HomeMy WebLinkAboutCertification Letter 11/15/22 BARUN CORP
November 15,2022
RE: CERTIFICATION LETTER
Project Address: PIERRE MERHI RESIDENCE
12 DENISE LANE
SOUTH YARMOUTH,MA 02664
Design Criteria:
-Applicable Codes=2015 IBC/IEBC W/(780 CMR)9th Edition,2015 IRC W/(780 CMR)9th Edition,ASCE 7-10 and 2015 NDS
-Risk Category=II
-Wind Speed=140 mph,Exposure Category C,Partially/Fully Enclosed Method
-Ground Snow Load=30 psf
-Roof 1:2 x 8 @ 24"OC,Roof DL=11 psf,Roof LL/SL=25 psf(Non-PV),Roof LL/SL=13.3 psf(PV)
-Roof 2:2 x 8 @ 24"OC,Roof DL=11 psf,Roof LL/SL=25 psf(Non-PV),Roof LL/SL=24.6 psf(PV)
To Whom It May Concern,
A job site survey of the existing framing system of the address indicated above was performed.All structural evaluation is based on the site
inspection observations and the design criteria listed above.
Existing roof structural framing has been reviewed for additional loading due to installation of Solar PV System on the roof.The structural
review applies to the sections of roof that is directly supporting the Solar PV System.
Based on this evaluation,I certify that the alteration to the existing structure by installation of the Solar PV System meets the prescriptive
compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above.
Additionally,the Solar PV System assembly(including attachment hardware)has been reviewed to be in accordance with the
manufacturer's specifications and to meet and/or exceed the requirements set forth by the referenced codes.
Sincerely,
� '�s Digitally signed
o? • yG Avial by Avial
i LUMAGUI Lumagui
CIVIL L u m a g u i Date:2022.1,.,5
No, 57691
09:03:57-05'00'
bNAttw'
STRUCTURAL ONLY
Barun Corp j Design and Engineering 1610.202.4506 I chrisk@baruncorp.com I www.baruncorp corn 1/7
BARU N CORP RESULTS SUMMARY
PIERRE MERHI RESIDENCE,12 DENISE LANE,SOUTH YARMOUTH,MA 02664
MOUNTING PLANE STRUCTURAL EVALUATION
MOUNTING PLANE ROOF PITCH RESULT GOVERNING ANALYSIS
Roof 1 38° OK IEBC IMPACT CHECK
Roof 2 11° OK MEMBER ANALYSIS
STANDOFF HARDWARE EVALUATION FOR WIND UPLIFT
MOUNTING PLANE WIND UPLIFT DCR
Roof 1 69.1%
Roof 2 98.8%
Limits of Scope of Work and Liability:
The existing structure has been reviewed based on the assumption that it has been originally designed and constructed per appropriate
codes. The structural analysis of the subject property is based on the provided site survey data. The calculations produced for this
structure's assessment are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were
( made according to generally recognized structural analysis standards and procedures. All PV modules, racking and attachment
components shall be designed and installed per manufacturer's approved guidelines and specifications. These plans are not stamped for
water leakage or existing damage to the structural component that was not accessed during the site survey.Prior to commencement of
work,the PV system installer should verify that the existing roof and connections are in suitable condition and inspect framing noted on
the certification letter and inform the Engineer of Record of any discrepancies prior to installation. The installer should also check for any
damages such as water damage, cracked framing, etc. and inform the Engineer of Record of existing deficiencies which are unknown
and/or were not observable during the time of survey and have not been included in this scope of work.Any change in the scope of the
work shall not be accepted unless such change,addition,or deletion is approved in advance and in writing by the Engineer of Record.
Barun Corp I Design and Engineering (610.202.4506 I chrisk@baruncorp.com i www.baruncorp.com 2/7
BARUN CORP LOAD CALCULATION
Roof 1
PIERRE MERHI RESIDENCE,12 DENISE LANE,SOUTH YARMOUTH,MA 02664
PV PANELS DEAD LOAD(PV-DL)
PV Panels Weight =2.50 psf
Hardware Assembly Weight =0.50 psf
Total PV Panels Weight PV-DL=3.00 psf
ROOF DEAD LOAD(R-DL)
Existing Roofing Material Weight Composite Shingle Roof 1 Layer(s) =2.50 psf
Underlayment Weight =0.50 psf
Plywood/OSB Sheathing Weight =1.50 psf
Framing Weight 2 x 8 @ 24 in.O.C. =1.51 psf
Vaulted Ceiling Weight =3.00 psf
Miscellaneous =1.50 psf
Total Roof Dead Load R-DL=10.50 psf
REDUCED ROOF LIVE LOAD(Lr)
Roof Live Load Lo=20.00 psf
Member Tributary Area At<200 ft'
Roof 1 Pitch 38*or 10/12
Tributary Area Reduction Factor R1=1.00
Roof Slope Reduction Factor R2=0.73
Reduced Roof Live Load,Lr=Lo(R1)(R2) Lr=14.50 psf
SNOW LOAD
Ground Snow Load pg=30.00 psf
Effective Roof Slope 38.
Snow Importance Factor Is=1.00
Snow Exposure Factor Ce=1.00
Snow Thermal Factor Ct=1.10
Minimum Flat Roof Snow Load pf-min=25.00 psf
Flat Roof Snow Load pf=25.00 psf
SLOPED ROOF SNOW LOAD ON ROOF(Non-Slippery Surfaces)
Roof Slope Factor Cs-roof=0.98
Sloped Roof Snow Load on Roof ps-roof=24.60 psf
SLOPED ROOF SNOW LOAD ON PV PANELS(Unobstructed Slippery Surfaces)
Roof Slope Factor Cs-PV=0.53
Sloped Roof Snow Load on PV Panels ps-PV=13.30 psf
Barun Corp I Design and Engineering 1 610.202.4506 chnsk@baruncorp.corn I www.baruncorp.corn 3/7
BARU N CORP IEBC IMPACT CHECK
Roof 1
PIERRE MERHI RESIDENCE,12 DENISE LANE,SOUTH YARMOUTH,MA 02664
Roof Dead Load(DL)= 10.50 13.50 psf
Roof Live Load(Lr)= 14.50 0.00 psf
Roof Snow Load(SL)= 24.60 13.30 psf
(DL+Lr)/Cd= 20.00 15.00 psf
(DL+SL)/Cd= 30.52 23.30 psf
Maximum Gravity Load= 30.52 23.30 psf
Load Increase(%)= -23.65% OK
The requirements of section 807.4 of 2015 IEBC are met and the structure is permitted to remain unaltered.
iI
Barun Corp I Design and Engineering 1610.202.4506 I chrisk@baruncorp.com i www.baruncorp.com 4/7
BARUN CORP WIND UPLIFT CALCULATION
Roof 1
PIERRE MERHI RESIDENCE,12 DENISE LANE,SOUTH YARMOUTH,MA 02664
SITE INFORMATION
Ultimate Wind Speed= 140.00 mph Roof Pitch= 38°
Risk Category= II Roof Type= Gable
Exposure Category= C Velocity Pressure Exposure Coefficient,Kz= 0.95
Mean Roof Height= 25.00 ft Topographic Factor,Kzt= 1.00
Solar Array Dead Load= 3.00 psf Wind Directionality Factor,Kd= 0.85
a= 3.00 ft Ground Elevation Factor,Ke= 1.00
DESIGN CALCULATIONS
Wind Velocity Pressure,qh= 40.32 psf (0.00256*Kz*Kzt*Kd*Ke*(VA2))
Solar Array Pressure Equalization Factor,ya= 0.60
Allowable Load=I 982.50 lbs IS.Pine,5/16"Lag Screw x 1,2.5"Embedment
Array Edge Factor,yE= 1.50 Exposed Condition
Max.X-Spacing(Zone 1-2r)= 4.00 ft Effective Wind Area
Max.Y-Spacing(Zone 1-2r)= 3.40 ft 13.60 ft2
Max.X-Spacing(Zone 2n&3r)= 4.00 ft Effective Wind Area
Max.Y-Spacing(Zone 2n&3r)= 3.40 ft 13.60 ftz
Max.X-Spacing(Zone 3e)= 4.00 ft Effective Wind Area
Max.Y-Spacing(Zone 3e)= 3.40 ft 13.60 ft2
ROOF ZONE GCp(-)UPLIFT UPLIFT PRESSURE PULLOUT FORCE
1-2r -1.67 -34.87 psf 474.17 lbs
2n&3r -1.90 -39.89 psf 542.54 lbs
3e -2.36 -49.93 psf 679.04 lbs
NOTE:
•Wind calculation is based on ASCE 7-16,29.4-C&C,LC#7:0.6DL+0.6WL is used.
Barun Corp I Design and Engineering 1610.202.4506 1 chrisk@baruncorp.com I www.baruncorp.com 5/7
BARU N CORP LOAD CALCULATION
Roof 2
PIERRE MERHI RESIDENCE,12 DENISE LANE,SOUTH YARMOUTH,MA 02664
PV PANELS DEAD LOAD(PV-DL)
PV Panels Weight = 2.50 psf
Hardware Assembly Weight =0.50 psf
Total PV Panels Weight PV-DL=3.00 psf
ROOF DEAD LOAD(R-DL)
Existing Roofing Material Weight Composite Shingle Roof 1 Layer(s) = 2.50 psf
Underlayment Weight =0.50 psf
Plywood/O5B Sheathing Weight = 1.50 psf
Framing Weight 2 x 8 @ 24 in.O.C. = 1.51 psf
Vaulted Ceiling Weight =3.00 psf
Miscellaneous = 1.50 psf
Total Roof Dead Load R-DL=10.50 psf
REDUCED ROOF LIVE LOAD(Lr)
Roof Live Load Lo= 20.00 psf
Member Tributary Area At< 200 ft2
Roof 2 Pitch 11°or 3/12
Tributary Area Reduction Factor R1= 1.00
Roof Slope Reduction Factor R2= 1.00
Reduced Roof Live Load,Lr=Lo(R1)(R2) Lr= 20.00 psf
SNOW LOAD
Ground Snow Load pg= 30.00 psf
Effective Roof Slope 11°
Snow Importance Factor Is= 1.00
Snow Exposure Factor Ce= 1.00
Snow Thermal Factor Ct= 1.10
Minimum Flat Roof Snow Load pf-min= 25.00 psf
Flat Roof Snow Load pf= 25.00 psf
SLOPED ROOF SNOW LOAD ON ROOF(Non-Slippery Surfaces)
Roof Slope Factor Cs-roof= 1.00
Sloped Roof Snow Load on Roof ps-roof= 25.00 psf
SLOPED ROOF SNOW LOAD ON PV PANELS(Unobstructed Slippery Surfaces)
Roof Slope Factor Cs-PV= 0.98
Sloped Roof Snow Load on PV Panels ps-PV= 24.60 psf
Barun Corp Design and Engineering 610 202 4506 I chrisk@baruncorp.com I www.baruncorp.com 6/7
COMPANY PROJECT
1 WoodWorks -'
Nov. 15, 2022 18:31 Roof 2
Design Check Calculation Sheet
WoodWorks Sizer 2019 (Update 2)
Loads:
Load 1 Type Distribution Pat- Location [ ft] Magnitude Unit
tern Start End Start End
DL Dead Full Area No 10 . 50 (24 . 0" ) psf
DL-PV Dead Partial Area No 1 . 50 8 . 00 3 . 00 (24 . 0" ) psf
SL-PV Snow Partial Area No 1 . 50 8 . 00 24 . 60 (24 . 0" ) psf
SL-RF1 Snow Partial Area No 0 . 00 1 . 50 25 . 00 (24 . 0" ) psf
SL-RF Snow Partial Area No 8 . 00 12 . 35 25 . 00 (24 . 0" ) psf
Maximum Reactions (Ibs), Bearing Capacities (Ibs) and Bearing Lengths (in) :
—--_ 12.52'
1' 12.293'
Unfactored:
Dead 169 134
Snow 331 281
Factored:
Total 500 415
Bearing :
F' theta 433 433
Capacity
Joist 568 650
Support 586 937
Des ratio
Joist 0 . 88 0 . 64
Support 0 . 85 0 . 44
Load comb #2 #2
Length 0 . 50* 1 . 00
Min req ' d 0 . 44 0 . 64
Cb 1 . 75 1 . 00
Cb min 1 . 75 1 . 00
Cb support 1 . 25 1 . 00
Fcp sup 625 625
*Minimum bearing length setting used: 1/2" for interior supports
Roof 2
Lumber-soft, S-P-F, No.1/No.2, 2x8 (1-1/2"x7-1/4")
Supports: All - Timber-soft Beam, D.Fir-L No.2
Roof joist spaced at 24.0" c/c; Total length: 12.63'; Clear span(horz): 1 .0', 11 .25'; Volume = 1 .0 cu.ft.; Pitch: 3/12
Lateral support: top = continuous, bottom = at supports: Repetitive factor: applied where permitted (refer to online help);
This section PASSES the design code check.
WoodWorks® Sizer SOFTWARE FOR WOOD DESIGN
Roof 2 WoodWorks®Sizer 2019 (Update 2) Page 2
Analysis vs. Allowable Stress and Deflection using NDS 2018 :
Criterion Analysis Value Design Value Unit Analysis/Design
Shear fv = 52 Fv' = 155 psi fv/Fv' = 0.34
Bending(+) fb = 1076 Fb' = 1389 psi fb/Fb' = 0.77
Bending(-) fb = 33 Fb' = 809 psi fb/Fb' = 0.04
Live Defl'n 0.27 = L/502 0.57 = L/240 in 0.48
Total Defl'n 0.49 = L/283 0.76 = L/180 in 0.64
Additional Data:
FACTORS: F/E(psi) CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC#
Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2
Fb'+ 875 1.15 1.00 1.00 1.000 1.200 - 1.15 1.00 1.00 - 2
Fb'- 875 1.15 1.00 1.00 0.582 1.200 - 1.15 1.00 1.00 - 2
Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - -
E' 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 2
Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 2
CRITICAL LOAD COMBINATIONS:
Shear : LC #2 = D + S
Bending(+) : LC #2 = D + S
Bending(-) : LC #2 = D + S
Deflection: LC #2 = D + S (live)
LC #2 = D + S (total)
Bearing : Support 1 - LC #2 = D + S
Support 2 - LC #2 = D + S
D=dead S=snow
All LC's are listed in the Analysis output
Load combinations:
CALCULATIONS:
V max = 423, V design = 379 lbs; M(+) = 1178 lbs-ft; M(-) = 36 lbs-ft
EIy = 66.69 lb-in^2
"Live" deflection is due to all non-dead loads (live, wind, snow...)
Total deflection = 1.5 dead + "live"
Bearing: Allowable bearing at an angle F'theta calculated for each support
as per NDS 3.10.3
Lateral stability(-) : Lu = 11.44' Le = 18.31' RB = 26.6; Lu based on full span
Design Notes:
1.Analysis and design are in accordance with the ICC International Building Code(IBC 2018) and the National Design
Specification (NDS 2018), using Allowable Stress Design (ASD). Design values are from the NDS Supplement.
2. Please verify that the default deflection limits are appropriate for your application.
3. Continuous or Cantilevered Beams: NDS Clause 4.2.5.5 requires that normal grading provisions be extended to the
middle 2/3 of 2 span beams and to the full length of cantilevers and other spans.
4. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1.
5. SLOPED BEAMS: level bearing is required for all sloped beams.
6. The critical deflection value has been determined using maximum back-span deflection. Cantilever deflections do not
govern design.
BARUN CORP WIND UPLIFT CALCULATION
Roof 2
PIERRE MERHI RESIDENCE,12 DENISE LANE,SOUTH YARMOUTH,MA 02664
SITE INFORMATION
Ultimate Wind Speed= 140.00 mph Roof Pitch= 11'
Risk Category= 11 Roof Type= Gable
Exposure Category= C Velocity Pressure Exposure Coefficient,Kz= 0.95
Mean Roof Height 25.00 ft Topographic Factor,Kzt= 1.00
Solar Array Dead Load= 3.00 psf Wind Directionality Factor,Kd= 0.85
a= 3.00 ft Ground Elevation Factor,Ke= 1.00
DESIGN CALCULATIONS
Wind Velocity Pressure,qh= 40.32 psf (0.00256•Kz•Kzt•Kd•Ke•(V02))
Solar Array Pressure Equalization Factor,ya= 0.60
Allowable Load=I 982.50 lbs IS.Pine,5/16"Lag Screw x 1,2.5"Embedment
Array Edge Factor,yE= 1.50 Exposed Condition
Max.X-Spacing(Zone 1&2e)= 4.00 ft Effective Wind Area
Max.Y-Spacing(Zone1&2e)= 3.40 ft 13.60 fit'
Max.X-Spacing(Zone 2n-3e)= 4.00 ft Effective Wind Area
Max.V.Spacing(Zone 2n-3e)= 3.40 ft 13.60 fit'
Max.X-Spacing(Zone 3r)= 4.00 ft Effective Wind Area
Max.V-Spacing(Zone 3r)= 3.40 ft 13.60 ft'
ROOF ZONE GCp(-(UPLIFT UPLIFT PRESSURE PULLOUT FORCE
1&2e -2.00 -41.78 psf 568.19 lbs
2n-3e -2.81 -59.39 psf 807.73 lbs
3r -3.36 -71.38 psf 970.79 lbs
NOTE:
•Wind calculation is based on ASCE 7-16,29.4-C&C,LC 87:0.6DL 0.6WL is used.
Barun Corp I Design and Engineering 610.202 4506 I chrisk@baruncorp.com www.baruncorp.corn 7/7