Loading...
HomeMy WebLinkAboutReview Checklist 1-2S-/D 14 /9/7' 47 • -- lie OWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. /' Z_ Lot ' D Zone of Contribution: In Out" Acreage �� Commercial: Residential: \, Street: _7 (.`1 is �/ /��'' /7� Village: V' Floor Plan: t/ # Bedrooms: Owner: Vg_ r C /✓frz5 c (/ Installer: -//0-1 4.ree 7 Address: Phone: 5- 7?c 070 7 Phone: Builder: Engineer: Pff44. 5,(Z0---9) Address: Phone: , S - J"7 %1/7 7 T Phone: ) % , 14 N/A YES NO 1. Required# of copies received I./ 2. Date of soils exam and percolation test not older than 2 years 1/4.--- 3. 4-5 ft of naturally occurringpervious material, above water table _/ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: .------- 5. Water line 10 ft from septic components Var.: j..< 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L/ 9. Leaching minimum 100 ft from wetlands Var.: ,...._.-- 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: `/ 11. Tank/leaching minimum 10 ft from property line Var.: L.----'-' 12. System meets all other setback requirements Var.: L---- 13. Uses adjustment for maximum high groundwater Var.: L.__-- 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: `,J 15. System not in top or subsoil(A,B horizons)or 5' removal y,/ 16. Proposed contours are suitable kt1 17. System meets slope requirements-min. 1/8", '/<"preferred 18. System meets breakout requirements PVC liner: Wall: `--i 19. Specified tee sizes are proper, gas baffle on outlet tee L.--- - 20. Sewage is under 10,000 gpd for parcel ,f 21.No garbage disposal 11/4_/ 22. System adequately sized for its intended use l_ '23. Minimum 6"stone or compacted below tank and dbox k.---• 24. Manhole covers within 6"of grade,pump chamber cover to grade L-/ - 25. Inspection port on plastic chambers/leach field L/ 26. Electrical permit for pump chamber/Separate meter for duplexes •✓' 27. Pump system-2" line,weep hole,check valve, tee in dbox,pump size 1/ 28. Septic tank/pump chamber to be factory waterproofed L/ 29. Vent provided if leaching below 3 feet, under driveway/parking ../ 30. Buoyancy calculations for tank/pump chamber L/ 31. Engineer to inspect and certify soils: wall: commercial: ,..., 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature �/ 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature �/ 35. Foundation footing min. 2 feet above adjusted ground water for new house __.......-V 36. Deed Restriction required max. #bedrooms: max. flow: gpd `-- . 37. Check area lots for groundwater/Label groundwater in Assessor's Map - - Plan reviewed by: 6/03/03