Loading...
HomeMy WebLinkAboutReview Checklist I TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM /�3 LOT Z.6. Date of Subdivision Approval -d-%S Street /S. �%pse,_ ek i . Zone of Contribution: In Out >' Village l72J7 Commercial Residential >e Owner: a. C ./3 6f7// Installer P f �5 , 66 _ -- 36Z � Builder: /% /' ,l z' Engineer a ,� 362. - � _ - N/A YES NO 1. Required number of copies received. )0 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material. above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. X 5. Water availability letter from Water Department for new construction. X 6. Benchmark indicated and shown - NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. )C 9. Leaching a minimum of 20 feet from house and 10 feet from deck. X 10. Leaching a minimum of 100 feet from wetlands. i{ 11. Leaching a minimum of 150 feet from drinking,wells/25 feet from irrigation wells. x 12. System meets all other setback requirements. x 13. Uses adjustment for maximum high groundwater. )( ' 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. X 16. Proposed contours are suitable. y.< 17. System meets slope requirements - min. 1/8". 1/4" preferred. 1 8. System meets breakout requirements - peastone elevation carried out 15 feet minimum. , J.9. Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10.000 epd for parcel. 21. No garbage disposal. X 22. System adequately sized for its intended use. y( 23. Minimum 6" stone or mechanically compacted below the tank and d-box. X 24. Manhole covers within 6" of grade - septic tank and pump chamber. /' 25. Electrical permit for pump chamber. X 26. Pump system - 2" line, weep hole. check valve. sanitary in d-box, alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under drivewa or parking; 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and sianature. K 31. H2O loading when system subject to vehicular traffic. X 32. Title V application and fee signed by a licensed installer. X 33. Foundation looting 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: Iv