HomeMy WebLinkAbout12 Denise Ln solar012JOB HAZARD ANALYSIS
Crew leader to fill out all sections below, hold a pre -job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site Capture
Ladder Access
• Ladders must be inspected before each use.
• Extension ladders must be set up on a firm and level surface at
a 4-to-1 rise to run angle (or 75 degrees) and the top must be
secured to the structure. Extension style ladders placed on
uneven, loose or slippery surfaces must additionally have the
base firmly anchored or lashed so the base will not slip out.
• Extension ladders must be used with walk-through devices or
the ladder must extend 36" above the stepping off point.
• A -frame ladders must only be climbed with the ladder spreader
bars locked in the open position; A -frame ladders shall not be
climbed while in the closed position (ex, closed and used while
leaned against a structure).
• Additional notes:
Mobile Equipment
• Only Qualified operators will operate equipment; operators must
maintain a certification on their person for the equipment being
operated.
• Type(s) of mobile equipment (Type/Make/Model):
• Qualified operator(s):
Material Handling and Storage
• Materials will be staged/stored in a way that does not present a
hazard to client, personnel or public. Materials stored on the
roof will be physically protect from failing or sliding off.
Fall PrntPrtinn
• A site -specific plan for fall prevention and protection is required
prior to starting work and must remain onsite at all times until
work is complete; a fall rescue plan must be outlined and
discussed among the crew prior to work start.
• First -person -Up (FPU) must install their anchor and connect
before any other task, including installing other anchors. The
Last -Person -Down (LPD) must be the only person on a roof
uninstalling fall protection.
• FPCP (name and title):
• FPU and LPD (name and title):
Electrical Safety
• The Electrical Qualified Person (EQP) is required onsite to
perform electrical work.
• All electrical work will be performed with equipment in an
electrically safe condition (de -energized) unless approval has
been granted prior to work.
• Service drops and overhead electrical hazards will be
indentified and protected from contact, as neccessa
• EQP (name and tile):
Public Protection
• The safety of the Client and the Public must be maintained at all
times.
• The Client and the Public shall be prevented from entoring the
work zone through the use of barriers and/or signage, as
required.
• Company, Client and Public property shall be protect from
falling objects.
• Pets (including dogs) shall be secured by their owners prior to
work start.
• The client should not leave pets, family members, or others in
the charge or care of Employees, Contractors, or Temporary
Workers.
• Crew leader responsible for communication with the client:
• Client and public is excluded from work area by barricades (N/A,
Yes, No):
Training and Pre -Job Safety Briefing
• All employees onsite shall be made aware of the specific
hazards of this project and review this HJA during a pre -job
briefing, and their signature indicates awareness of site
conditions and the plan to eliminate any hazards identified prior
to and during the project.
• Crew leader (name/title):
• Crew member (name/title):
• Crew member (name/title):
• Crew member (name/title):
• Crew member (name/title):
• Crew member (name/title):
Airborne Contaminants:
Asbestos -containing (Transite) piping (ACP) - Do not disturb
(move, drill, cut fracture, etc.)
Asbestos -containing thermal insulation (ACI) and
Asbestos -containing duct wrapping (ACW) - do not disturb, no
attic or crawlspace access is allowed if work to be performed
could cause exposure to personnel, client or public.
• If yes, list specific tasks and protection in place:
Weather and Environment
• The site supervisor shall forecast the weather conditions at the
job site, prior to crew arrival, in order to mitigate any hazards
associated with inclement weather (heat, cold, wind, rain, etc.)
• The site supervisor will utilized a portable wind meter
(anemometer) to verify actual onsite wind conditions, by
checking at the ground and on any elevated work surface (ex,
rooftop) prior to work start, at midday and prior to solar panel
staging on a roof.
• Elevated work involving the moving or maneuvering of solar
panels shall cease at 25mph (sustained wind) until wind
subsides.
• Forecasted weather maximum temp (degrees F):
Heat Related Illness Prevention
• Employees shall have access to potable drinking water that is
fresh, pure, and suitably cool. The water shall be located as
close as practicable to the areas where employees are working.
Water shall be supplied in sufficient quantity at the beginning of
the work shift to provide at least one quart per employee per
hour for drinking for the entire shift. Employees may begin the
shift with smaller quantities of water if they identify the location
and have effective means for replenishment during the shift to
allow employees to drink on quart or more per hour. The
frequent drinking of water shall be encouraged.
• Shade shall be present when temperature exceeds 80 degrees
Fahrenheit. When the outdoor temperature in the work exceeds
80 degrees Fahrenheit, employees shall have and maintain one
or more areas with shade at all times.
• New employees must be acclimatized. New employees will be
monitored by their Crew Leader (site supervisor) for the first two
(2) weeks of employment or longer when necessary.
• Employees will be allowed and encouraged to implement
scheduled breaks during each shift. Employees must take
cool -down breaks in the shade any time they feel the need to do
so to protect them from overheating. Supervisors are
REQUIRED to allow employees any break period they need
during high heat conditions.
• Cool Vests are encouraged for all employees at all times during
periods of high heat.
• Identify the location of the closet Occupational/Industrial Clinic
or Hospital in case a crew member becomes ill.
What is the specific plan to provide and replenish sufficient water for
all employees on site?
• If offsite replenish is necessary, where will you go to replenish
water (location/address):
• Who will replenish the drinking water (name):
Restroom facilities
• Employees shall have access to restroom facilities with
hand -washing stations. Use of onsite restroom is at the client's
discretion (location is annotated below). If client does not give
permission, location of suitable restroom facilities with
hand -washing stations offsite will be provided. The onsite
supervisor will identify location and make arrangements to
ensure all employees have access at any point.
• Restroom facilities will be circle one): Onsite - Offsite
• If Offsite, add location name and address:
Incident Reporting Procedure
• Contact your Site Supervisor
Name:
Phone:
• Contact your Manager
Name:
Phone:
• Contact your Site Supervisor
Name:
Phone:
With: Your full name, phone number, office location, brief description
of what happen and when.
NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE
(add as many as necessary by using additional sheets)
Define the Hazard:
Method/steps to
prevent incident:
Define the Hazard:
Method/steps to
prevent incident:
Define the Hazard:
Method/steps to
prevent incident:
Define the Hazard:
Method/steps to
prevent incident:
4iCONTRACTOR
+�,`
FFREEDOMFOREVERMASSACHUSETTS
ELECTRICAL CONTRACTOR NO:
CLIENT:
P I E RRE M E RH I
12 DENISE LANE,
SOUTH YARMOUTH, MA 02664
REVISIONS:
DATE:
14/11/2022
TITLE:
PLAN
SHEET:
PV-10
HOME IMPROVEMENT CONTRACTOR
198080; BUSINESS ELECTRICAL
LICENSE 902-EL-A1;
CONSTRUCTION SUPERVISOR
CS-111662; MASTER
ELECTRICIAN1136MR
MATTHEW MARKHAMTREAT
�,f� -�-.,
t
DESCRIPTION
DATE
REVISION
DESIGNLICENSE
BY:
APSAFETY
PAINE DR., TALTON, MA 02780
Tel: (800) 385-1075
JOB NO.:
27gg77