HomeMy WebLinkAbout5100 11 Corporation Rd Fire Dept Emails Regarding Site Plan ReviewFW: Revised Driveway Width (with new Fire Hydrant) - 11 Corporation Road
John Kenney <john@JWKesq.com>
Thu 11/16/2023 1:44 PM
To: Patrick Nickerson <patrick@jwkesq.com>
1 attachments (1 MB)
11 Corporation Road - Site Plan (REV 2)-SHT 6- EMERGENCY ACCESS.pdf;
John
Law Office of John W. Kenney
Suite 12
1550 Falmouth Road
Centerville, MA 02632
T: 508-771-9300
F: 508-775-6029
E-Mail: john@jwkesq.com
Click here to securely send me files.
Please Visit Our Website at www.jwkesq.com
CONFIDENTIALITY NOTICE: The information contained in this message and any attachment(s) is privileged and con idential information
intended only for the individual or entity named. If you are not the intended recipient, you are hereby noti ied that any disclosure,
dissemination or copying of this communication is strictly prohibited. If you have received this communication in error, please
immediately notify us by telephone. Thank you.
From: Sam Iamele <Siamele@jceng.org>
Sent: Thursday, November 16, 2023 1:40 PM
To: Bearse, Ma <MBearse@yarmouth.ma.us>; Edward Pesce <ed@pesceeng.com>
Cc: Rodrigo Epifanio <rodrigo@greenbirdlandscape.com>; Shelder Carvalho <shelder@greenbirdlandscape.com>; John Kenney
<john@JWKesq.com>
Subject: RE: Revised Driveway Width (with new Fire Hydrant) - 11 Corpora on Road
Hello Lt. Bearse,
Please see the a ached revised emergency access plan with the fire hydrant moved 3 feet back within the island. If all looks
good, we will proceed with finalizing this set of revisions.
Thank you,
Samuel J. Iamele, EIT, CSE
Project Engineer
JC Engineering Inc.
2854 Cranberry Highway
East Wareham, MA 02538
siamele@jceng.org
P: (508) 273-0377 x19
From: Bearse, Ma <MBearse@yarmouth.ma.us>
Sent: Thursday, November 16, 2023 11:53 AM
To: Edward Pesce <ed@pesceeng.com>
Cc: Rodrigo Epifanio <rodrigo@greenbirdlandscape.com>; Shelder Carvalho <shelder@greenbirdlandscape.com>; Sam Iamele
A en on!: This email originates outside of the organiza on. Do not open a achments or click links unless you are sure this
email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this
email.
<Siamele@jceng.org>; John Kenney <john@JWKesq.com>
Subject: RE: Revised Driveway Width (with new Fire Hydrant) - 11 Corpora on Road
Sorry for the delay, I was able to meet with Captain Huck and we discussed the proposed changes. The only comment at this
me would be to ask if the hydrant can be placed further back on that island area, to assure clearance when turning around. As
shown in the sweep path analysis, its close, and moving the hydrant shouldn’t be an issue we assume. As li le as 3 feet.
Let me know.
Lt. Ma Bearse
From: Edward Pesce <ed@pesceeng.com>
Sent: Thursday, November 16, 2023 11:20 AM
To: Bearse, Ma <MBearse@yarmouth.ma.us>
Cc: Rodrigo Epifanio <rodrigo@greenbirdlandscape.com>; Shelder Carvalho <shelder@greenbirdlandscape.com>; Sam Iamele
<Siamele@jceng.org>; John Kenney <john@JWKesq.com>
Subject: RE: Revised Driveway Width (with new Fire Hydrant) - 11 Corpora on Road
Hi LT Bearse,
Just circling back on this e-mail from last week to get your approval (or comments), so we can prepare plans for
submission to the ZBA.
Do these changes look good?
Please let me know – Thank you,
ED
_____________________________________________
Edward L. Pesce, P.E., LEED®AP
Pesce Engineering & Associates, Inc.
43 Porter Lane
West Dennis, MA 02670
(A Veteran Owned Small Business)
Cell: 508-333-7630
Ed@PesceEng.com
From: Edward Pesce
Sent: Thursday, November 9, 2023 11:46 AM
To: mbearse@yarmouth.ma.us
Cc: Rodrigo Epifanio <rodrigo@greenbirdlandscape.com>; Shelder Carvalho <shelder@greenbirdlandscape.com>; Sam Iamele
<Siamele@jceng.org>; John Kenney <john@JWKesq.com>
Subject: Revised Driveway Width (with new Fire Hydrant) - 11 Corpora on Road
Hello LT Bearse,
Since our Site Plan Review meeting last week, my clients & I have been discussing the idea of providing a new 6-
inch fire protection line for the new contractor building. This would allow them the flexibility to decide to add
sprinklers to the building (either now or later). I also remember you explaining to me that if we added a fire hydrant
near the building, that your Dept. could accept a 16-ft. wide access drive. This would better simplify the discussions
(and land requirements) with the neighbor to the north (Mr. Belanger).
So we have revised the site plan (attached) to show the following:
New 6-inch fire protection line to the building
New fire hydrant opposite the building in the parking island
Change in paved width of the access drive to 16 ft. wide
The access drive will also have 1 ft. crushed stone shoulders – providing an effective 18 ft. width
Finally, we have revised the Emergency Access Plan (also attached) to reflect the updated Pierce pumper truck
specs that you provided me at the meeting.
So, in summary, please review these plans, and let me know if this new design is acceptable. If this new design is
acceptable to you, I will include your approval comments in the application package we will submit to the ZBA.
Thanks very much,
ED
_____________________________________________
Edward L. Pesce, P.E., LEED®AP
Pesce Engineering & Associates, Inc.
43 Porter Lane
West Dennis, MA 02670
(A Veteran Owned Small Business)
Cell: 508-333-7630
Ed@PesceEng.com