Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out_ Acreage /„c f'11�0 A_, Commercial: Residential: Street: (.(i !J1' Village: Floor Plan: r �''/ # Bedrooms: Owner: Installer: Eli C_4 'V4O7S Address: Phone: Phone: Builder: Engineer: cba/S'Y.GG(, .,v Address: Phone: ��� Phone: N/A YES NO 1.Required# of copies received 2. Date of soils exam and percolation test not older than 2 years - 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓ 15. System not in top or subsoil(A,B horizons) or 5' removal v 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred ✓� 18. System meets breakout requirements PVC liner: Wall: ✓ 19. Specified tee sizes are proper, gas baffle on outlet tee ✓ 20. Sewage is under 10,000 gpd for parcel -_ 21. No garbage disposal 22. System adequately sized for its intended use V 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade, pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27. Pump system-2" line,weep hole,check valve, tee in dbox,pump size J 28. Septic tank/pump chamber to be factory waterproofed V 29. Vent provided if leaching below 3 feet, under driveway/parking ✓ 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: ✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature v" 33. H-20 loading is subject to vehicular traffic, groundwater v 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 47; 36. Deed Restriction required max. #bedrooms: max. flow: gpd ✓ 37. Check area lots for groundwater/Label gr u d a in essor's Map Plan reviewed by: {I 6/03/03