Loading...
HomeMy WebLinkAbout19 Pine Grove solarSCOPE OF WORK GENERAL NOTES LEGEND AND ABBREVIATIONS TABLE OF CONTENTS PAGE # DESCRIPTION • • ALL WORK SHALL COMPLY WITH MA 9TH ED. CMR 780 (2015 IRC/IBC/IEBC), SOLAR MODULES PV-1.0 COVER SHEET SYSTEM SIZE: 6935W DC, 5760W AC • NICIPAODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION S MODULES: (19) LONGI GREEN ENERGY TECHNOLOGY CO INSTRUCTIONS. E SERVICE ENTRANCE PV-2.0 SITE PLAN LTD: LR4-60HPH-365M • PHOTOVOLTAIC SYSTEM WILL COMPLY WITH NEC 2020. • INVERTERS: (1) DELTA ELECTRONICS: E6-TL-US F8-1 MAIN PANEL PV-3.0 LAYOUT • RACKING: RL UNIVERSAL, SPEEDSEAL TRACK ON COMP, PV-4.0 ELECTRICAL SEE DETAIL SNR-DC-00436 •ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH NEC 2020. • MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN SNR MOUNT PV-5.0 SIGNAGE PANEL WITH 100 AMP MAIN BREAKER TO BE REPLACED PHOTOVOLTAIC SYSTEM IS UNGROUNDED. NO CONDUCTORS ARE SOLIDLY SP SUB -PANEL SNR MOUNT & SKIRT WITH NEW 125 AMP MAIN PANEL WITH 100 AMP MAIN GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.35. BREAKER. • MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. LC PV LOAD CENTER • RAPID SHUTDOWN: (19) APSMART RSD-S-PLC ROOFTOP CHIMNEY MODULE LEVEL RAPID SHUTDOWN DEVICE • INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. • NEW 100A MAIN BREAKER DISCONNECT WITH 100A MAIN SM SUNRUN METER ENCLOSURE • RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. ATTIC VENT FLUSH ATTIC VENT • SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II PM DEDICATED PV METER PVC PIPE VENT vi MODULES, ARE CLASS A FIRE RATED. l� METAL PIPE VENT •RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL [INV INVERTER(S) �f (/ CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER NEC 690.12(1). T-VENT AC J •CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). IlEill AC DISCONNECT(S) SATELLITE DISH • ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. • 11.43 AMPS MODULE SHORT CIRCUIT CURRENT. 0 DC DISCONNECT(S) F7A FIRE SETBACKS • 17.85 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (A) & 690.8 (B)]. CB IQ COMBINER BOX HARDSCAPE • PV INSTALLATION COMPLIES WITH THE NEC 2020 ARTICLE 690.12(B)(2). CONTROLLED CONDUCTORS LOCATED INSIDE THE ARRAY BOUNDARY ARE F_ —1 INTERIOR EQUIPMENT — PL— PROPERTY LINE LIMITED TO 80 VOLTS WITHIN 30 SECOND OF A RAPID SHUTDOWN INITIATION L_ J SHOWN AS DASHED SCALE: NTS A AMPERE sunrun AC ALTERNATING CURRENT AFCI ARC FAULT CIRCUIT INTERRUPTER AZIM AZIMUTH VICINITY MAP COMP COMPOSITION #180120 DC DIRECT CURRENT (E) EXISTING 734 FOREST STREET #400, MARLBOROUGH, MA 01752 PHONE 888.657.6527 ESS ENERGY STORAGE SYSTEM FAX805.528.9701 EXT EXTERIOR INT INTERIOR CUSTOMER RESIDENCE: MAG MAGNETIC CLIVE MOORE MSP MAIN SERVICE PANEL 19 PINE GROVE RD, (N) NEW YARMOUTH, MA, 02664 NTS NOT TO SCALE OC ON CENTER TEL. (929) 282-8248 PRE-FAB PRE -FABRICATED APN: YARM-000041-000043 PSF POUNDS PER SQUARE FOOT PROJECT NUMBER: PV PHOTOVOLTAIC 221 R-019MOOR RSD RAPID SHUTDOWN DEVICE TL TRANSFORMERLESS DESIGNER: (415) 580-6920 ex3 TYP TYPICAL PRIYANKA KUMARI V VOLTS W WATTS SHEET REV NAME DATE COMMENTS OVER SHEET REV: Al 11/5/2022 PAGE PV-1.0