Loading...
HomeMy WebLinkAboutRequest for COC and photos 4.4.2024939 main street rt 6a yarmoulh port mass 02675 land court surveys srruclurai design site planning sewage system designs Inspections permits down Cape engineering, inc civil engineers d land surveyors March 29, 2024 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE83-2016 (122 Thacher Shore Road) Dear Commission Members, tel. (508) 3162-4541 fax (508) 362-9880 Daniel A, Oiala, PE., pLS. Arne H_ OJala PE., P.I.-S. Daniel E. Gonsalves, P.E., S.E. Craig J. Ferrari. E.I.T.. S.E. In February 2015, the Commission issued an Order of Conditions for the above -referenced site, for the construction of a barn, pool, acid other site work. A site visit was made to review site conditions relative to the Order. The proposed work was found to be constructed in substantial compliance with the approved plan and Order of Conditions. Some previous disturbance was noted West of the stone wal l which may be located on Town of Yarmouth Conservation land. This area is currently vegetated with fescues and looks to be reverting hack to a natural state. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We respectfully request the issuance of a Certificate of Compliance. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Page 1 of 1 Important: When filling out forms an the computer, use only the tab key to move your cursor - dD not use the return key. VI" Massachusetts Department of Environmental Protection DEP File Number_ Bureau of Resource Protection - Wetlands WPA Form 8A -, Request for Certificate of Compliance SR83-2016 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information 1 _ This request is being made by -- John & Susan Bassick Name 65 Marshall Street Mailing Address Paxton _ MA _ 01612 CitylTown State Zip Code 508-847-9101- Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the work 3 authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. John & Susan Bassick Applicant- ---- - ---- 2-27-2015 Dated The project site is located at: 122 Thacher Shore Road Street Address 131 Assessors MaplPlat Number SP83-2016 DEP File Number Yarmouthport City/Town 2.1 &1.1 Parcel/l.ot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County Certificate (if registered land) 5. This request is for certification that (check one): 28720 95 Rook Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). D the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpuiormea.doe •� rev 6f2904 Pege 1 of 2 Massachusetts Department of Environmental Protection DEP File Numbet: Ll Bureau of Resource Protection - Wetlands WPA Form $A — Request for Certificate of Compliance SE83-2016 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (coat.) fi. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Wearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass_gov/eea/agenciesimassdeplabout/contactslfnd-the-massdep-regional-offce- for-you r-city-or-town. htmi). Wp4f4rmGip,tloc reV. 5129114 Pago 2 or 1 NR 07 A .76 7 NY I V-79, A W If, Rd mm- v4' 11 XN 4 -,4z Sk A; 4, L-A 7 i I, Aq, 4i r Mrr Wle 10 7-: V .7 7,1��_1171 77.7 k k y � k �f' rp r 714 "A p 'ki iol :rLpc.. � -1 1 PA-4 Of rat 2 III Pill IRA kk IN& 6,4 00; kL Its 4f tip I V kv I I lk iL 01; T dlL 40 I F. r W4 -am V W- -