MIN. OF EVERY 5 FEET TO SECURE TUBE OR PER MANUFACTURERS' INSTRUCTION 9-12" DIA.* INSTALLED 18" MIN. FLOW 10' MIN OVERLAP FOR CONTINUOUS BARRIER 9" MIN. TYP. RESOURCE AREA SECTION PLAN VIEW SEDIMENT BARRIERS - COMPOST FILTER TUBES & STRAW WATTLES SCALE: NOT TO SCALE COMPOST FILTER TUBE BERM (SLOPES 2:1 OR STEEPER) SCALE: NOT TO SCALE STR E E T 50' - 0 " M IN . WIDTH AS REQUIRED CONSTRUCTION ENTRANCE CRUSHED STONE GEOGRID 8" MIN. CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE INSTALLATION DETAIL EXIST. CB 1" REBAR FOR BAG REMOVE FROM INLET SEDIMENT COLLECTION SACK DUMP STRAP BAG DETAIL EXIST. CB DUMP STRAPS 2 EACH EXPANSION RESTRAINT (1/4" NYLON ROPE, 2" FLAT WASHERS) EROSION AND SEDIMENT CONTROLS 1.THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING THE EROSION AND SEDIMENT DURING THE CONSTRUCTION PROCESS. SITE SPECIFIC CONDITIONS MAY REQUIRE MODIFICATIONS IN THE FIELD, BUT THE CONTRACTOR MUST ENSURE THAT THE CHANGES MEET THE MINIMUM REQUIREMENTS OF THIS PLAN AND ARE APPROVED BY THE ENGINEER. 2.IN ORDER TO MINIMIZE EROSION AND SEDIMENT RUNOFF FROM THE SITE, THE CONTRACTOR SHALL MAINTAIN EXISTING VEGETATION WHERE POSSIBLE AND STABILIZE THE DISTURBED PORTIONS OF THE SITE AS QUICKLY AS POSSIBLE. THIS MAY INCLUDE PHASING THE PROJECT AS NEEDED TO MINIMIZE THE SIZE OF THE DISTURBED AREAS ON THE SITE. THE COST OF PHASING THE PROJECT IS INCIDENTAL TO THE CONTRACT. 3.THE CONTRACTOR MUST ALSO ANTICIPATE INCREASED RUNOFF FROM STEEPER SLOPES AND DURING HIGH GROUNDWATER CONDITIONS. THIS MAY OCCUR DURING THE WET SEASON (TYPICALLY MARCH THROUGH APRIL) OR AFTER SIGNIFICANT PRECIPITATION EVENTS. 4.ALL DISTURBED SURFACES SHALL BE STABILIZED WITHIN 14 DAYS AFTER CONSTRUCTION IN ANY PORTION OF THE SITE THAT HAS BEEN COMPLETED OR WHERE CONSTRUCTION HAS TEMPORARILY CEASED. 5.THE CONTRACTOR SHALL, AT ALL TIMES, HAVE A STOCKPILE OF COMPOST FILTER TUBES ADEQUATE TO REINFORCE/REPLACE EROSION AND SEDIMENT CONTROL AS NEEDED. TEMPORARY INLET FILTER BAG DETAIL NOT TO SCALE POLYPROPYLENE "BOOT"GRATE OVERFLOW CATCH BASIN PREPARED BY: TOWN OF YARMOUTH PREPARED FOR: SHEET NO. 7 DRAWING TITLE: DESIGN SUBMISSION: Civil and Structural Engineers (978) 923-0400 TEWKSBURY, Massachusetts GreenIntl.com GREEN INTERNATIONAL AFFILIATES, INC. PARTIAL CULVERT REPLACEMENT SETUCKET ROAD OF SCALE: DESIGNED BY: DRAWN BY: CHECKED BY:PROJECT NO. 23089 SS DATE: MAY 2024 NO.DATE REVISIONS BID DOCUMENTS AS SHOWN SK/GS SK 7 SITE DETAILS III LIMIT OF CONSTRUCTION IMPACT (REFER TO PLANS) EXISTING TREE EXISTING TREE LIMIT OF FENCING (MULTIPLE TREES) LIMIT OF CANOPY (VARIES) AREA OF UNDISTURBED ROOT ZONE LIMIT OF FENCE (INDIVIDUAL TREE) WOODEN OR METAL POSTS (MAX. 8' SPACING) TREE PROTECTION DETAIL NOT TO SCALE ZONE OF CONSTRUCTION IMPACT (CUT/FILL) WOODEN OR METAL POSTS (TYPICAL) EXISTING TREE EXISTING GRADE NOTE: CONTRACTOR SHALL DO ALL WORK WITHIN THE DRIP LINE OF EXISTING TREES TO BE PROTECTED BY HAND. FOLLOWING ANY REQUIRED EXCAVATION, TEMPORARY FENCE SHALL BE INSTALLED BETWEEN THE PROPOSED WORK AND THE TREE. THE FENCE SHALL BE LOCATED AT THE EDGE OF PROPOSED CONSTRUCTION AND AS CLOSE TO THE DRIP LINE AS POSSIBLE. EXISTING TREE (MULTIPLE TREES) LIMIT OF PROTECTIVE FENCING (MULTIPLE TREES) LIMIT OF PROTECTIVE FENCING (INDIVIDUAL TREE) LIMIT OF CONSTRUCTION IMPACT (VARIES- REFER TO PLANS) PROTECTED ROOT ZONE (DISTANCE VARIES) NO STORAGE OF EQUIPMENT OR STOCKPILING OF MATERIALS PRUNE ROOTS EXPOSED &/OR DAMAGED BY EXCAVATION WITH A SHARP SAW INSTALL PROTECTIVE FENCING AT EDGE OF DRIPLINE (WHEN POSSIBLE), OR LIMIT OF CUT/FILL. MIN. DISTANCE FOR FENCING = 6 FT FROM TREE FENCING. MAY BE PLASTIC SNOW FENCE OR CHAIN LINK (4 FT HIGH MIN.) 2x4 DIMENSIONAL LUMBER ATTACHED W/METAL STRAPPING AT 2 LOCATIONS (MIN.). PLACE BURLAP BETWEEN LUMBER AND TREE. DO NOT DAMAGE BARK. PRUNE PER ANSI AND NAA STANDARDS. REMOVE DEAD WOOD & DAMAGED BRANCHES. TIE UP BRANCHES IF RISK OF DAMAGE FROM CONSTRUCTION EQUIPMENT. AS LARGE AS POSSIBLE STOCKPILED MATERIAL NOT TO SCALE 6" MIN. ELEVATION STOCKPILED JOB EXCAVATED MATERIALS BURY FILTER FABRIC IN 6"x6" TRENCH STAKED FILTER TUBES WITH STAKES EVERY 10 FEET (TYP.) WOOD STAKES (8' O.C.) SILT FENCE FINISHED GRADE UNDISTURBED MATERIAL 6" MIN. SEED HAY MULCH WHERE REQUIRED 4" TOP SOIL (LOAM) ACCEPTABLE COMPACTED, GRADED SUBGRADE LOAM AND SEED NOT TO SCALE 6" LOAM AND SEED TYPE I BITUMINOUS CONCRETE BERM TO BE POURED MONOLITHICALLY WITH BASE COURSE OF PAVEMENT SEE BITUMINOUSCONCRETEPAVEMENT DETAIL(THIS SHEET)3" 12" CAPECOD BERM DETAIL NOT TO SCALE