HomeMy WebLinkAboutRequest for COC 4.4.2024939 maid street rt 6a
yarmouth port
mass 02675
tend courl
surveys
structural design
site ptarning
sewage system
designs
Inspections
Permits
down cape engineering, inn
civil engineers & land surveyors
March 29, 2024
Yarmouth Conservation Commission
1) 46 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE83-1987 (.122 Thacher Shore road)
Dear Commission Members,
tel. (548) 362-4541
Fax (508) 362-9880
Daniel A. Olala, N.E., N.L.S.
Arne M. QJata PE., RLS_
Panlel E. Gonsalves, P.E., S.E.
Craig J. Ferrari, U.T.. S.E.
In February 2014, the Commission issued an Order of Conditions for the above -referenced
site, for the raze and replace of an existing single-family dwelling and re -construction of an
old windmill structure.
A site visit was made to review site conditions relative to the Order. The proposed work was
found to be constructed in substantial compliance with the approved plan and Order of
Conditions.
Some previous disturbance was noted West of the stone wall which may be located on 'Town
of Yarmouth Conservation land. This area is currently vegetated with fescues and looks to be
reverting back to a natural state.
This is to certify, to the best of my knowledge and belief, that the work was performed in
substantial compliance with the approved plan and Order of Conditions. We respectfully
request the issuance of a Certificate of Compliance.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, PLS
Drawn Cape Engineering, Inc.
Page 1 of 1
Important:
Important:
When filling out
forms on the
computer, use
only the lab
key to move
your cursor -
do not use the
return key.
' l
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE83-1987
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by 060
Town of Yarmouth Wetland By-law, Chapter 143 _
A. Project Information
--
1. This request Is being made by:
John & Susan Bassick
Name
65 Marshall Street
Mailing Address
Paxton
bityffown
508-847-9101
Phone Number
MA 01612
State Zip Code
2. This request is in reference to work regulated by a final Order of Conditions issued to:
John & Susan Bassick
Upon completion
of the work 3.
authorized in
an Order of
Conditions,, the
property owner
must request a
Certiricate of 4
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed_
Applicant
2-12-2014 S B83-1087 _
Dated DEP File Number
The project site is located at:
122 Thatcher Shore_ Road
Street Address
131
Assessors MaplPlat Number
Yarmouthpart
CitylTown
2.1
Par—,, Number
The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different]
Barnstable
County
Certificate (if registered
5. This request is for certification that (check one):
27983
Book
146
Page
[Z the work regulated by the above -referenced Order of Conditions has been satisfactorily completed_
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpeforni8a.doe ray, SQ9114 Pogo 1 or 2
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
Ll WPA Form 8A — Request for Certificate of Compliance SE83-1987
Massachusetts Wetlands Protection Act M.G.L. c. 131, §44 provided by DEP
Tow_ n of Yarmouth Wetland Bar -law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOG). If the project received an OOC from the Conservation Commission, submit
this request to that Commission_ If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http;llwww.mass,govleealacienciesimassdeg/about/contacts/find-the-massdep-regional-office
for-your-city_-or-town.html).
wpaformfie.doc -- rey. 5129N4 Pepr, 2 of 2
n
Al
'17
-W, -
I
� 11
Aa
T --V''
TAN
�
7 ot I I 'k
Iry
rN
Lo
ACV
IT -
IL
- r �-
: � ��• ' K�. �- � tea. � •i,
�' , ��.' �# � 1, t ! �� - � -- •�•. .-- � � � � � � . !
5I I�y
•� 1 1 F�t� •, �itl tit lk, F.' �.L f • i }I •i ` ' 1 �'. �, 1 f� • �, *� -t~ � ��'
tt.�
Jp-
• � yr �� �_ � � — � �+-�. ..• �Y�:� -- v G R
. -- Fm •`ice �� r _i. f', }� '�' , .7M vF ,1 •��7 Jil•!-•. L'�FY' -�'
- e: •+ � .,ram _�'' �. r ��';; ,
ALA
,,. ,- ��ti� ,r-r. - ' - � '. - � �.' - �*' � r _ •fir: -
�'4. - �� ',. r�� -•+ -ram" �- r _�a
■
9A/,-\
ILI
.tiffs• "w_.� Lam_ ``�. <.•
- Mr VV j .
�,,�.' .,.If lL ` i, 17�1��-•• �jp .. � .' !r.�yi'RssiK*�2y'�.,. Y5„.'1�� - ' -��
i ,�,y • ram..; r_ �';:�12.
'�
~fir.
�L��N•
.i
�,:r� ,: �4'•s�
F
"'►'tax
� 1"� � 1 .r�•�N II •.� . 1
." . mil, ! �`-- �L • _ F ' � � 1
1
•y DTI _ . F � -
" r•---
ji Ay
-• - � - •' . '� - ..a �;,-` _- � � � ■+mil vs.
K I t
w 4..
•� ,. ,�•. _ •� ••terry_. ,IT�. r ..;* . r. yti'� i= ��. .• , .