HomeMy WebLinkAboutNOI 4.25.2024WRS Engineering LLC
67 Stetson Street
Hyannis, MA 02601
508-776-0956 royokurowski@gmail.com
April 10, 2024
By Hand Delivery
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Proposed Pier Dock and Float 60 Grand view Drive
MARTEL DONNA JEAN TRUST/THE DJM-MJD REALTY TRUST 579 BUCK ISLAND RD UNIT 156
60 GRAND VIEW DRIVE
WEST YARMOUTH MA 02673
Map 191 Parcel 76
On behalf of our client, DJM Realty Trust, we are submitting 1 original and 7 copies of a proposed package for
your review, including a Notice of Intent application filing package and administrative checklist.
Please schedule this for the May 16, 2024 public hearing. If you have any questions or require
additional information, please give our office a call. Thank you.
Sincerely,
WRS Engineering LLC
Roy E. Okurowski P.E.
Yarmouth Conservation Commission • 1146 Route 28 South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288
Rev 03/2024 Page 1 of 2
Administrative Checklist
Notice of Intent
General Information:
All filings must be made on Town of Yarmouth forms. The filing deadline is two weeks prior to the next
scheduled Conservation Commission meeting for new applications. Failure to follow this Checklist shall
result in an Administratively Incomplete Application and will not be advertised for a Public Hearing. Refer to
the meeting schedule. Contact the Conservation Office if you need assistance.
Submitting an Application:
Does the property have any outstanding/expired Orders of Conditions? If so, please file a Request
for Certificate of Compliance for each outstanding/expired Order, as the Commission may not issue a
new Order until any outstanding/expired Orders have been closed and recorded. (*see page 2)
Hardcopy filing dropped off or mailed to the Conservation Office including:
1 Administrative Checklist
1 complete NOI application WPA form 3 with original signatures. Typed signatures will not be accepted.
Detailed narrative of the project including existing & proposed conditions, construction sequence, type of
equipment, staging locations, drainage and stormwater, erosion controls, invasive species management
and alternative analysis. The narrative shall include how the project meets performance standards per
310 CMR 10.0 & TOY Wetland Regulations, delineation sheets (if BVW or vegetated wetlands are
present) or other resource area calculations, and supporting information.
1 100’ radius map, current abutters list identifying the property owners who are to be notified per 310
CMR 10.00 and abutter notification form. Abutters list must be certified by the Town Assessor’s office.
The Assessor’s office requires 7 days advance notice. All abutters must be notified via certified mail.
Certified Mail Receipts (PS Form 3800) for all abutters. Green cards to be submitted at the hearing.
1 original and 6 copies of the plan, folded separately, right side out with title and project address visible.
All plans shall reference NAVD1988 unless otherwise noted. See plan requirements
Yarmouth’s share of State filing fee: Separate check made payable to “Town of Yarmouth”
(refer to NOI Wetland Fee Transmittal Form)
By-law filing fee: Separate check made payable to “Town of Yarmouth”
Legal ad fee: Separate check made payable to “Town of Yarmouth”
Please list project property’s street address on checks. Refer to Fee Schedule
DEP share of the fee (refer to NOI form) shall be sent to: Dept. of Environmental Protection
Box 4062
Boston, MA 02211
CONSERVATION
OFFICE
Yarmouth Conservation Commission • 1146 Route 28 South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288
Rev 03/2024 Page 2 of 2
DEP Submittal and Digital filing
If you are filing with MassDEP using eDEP, please include a copy of the submittal confirmation with your
application.
If not filing via eDEP, a PDF of your application, plan, and all other supporting information must be sent
VIA EMAIL the same day to DEP, Southeast Region at SERO_NOI@mass.gov with the subject line in
the email per DEP’s request listed as “YARMOUTH - NOI - Street Address - Applicant Name” and
copied to bdirienzo@yarmouth.ma.us and fkelley@yarmouth.ma.us. We must receive a copy of this
email with the application as proof that it has been submitted to DEP.
Initial below
I CERTIFY that all on-site requirements will be completed by noon on the Friday prior to the hearing
date. All proposed structures must be staked, and all relevant resource areas and buffer zones must be
staked or flagged.
Please consult the Yarmouth Wetland Regulations, page 17. Without proper staking your project may be
deemed incomplete and be continued to the next hearing date.
If Applicable
Certified Mail Receipt for Massachusetts Natural Heritage and Endangered Species Program
Certified Mail Receipt for Massachusetts Division of Marine Fisheries. If filing via email, CC
bdirienzo@yarmouth.ma.us and fkelley@yarmouth.ma.us
Waterway’s jurisdiction – Any coastal projects such as, but not limited to, docks, piers, bulkheads,
revetments, dredging and boardwalks shall require submittal of all Notice of Intent, plans and
supplemental information to the Town of Yarmouth Waterways/Shellfish Committee via the Natural
Resources office by certified mail or hand delivery. The applicant or his/her representative must provide
the Conservation office with proof that this has been done or the filing will not be accepted.
Other Requirements
o Does the proposed project meet the applicable regulations of the Town of Yarmouth Zoning bylaws? Do
you need to file with the Yarmouth Board of Appeals? If so, you must file with ZBA after conservation
permitting is completed.
o If a vacant lot, have you completed and received a determination for the Building Department for a lot
inquiry form?
*To view all Conservation files/permits for the property address online, go to www.yarmouth.ma.us/LF
REO
Massachusetts Department of Environmental Protection
eDEP Transaction Copy
Here is the file you requested for your records.
To retain a copy of this file you must save and/or print.
Username:
Transaction ID:
Document:
Size of File:
Status of Transaction:
Date and Time Created:
Note: This file only includes forms that were part of your
transaction as of the date and time indicated above. If you need
a more current copy of your transaction, return to eDEP and
select to “Download a Copy” from the Current Submittals page.
1707085
4/20/2024:12:30:04 PM
273.58K
WRSPERMITTING
WPA Form 3 - NOI
In Process
a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR
10.05(6)(k)(q) and check if:
A.General Information
1. Project Location:
a. Street Address 60 GRAND VIEW DRIVE
b. City/Town YARMOUTH c. Zip Code 02664
d. Latitude 41.68067N e. Longitude 70.16497W
f. Map/Plat #91/176 g.Parcel/Lot #81/0060
2. Applicant:
Individual Organization
a. First Name GRIMOALDO b.Last Name RUSCITO
c. Organization
d. Mailing Address 600 RANDOLPH ST.
e. City/Town CANTON f. State MA g. Zip Code 02021
h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com
3.Property Owner:
more than one owner
a. First Name DONNA b. Last Name MARTEL TR
c. Organization DJM/MJD REALTY TRUST
d. Mailing Address 579 BUCK ISLAND ROAD
e. City/Town YARMOUTH f.State MA g. Zip Code 02673
h. Phone Number i. Fax j.Email
4.Representative:
a. First Name ROY b. Last Name OKUROWSKI
c. Organization WRS ENGINEERING LLC
d. Mailing Address 67 STETSON ST.
e. City/Town HYANNIS f. State MA g. Zip Code 02601
h.Phone Number 5087760956 i.Fax j.Email royokurowski@gmail.com
5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):
a.Total Fee Paid 540.00 b.State Fee Paid 257.50 c.City/Town Fee Paid 282.50
6.General Project Description:
CONSTRUCTION OF NEW PIER, RAMP AND FLOAT ON BASS RIVER
7a.Project Type:
1. Single Family Home 2. Residential Subdivision
3.Limited Project Driveway Crossing 4.Commercial/Industrial
5.Dock/Pier 6.Utilities
7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)
9.Transportation 10.Other
7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310
CMR 10.53 (inland)?
1.Yes No If yes, describe which limited project applies to this project:
2. Limited Project
8.Property recorded at the Registry of Deeds for:
a.County:b.Certificate:c.Book:d.Page:
BARNSTABLE C229602
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1.Buffer Zone & Resource Area Impacts (temporary & permanent):
This is a Buffer Zone only project Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,
Inland Bank, or Coastal Resource Area.
2.Inland Resource Areas: (See 310 CMR 10.54 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a.Bank
1. linear feet 2. linear feet
b.Bordering Vegetated Wetland
1. square feet 2. square feet
c.Land under Waterbodies and Waterways
1. Square feet 2. square feet
3. cubic yards dredged
d.Bordering Land Subject to Flooding
1. square feet 2. square feet
3. cubic feet of flood storage lost 4. cubic feet replaced
e.Isolated Land Subject to Flooding
1. square feet
2. cubic feet of flood storage lost 3. cubic feet replaced
f.Riverfront Area
1. Name of Waterway (if any)
2. Width of Riverfront Area (check one)25 ft. Designated Densely Developed Areas only
100 ft. New agricultural projects only
200 ft. All other projects
3. Total area of Riverfront Area on the site of the proposed project
square feet
4. Proposed Alteration of the Riverfront Area:
a. total square feet b. square feet within 100 ft.c. square feet between 100 ft.
and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI?Yes No
6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No
3.Coastal Resource Areas: (See 310 CMR 10.25 10.35)
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a.Designated Port Areas Indicate size under Land under the ocean below,
b.Land Under the Ocean 7
1. square feet
2. cubic yards dredged
c.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, below
d.Coastal Beaches 2
1. square feet 2. cubic yards beach nourishment
e.Coastal Dunes
1. square feet 2. cubic yards dune nourishment
f.Coastal Banks 2
1. linear feet
g.Rocky Intertidal Shores
1. square feet
h.Salt Marshes
1. square feet 2. sq ft restoration, rehab, crea.
i.Land Under Salt Ponds
1. square feet
2. cubic yards dredged
j.Land Containing Shellfish 7
1. square feet
k.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land
Under Waterbodies and Waterways, above
1. cubic yards dredged
l.Land Subject to Coastal
Storm Flowage
60
1. square feet
4.Restoration/Enhancement
Restoration/Replacement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.2.b or B.3.h above, please entered the additional amount here.
a. square feet of BVW b. square feet of Salt Marsh
5.Projects Involves Stream Crossings
Project Involves Streams Crossings
If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.
a. number of new stream crossings b. number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent
Estimated Habitat Map of StateListed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program
(NHESP)?
a.Yes No
If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species
Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
b. Date of map:FROM MAP VIEWER
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....
c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)
1. Percentage/acreage of property to be altered:
(a) within Wetland Resource Area percentage/acreage
(b) outside Resource Area percentage/acreage
2. Assessor's Map or rightofway plan of site
3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing
existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **
a.Project description (including description of impacts outside of wetland resource area & buffer zone)
b. Photographs representative of the site
c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/naturalheritage/regulatory
review/massendangeredspeciesactmesa/mesafeeschedule.html )
Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address
Projects altering 10 or more acres of land, also submit:
d.Vegetation cover type map of site
e.Project plans showing Priority & Estimated Habitat boundaries
d. OR Check One of the following
1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321
CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/lawsregulations/cmr/321cmr1000massachusettsendangered
speciesact.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR
10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking Number
b. Date submitted to NHESP
3.Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.
*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...
2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?
a. Not applicable project is in inland resource area only
b.Yes No
If yes, include proof of mailing or hand delivery of NOI to either:
South Shore Cohasset to Rhode Island, and the Cape & Islands:
Division of Marine Fisheries
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 S. Rodney French Blvd
New Bedford, MA 02744
North Shore Hull to New Hampshire:
Division of Marine Fisheries
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.
For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.
3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a.Yes No If yes, provide name of ACEC (see instructions to WPA
Form 3 or DEP Website for ACEC locations). Note:
electronic filers click on Website.
b. ACEC Name
4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the
Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a.Yes No
5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §
40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?
a.Yes No
6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?
1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook
Vol.2, Chapter 3)
2.A portion of the site constitutes redevelopment
3.Proprietary BMPs are included in the Stormwater Management System
b.No, Explain why the project is exempt:
1.Single Family Home
2.Emergency Road Repair
3.Small Residential Subdivision (less than or equal to 4 singlefamily houses or less than or equal to 4 units in multifamily
housing project) with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you
submit to the Department by regular mail delivery.
1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the
Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland
[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).
Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4.List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:
60 GRAND VIEW
DRIVE YARMOUTH
MA PROPOSED PIER
AND FLOAT
PERMITTING PLAN
ROY OKUROWSKI
PE 04112024
NHESP MAP AND
LOCUS
NARRATIVE AND
PERFORMANCE
STANDARDS
5.If there is more than one property owner, please attach a list of these property owners not listed on this form.
6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8.Attach NOI Wetland Fee Transmittal Form.
9.Attach Stormwater Report, if needed.
E. Fees
1.
Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian
tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payer name on check: First Name 7. Payer name on check: Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true
and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper
at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40.
Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet
of the property line of the project location.
Gramoaldo Rustico 4/20/2024
1. Signature of Applicant 2. Date
Donna Martel TR 4/20/2024
3. Signature of Property Owner(if different)4. Date
Roy Okurowski 4/20/2024
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal
Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form,
and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the "yes" box in Section C, Items 13, above, refer to that section and the Instructions for additional submittal
requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the
Notice of Intent.
Massachusetts Department of Environmental
Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 1 of 7 * ELECTRONIC COPY
a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR
10.05(6)(k)(q) and check if:
A.General Information1. Project Location:a. Street Address 60 GRAND VIEW DRIVEb. City/Town YARMOUTH c. Zip Code 02664d. Latitude 41.68067N e. Longitude 70.16497Wf. Map/Plat #91/176 g.Parcel/Lot #81/00602. Applicant:Individual Organizationa. First Name GRIMOALDO b.Last Name RUSCITOc. Organizationd. Mailing Address 600 RANDOLPH ST.e. City/Town CANTON f. State MA g. Zip Code 02021h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com3.Property Owner:more than one ownera. First Name DONNA b. Last Name MARTEL TRc. Organization DJM/MJD REALTY TRUSTd. Mailing Address 579 BUCK ISLAND ROADe. City/Town YARMOUTH f.State MA g. Zip Code 02673h. Phone Number i. Fax j.Email4.Representative:a. First Name ROY b. Last Name OKUROWSKIc. Organization WRS ENGINEERING LLCd. Mailing Address 67 STETSON ST.e. City/Town HYANNIS f. State MA g. Zip Code 02601h.Phone Number 5087760956 i.Fax j.Email royokurowski@gmail.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 540.00 b.State Fee Paid 257.50 c.City/Town Fee Paid 282.506.General Project Description:
CONSTRUCTION OF NEW PIER, RAMP AND FLOAT ON BASS RIVER
7a.Project Type:
1. Single Family Home 2. Residential Subdivision
3.Limited Project Driveway Crossing 4.Commercial/Industrial
5.Dock/Pier 6.Utilities
7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)
9.Transportation 10.Other
7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310
CMR 10.53 (inland)?
1.Yes No If yes, describe which limited project applies to this project:
2. Limited Project
8.Property recorded at the Registry of Deeds for:
a.County:b.Certificate:c.Book:d.Page:
BARNSTABLE C229602
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1.Buffer Zone & Resource Area Impacts (temporary & permanent):
This is a Buffer Zone only project Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,
Inland Bank, or Coastal Resource Area.
2.Inland Resource Areas: (See 310 CMR 10.54 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a.Bank
1. linear feet 2. linear feet
b.Bordering Vegetated Wetland
1. square feet 2. square feet
c.Land under Waterbodies and Waterways
1. Square feet 2. square feet
3. cubic yards dredged
d.Bordering Land Subject to Flooding
1. square feet 2. square feet
3. cubic feet of flood storage lost 4. cubic feet replaced
e.Isolated Land Subject to Flooding
1. square feet
2. cubic feet of flood storage lost 3. cubic feet replaced
f.Riverfront Area
1. Name of Waterway (if any)
2. Width of Riverfront Area (check one)25 ft. Designated Densely Developed Areas only
100 ft. New agricultural projects only
200 ft. All other projects
3. Total area of Riverfront Area on the site of the proposed project
square feet
4. Proposed Alteration of the Riverfront Area:
a. total square feet b. square feet within 100 ft.c. square feet between 100 ft.
and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI?Yes No
6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No
3.Coastal Resource Areas: (See 310 CMR 10.25 10.35)
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a.Designated Port Areas Indicate size under Land under the ocean below,
b.Land Under the Ocean 7
1. square feet
2. cubic yards dredged
c.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, below
d.Coastal Beaches 2
1. square feet 2. cubic yards beach nourishment
e.Coastal Dunes
1. square feet 2. cubic yards dune nourishment
f.Coastal Banks 2
1. linear feet
g.Rocky Intertidal Shores
1. square feet
h.Salt Marshes
1. square feet 2. sq ft restoration, rehab, crea.
i.Land Under Salt Ponds
1. square feet
2. cubic yards dredged
j.Land Containing Shellfish 7
1. square feet
k.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land
Under Waterbodies and Waterways, above
1. cubic yards dredged
l.Land Subject to Coastal
Storm Flowage
60
1. square feet
4.Restoration/Enhancement
Restoration/Replacement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.2.b or B.3.h above, please entered the additional amount here.
a. square feet of BVW b. square feet of Salt Marsh
5.Projects Involves Stream Crossings
Project Involves Streams Crossings
If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.
a. number of new stream crossings b. number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent
Estimated Habitat Map of StateListed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program
(NHESP)?
a.Yes No
If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species
Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
b. Date of map:FROM MAP VIEWER
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....
c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)
1. Percentage/acreage of property to be altered:
(a) within Wetland Resource Area percentage/acreage
(b) outside Resource Area percentage/acreage
2. Assessor's Map or rightofway plan of site
3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing
existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **
a.Project description (including description of impacts outside of wetland resource area & buffer zone)
b. Photographs representative of the site
c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/naturalheritage/regulatory
review/massendangeredspeciesactmesa/mesafeeschedule.html )
Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address
Projects altering 10 or more acres of land, also submit:
d.Vegetation cover type map of site
e.Project plans showing Priority & Estimated Habitat boundaries
d. OR Check One of the following
1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321
CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/lawsregulations/cmr/321cmr1000massachusettsendangered
speciesact.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR
10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking Number
b. Date submitted to NHESP
3.Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.
*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...
2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?
a. Not applicable project is in inland resource area only
b.Yes No
If yes, include proof of mailing or hand delivery of NOI to either:
South Shore Cohasset to Rhode Island, and the Cape & Islands:
Division of Marine Fisheries
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 S. Rodney French Blvd
New Bedford, MA 02744
North Shore Hull to New Hampshire:
Division of Marine Fisheries
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.
For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.
3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a.Yes No If yes, provide name of ACEC (see instructions to WPA
Form 3 or DEP Website for ACEC locations). Note:
electronic filers click on Website.
b. ACEC Name
4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the
Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a.Yes No
5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §
40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?
a.Yes No
6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?
1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook
Vol.2, Chapter 3)
2.A portion of the site constitutes redevelopment
3.Proprietary BMPs are included in the Stormwater Management System
b.No, Explain why the project is exempt:
1.Single Family Home
2.Emergency Road Repair
3.Small Residential Subdivision (less than or equal to 4 singlefamily houses or less than or equal to 4 units in multifamily
housing project) with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you
submit to the Department by regular mail delivery.
1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the
Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland
[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).
Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4.List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:
60 GRAND VIEW
DRIVE YARMOUTH
MA PROPOSED PIER
AND FLOAT
PERMITTING PLAN
ROY OKUROWSKI
PE 04112024
NHESP MAP AND
LOCUS
NARRATIVE AND
PERFORMANCE
STANDARDS
5.If there is more than one property owner, please attach a list of these property owners not listed on this form.
6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8.Attach NOI Wetland Fee Transmittal Form.
9.Attach Stormwater Report, if needed.
E. Fees
1.
Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian
tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payer name on check: First Name 7. Payer name on check: Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true
and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper
at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40.
Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet
of the property line of the project location.
Gramoaldo Rustico 4/20/2024
1. Signature of Applicant 2. Date
Donna Martel TR 4/20/2024
3. Signature of Property Owner(if different)4. Date
Roy Okurowski 4/20/2024
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal
Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form,
and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the "yes" box in Section C, Items 13, above, refer to that section and the Instructions for additional submittal
requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the
Notice of Intent.
Massachusetts Department of Environmental
Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 2 of 7 * ELECTRONIC COPY
a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR
10.05(6)(k)(q) and check if:
A.General Information1. Project Location:a. Street Address 60 GRAND VIEW DRIVEb. City/Town YARMOUTH c. Zip Code 02664d. Latitude 41.68067N e. Longitude 70.16497Wf. Map/Plat #91/176 g.Parcel/Lot #81/00602. Applicant:Individual Organizationa. First Name GRIMOALDO b.Last Name RUSCITOc. Organizationd. Mailing Address 600 RANDOLPH ST.e. City/Town CANTON f. State MA g. Zip Code 02021h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com3.Property Owner:more than one ownera. First Name DONNA b. Last Name MARTEL TRc. Organization DJM/MJD REALTY TRUSTd. Mailing Address 579 BUCK ISLAND ROADe. City/Town YARMOUTH f.State MA g. Zip Code 02673h. Phone Number i. Fax j.Email4.Representative:a. First Name ROY b. Last Name OKUROWSKIc. Organization WRS ENGINEERING LLCd. Mailing Address 67 STETSON ST.e. City/Town HYANNIS f. State MA g. Zip Code 02601h.Phone Number 5087760956 i.Fax j.Email royokurowski@gmail.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 540.00 b.State Fee Paid 257.50 c.City/Town Fee Paid 282.506.General Project Description:CONSTRUCTION OF NEW PIER, RAMP AND FLOAT ON BASS RIVER7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE C229602B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. Designated Densely Developed Areas only
100 ft. New agricultural projects only
200 ft. All other projects
3. Total area of Riverfront Area on the site of the proposed project
square feet
4. Proposed Alteration of the Riverfront Area:
a. total square feet b. square feet within 100 ft.c. square feet between 100 ft.
and 200 ft.
5. Has an alternatives analysis been done and is it attached to this NOI?Yes No
6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No
3.Coastal Resource Areas: (See 310 CMR 10.25 10.35)
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a.Designated Port Areas Indicate size under Land under the ocean below,
b.Land Under the Ocean 7
1. square feet
2. cubic yards dredged
c.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, below
d.Coastal Beaches 2
1. square feet 2. cubic yards beach nourishment
e.Coastal Dunes
1. square feet 2. cubic yards dune nourishment
f.Coastal Banks 2
1. linear feet
g.Rocky Intertidal Shores
1. square feet
h.Salt Marshes
1. square feet 2. sq ft restoration, rehab, crea.
i.Land Under Salt Ponds
1. square feet
2. cubic yards dredged
j.Land Containing Shellfish 7
1. square feet
k.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land
Under Waterbodies and Waterways, above
1. cubic yards dredged
l.Land Subject to Coastal
Storm Flowage
60
1. square feet
4.Restoration/Enhancement
Restoration/Replacement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.2.b or B.3.h above, please entered the additional amount here.
a. square feet of BVW b. square feet of Salt Marsh
5.Projects Involves Stream Crossings
Project Involves Streams Crossings
If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.
a. number of new stream crossings b. number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent
Estimated Habitat Map of StateListed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program
(NHESP)?
a.Yes No
If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species
Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
b. Date of map:FROM MAP VIEWER
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....
c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)
1. Percentage/acreage of property to be altered:
(a) within Wetland Resource Area percentage/acreage
(b) outside Resource Area percentage/acreage
2. Assessor's Map or rightofway plan of site
3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing
existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **
a.Project description (including description of impacts outside of wetland resource area & buffer zone)
b. Photographs representative of the site
c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/naturalheritage/regulatory
review/massendangeredspeciesactmesa/mesafeeschedule.html )
Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address
Projects altering 10 or more acres of land, also submit:
d.Vegetation cover type map of site
e.Project plans showing Priority & Estimated Habitat boundaries
d. OR Check One of the following
1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321
CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/lawsregulations/cmr/321cmr1000massachusettsendangered
speciesact.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR
10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking Number
b. Date submitted to NHESP
3.Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.
*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...
2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?
a. Not applicable project is in inland resource area only
b.Yes No
If yes, include proof of mailing or hand delivery of NOI to either:
South Shore Cohasset to Rhode Island, and the Cape & Islands:
Division of Marine Fisheries
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 S. Rodney French Blvd
New Bedford, MA 02744
North Shore Hull to New Hampshire:
Division of Marine Fisheries
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.
For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.
3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a.Yes No If yes, provide name of ACEC (see instructions to WPA
Form 3 or DEP Website for ACEC locations). Note:
electronic filers click on Website.
b. ACEC Name
4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the
Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a.Yes No
5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §
40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?
a.Yes No
6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?
1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook
Vol.2, Chapter 3)
2.A portion of the site constitutes redevelopment
3.Proprietary BMPs are included in the Stormwater Management System
b.No, Explain why the project is exempt:
1.Single Family Home
2.Emergency Road Repair
3.Small Residential Subdivision (less than or equal to 4 singlefamily houses or less than or equal to 4 units in multifamily
housing project) with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you
submit to the Department by regular mail delivery.
1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the
Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland
[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).
Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4.List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:
60 GRAND VIEW
DRIVE YARMOUTH
MA PROPOSED PIER
AND FLOAT
PERMITTING PLAN
ROY OKUROWSKI
PE 04112024
NHESP MAP AND
LOCUS
NARRATIVE AND
PERFORMANCE
STANDARDS
5.If there is more than one property owner, please attach a list of these property owners not listed on this form.
6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8.Attach NOI Wetland Fee Transmittal Form.
9.Attach Stormwater Report, if needed.
E. Fees
1.
Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian
tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payer name on check: First Name 7. Payer name on check: Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true
and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper
at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40.
Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet
of the property line of the project location.
Gramoaldo Rustico 4/20/2024
1. Signature of Applicant 2. Date
Donna Martel TR 4/20/2024
3. Signature of Property Owner(if different)4. Date
Roy Okurowski 4/20/2024
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal
Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form,
and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the "yes" box in Section C, Items 13, above, refer to that section and the Instructions for additional submittal
requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the
Notice of Intent.
Massachusetts Department of Environmental
Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 3 of 7 * ELECTRONIC COPY
a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR
10.05(6)(k)(q) and check if:
A.General Information1. Project Location:a. Street Address 60 GRAND VIEW DRIVEb. City/Town YARMOUTH c. Zip Code 02664d. Latitude 41.68067N e. Longitude 70.16497Wf. Map/Plat #91/176 g.Parcel/Lot #81/00602. Applicant:Individual Organizationa. First Name GRIMOALDO b.Last Name RUSCITOc. Organizationd. Mailing Address 600 RANDOLPH ST.e. City/Town CANTON f. State MA g. Zip Code 02021h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com3.Property Owner:more than one ownera. First Name DONNA b. Last Name MARTEL TRc. Organization DJM/MJD REALTY TRUSTd. Mailing Address 579 BUCK ISLAND ROADe. City/Town YARMOUTH f.State MA g. Zip Code 02673h. Phone Number i. Fax j.Email4.Representative:a. First Name ROY b. Last Name OKUROWSKIc. Organization WRS ENGINEERING LLCd. Mailing Address 67 STETSON ST.e. City/Town HYANNIS f. State MA g. Zip Code 02601h.Phone Number 5087760956 i.Fax j.Email royokurowski@gmail.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 540.00 b.State Fee Paid 257.50 c.City/Town Fee Paid 282.506.General Project Description:CONSTRUCTION OF NEW PIER, RAMP AND FLOAT ON BASS RIVER7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE C229602B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. Designated Densely Developed Areas only100 ft. New agricultural projects only200 ft. All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:a. total square feet b. square feet within 100 ft.c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 71. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 21. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 21. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 71. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to CoastalStorm Flowage 601. square feet4.Restoration/Enhancement
Restoration/Replacement
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.2.b or B.3.h above, please entered the additional amount here.
a. square feet of BVW b. square feet of Salt Marsh
5.Projects Involves Stream Crossings
Project Involves Streams Crossings
If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.
a. number of new stream crossings b. number of replacement stream crossings
C. Other Applicable Standards and Requirements
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent
Estimated Habitat Map of StateListed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program
(NHESP)?
a.Yes No
If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species
Program
Division of Fisheries and Wildlife
1 Rabbit Hill Road
Westborough, MA 01581
b. Date of map:FROM MAP VIEWER
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....
c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)
1. Percentage/acreage of property to be altered:
(a) within Wetland Resource Area percentage/acreage
(b) outside Resource Area percentage/acreage
2. Assessor's Map or rightofway plan of site
3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing
existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **
a.Project description (including description of impacts outside of wetland resource area & buffer zone)
b. Photographs representative of the site
c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/naturalheritage/regulatory
review/massendangeredspeciesactmesa/mesafeeschedule.html )
Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address
Projects altering 10 or more acres of land, also submit:
d.Vegetation cover type map of site
e.Project plans showing Priority & Estimated Habitat boundaries
d. OR Check One of the following
1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321
CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/lawsregulations/cmr/321cmr1000massachusettsendangered
speciesact.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR
10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking Number
b. Date submitted to NHESP
3.Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.
*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...
2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?
a. Not applicable project is in inland resource area only
b.Yes No
If yes, include proof of mailing or hand delivery of NOI to either:
South Shore Cohasset to Rhode Island, and the Cape & Islands:
Division of Marine Fisheries
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 S. Rodney French Blvd
New Bedford, MA 02744
North Shore Hull to New Hampshire:
Division of Marine Fisheries
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.
For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.
3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a.Yes No If yes, provide name of ACEC (see instructions to WPA
Form 3 or DEP Website for ACEC locations). Note:
electronic filers click on Website.
b. ACEC Name
4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the
Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a.Yes No
5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §
40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?
a.Yes No
6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?
1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook
Vol.2, Chapter 3)
2.A portion of the site constitutes redevelopment
3.Proprietary BMPs are included in the Stormwater Management System
b.No, Explain why the project is exempt:
1.Single Family Home
2.Emergency Road Repair
3.Small Residential Subdivision (less than or equal to 4 singlefamily houses or less than or equal to 4 units in multifamily
housing project) with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you
submit to the Department by regular mail delivery.
1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the
Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland
[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).
Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4.List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:
60 GRAND VIEW
DRIVE YARMOUTH
MA PROPOSED PIER
AND FLOAT
PERMITTING PLAN
ROY OKUROWSKI
PE 04112024
NHESP MAP AND
LOCUS
NARRATIVE AND
PERFORMANCE
STANDARDS
5.If there is more than one property owner, please attach a list of these property owners not listed on this form.
6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8.Attach NOI Wetland Fee Transmittal Form.
9.Attach Stormwater Report, if needed.
E. Fees
1.
Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian
tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payer name on check: First Name 7. Payer name on check: Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true
and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper
at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40.
Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet
of the property line of the project location.
Gramoaldo Rustico 4/20/2024
1. Signature of Applicant 2. Date
Donna Martel TR 4/20/2024
3. Signature of Property Owner(if different)4. Date
Roy Okurowski 4/20/2024
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal
Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form,
and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the "yes" box in Section C, Items 13, above, refer to that section and the Instructions for additional submittal
requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the
Notice of Intent.
Massachusetts Department of Environmental
Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 4 of 7 * ELECTRONIC COPY
a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR
10.05(6)(k)(q) and check if:
A.General Information1. Project Location:a. Street Address 60 GRAND VIEW DRIVEb. City/Town YARMOUTH c. Zip Code 02664d. Latitude 41.68067N e. Longitude 70.16497Wf. Map/Plat #91/176 g.Parcel/Lot #81/00602. Applicant:Individual Organizationa. First Name GRIMOALDO b.Last Name RUSCITOc. Organizationd. Mailing Address 600 RANDOLPH ST.e. City/Town CANTON f. State MA g. Zip Code 02021h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com3.Property Owner:more than one ownera. First Name DONNA b. Last Name MARTEL TRc. Organization DJM/MJD REALTY TRUSTd. Mailing Address 579 BUCK ISLAND ROADe. City/Town YARMOUTH f.State MA g. Zip Code 02673h. Phone Number i. Fax j.Email4.Representative:a. First Name ROY b. Last Name OKUROWSKIc. Organization WRS ENGINEERING LLCd. Mailing Address 67 STETSON ST.e. City/Town HYANNIS f. State MA g. Zip Code 02601h.Phone Number 5087760956 i.Fax j.Email royokurowski@gmail.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 540.00 b.State Fee Paid 257.50 c.City/Town Fee Paid 282.506.General Project Description:CONSTRUCTION OF NEW PIER, RAMP AND FLOAT ON BASS RIVER7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE C229602B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. Designated Densely Developed Areas only100 ft. New agricultural projects only200 ft. All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:a. total square feet b. square feet within 100 ft.c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 71. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 21. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 21. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 71. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to CoastalStorm Flowage 601. square feet4.Restoration/Enhancement Restoration/ReplacementIf the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has beenentered in Section B.2.b or B.3.h above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh5.Projects Involves Stream Crossings Project Involves Streams CrossingsIf the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.a. number of new stream crossings b. number of replacement stream crossingsC. Other Applicable Standards and RequirementsStreamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recentEstimated Habitat Map of StateListed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP)?a.Yes NoIf yes, include proof of mailing or hand delivery of NOI to:Natural Heritage and Endangered SpeciesProgramDivision of Fisheries and Wildlife1 Rabbit Hill RoadWestborough, MA 01581b. Date of map:FROM MAP VIEWERIf yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)1. Percentage/acreage of property to be altered:(a) within Wetland Resource Area percentage/acreage(b) outside Resource Area percentage/acreage2. Assessor's Map or rightofway plan of site3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showingexisting and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **a.Project description (including description of impacts outside of wetland resource area & buffer zone)b. Photographs representative of the sitec. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/naturalheritage/regulatoryreview/massendangeredspeciesactmesa/mesafeeschedule.html )Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above addressProjects altering 10 or more acres of land, also submit:d.Vegetation cover type map of sitee.Project plans showing Priority & Estimated Habitat boundariesd. OR Check One of the following
1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321
CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/lawsregulations/cmr/321cmr1000massachusettsendangered
speciesact.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR
10.37 and 10.59.)
2. Separate MESA review ongoing.
a. NHESP Tracking Number
b. Date submitted to NHESP
3.Separate MESA review completed.
Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.
*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...
2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?
a. Not applicable project is in inland resource area only
b.Yes No
If yes, include proof of mailing or hand delivery of NOI to either:
South Shore Cohasset to Rhode Island, and the Cape & Islands:
Division of Marine Fisheries
Southeast Marine Fisheries Station
Attn: Environmental Reviewer
836 S. Rodney French Blvd
New Bedford, MA 02744
North Shore Hull to New Hampshire:
Division of Marine Fisheries
North Shore Office
Attn: Environmental Reviewer
30 Emerson Avenue
Gloucester, MA 01930
If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.
For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.
3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a.Yes No If yes, provide name of ACEC (see instructions to WPA
Form 3 or DEP Website for ACEC locations). Note:
electronic filers click on Website.
b. ACEC Name
4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the
Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a.Yes No
5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §
40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?
a.Yes No
6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?
1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook
Vol.2, Chapter 3)
2.A portion of the site constitutes redevelopment
3.Proprietary BMPs are included in the Stormwater Management System
b.No, Explain why the project is exempt:
1.Single Family Home
2.Emergency Road Repair
3.Small Residential Subdivision (less than or equal to 4 singlefamily houses or less than or equal to 4 units in multifamily
housing project) with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you
submit to the Department by regular mail delivery.
1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the
Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland
[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).
Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4.List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:
60 GRAND VIEW
DRIVE YARMOUTH
MA PROPOSED PIER
AND FLOAT
PERMITTING PLAN
ROY OKUROWSKI
PE 04112024
NHESP MAP AND
LOCUS
NARRATIVE AND
PERFORMANCE
STANDARDS
5.If there is more than one property owner, please attach a list of these property owners not listed on this form.
6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8.Attach NOI Wetland Fee Transmittal Form.
9.Attach Stormwater Report, if needed.
E. Fees
1.
Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian
tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payer name on check: First Name 7. Payer name on check: Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true
and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper
at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40.
Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet
of the property line of the project location.
Gramoaldo Rustico 4/20/2024
1. Signature of Applicant 2. Date
Donna Martel TR 4/20/2024
3. Signature of Property Owner(if different)4. Date
Roy Okurowski 4/20/2024
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal
Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form,
and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the "yes" box in Section C, Items 13, above, refer to that section and the Instructions for additional submittal
requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the
Notice of Intent.
Massachusetts Department of Environmental
Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 5 of 7 * ELECTRONIC COPY
a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR10.05(6)(k)(q) and check if:A.General Information1. Project Location:a. Street Address 60 GRAND VIEW DRIVEb. City/Town YARMOUTH c. Zip Code 02664d. Latitude 41.68067N e. Longitude 70.16497Wf. Map/Plat #91/176 g.Parcel/Lot #81/00602. Applicant:Individual Organizationa. First Name GRIMOALDO b.Last Name RUSCITOc. Organizationd. Mailing Address 600 RANDOLPH ST.e. City/Town CANTON f. State MA g. Zip Code 02021h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com3.Property Owner:more than one ownera. First Name DONNA b. Last Name MARTEL TRc. Organization DJM/MJD REALTY TRUSTd. Mailing Address 579 BUCK ISLAND ROADe. City/Town YARMOUTH f.State MA g. Zip Code 02673h. Phone Number i. Fax j.Email4.Representative:a. First Name ROY b. Last Name OKUROWSKIc. Organization WRS ENGINEERING LLCd. Mailing Address 67 STETSON ST.e. City/Town HYANNIS f. State MA g. Zip Code 02601h.Phone Number 5087760956 i.Fax j.Email royokurowski@gmail.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 540.00 b.State Fee Paid 257.50 c.City/Town Fee Paid 282.506.General Project Description:CONSTRUCTION OF NEW PIER, RAMP AND FLOAT ON BASS RIVER7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE C229602B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. Designated Densely Developed Areas only100 ft. New agricultural projects only200 ft. All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:a. total square feet b. square feet within 100 ft.c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 71. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 21. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 21. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 71. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to CoastalStorm Flowage 601. square feet4.Restoration/Enhancement Restoration/ReplacementIf the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has beenentered in Section B.2.b or B.3.h above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh5.Projects Involves Stream Crossings Project Involves Streams CrossingsIf the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.a. number of new stream crossings b. number of replacement stream crossingsC. Other Applicable Standards and RequirementsStreamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recentEstimated Habitat Map of StateListed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP)?a.Yes NoIf yes, include proof of mailing or hand delivery of NOI to:Natural Heritage and Endangered SpeciesProgramDivision of Fisheries and Wildlife1 Rabbit Hill RoadWestborough, MA 01581b. Date of map:FROM MAP VIEWERIf yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)1. Percentage/acreage of property to be altered:(a) within Wetland Resource Area percentage/acreage(b) outside Resource Area percentage/acreage2. Assessor's Map or rightofway plan of site3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showingexisting and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **a.Project description (including description of impacts outside of wetland resource area & buffer zone)b. Photographs representative of the sitec. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/naturalheritage/regulatoryreview/massendangeredspeciesactmesa/mesafeeschedule.html )Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above addressProjects altering 10 or more acres of land, also submit:d.Vegetation cover type map of sitee.Project plans showing Priority & Estimated Habitat boundariesd. OR Check One of the following1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/lawsregulations/cmr/321cmr1000massachusettsendangeredspeciesact.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR10.37 and 10.59.)2. Separate MESA review ongoing.a. NHESP Tracking Numberb. Date submitted to NHESP3.Separate MESA review completed.Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?a. Not applicable project is in inland resource area onlyb.Yes NoIf yes, include proof of mailing or hand delivery of NOI to either:South Shore Cohasset to Rhode Island, and the Cape & Islands:Division of Marine Fisheries Southeast Marine Fisheries StationAttn: Environmental Reviewer836 S. Rodney French Blvd New Bedford, MA 02744 North Shore Hull to New Hampshire:Division of Marine Fisheries North Shore OfficeAttn: Environmental Reviewer30 Emerson AvenueGloucester, MA 01930If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?a.Yes No If yes, provide name of ACEC (see instructions to WPAForm 3 or DEP Website for ACEC locations). Note:electronic filers click on Website.b. ACEC Name4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in theMassachusetts Surface Water Quality Standards, 314 CMR 4.00?a.Yes No5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?a.Yes No6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management HandbookVol.2, Chapter 3)2.A portion of the site constitutes redevelopment
3.Proprietary BMPs are included in the Stormwater Management System
b.No, Explain why the project is exempt:
1.Single Family Home
2.Emergency Road Repair
3.Small Residential Subdivision (less than or equal to 4 singlefamily houses or less than or equal to 4 units in multifamily
housing project) with no discharge to Critical Areas.
D. Additional Information
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you
submit to the Department by regular mail delivery.
1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the
Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland
[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).
Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4.List the titles and dates for all plans and other materials submitted with this NOI.
a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:
60 GRAND VIEW
DRIVE YARMOUTH
MA PROPOSED PIER
AND FLOAT
PERMITTING PLAN
ROY OKUROWSKI
PE 04112024
NHESP MAP AND
LOCUS
NARRATIVE AND
PERFORMANCE
STANDARDS
5.If there is more than one property owner, please attach a list of these property owners not listed on this form.
6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8.Attach NOI Wetland Fee Transmittal Form.
9.Attach Stormwater Report, if needed.
E. Fees
1.
Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian
tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payer name on check: First Name 7. Payer name on check: Last Name
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true
and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper
at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40.
Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet
of the property line of the project location.
Gramoaldo Rustico 4/20/2024
1. Signature of Applicant 2. Date
Donna Martel TR 4/20/2024
3. Signature of Property Owner(if different)4. Date
Roy Okurowski 4/20/2024
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal
Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form,
and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the "yes" box in Section C, Items 13, above, refer to that section and the Instructions for additional submittal
requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the
Notice of Intent.
Massachusetts Department of Environmental
Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 6 of 7 * ELECTRONIC COPY
A. Applicant Information
1. Applicant:
a. First Name GRIMOALDO b.Last Name RUSCITO
c. Organization
d. Mailing Address 600 RANDOLPH ST.
e. City/Town CANTON f. State MA g. Zip Code 02021
h. Phone Number 6172932338 i. Fax j. Email aruscito@aol.com
2.Property Owner:(if different)
a. First Name DONNA b. Last Name MARTEL TR
c. Organization DJM/MJD REALTY TRUST
d. Mailing Address 579 BUCK ISLAND ROAD
e. City/Town YARMOUTH f.State MA g. Zip Code 02673
h. Phone Number i. Fax j.Email
3. Project Location:
a. Street Address 60 GRAND VIEW DRIVE b. City/Town YARMOUTH
Are you exempted from Fee?
Note: Fee will be exempted if you are one of the following:
City/Town/County/District
Municipal Housing Authority
Indian Tribe Housing Authority
MBTA
State agencies are only exempt if the fee is less than $100
B. Fees
Activity Type Activity
Number Activity Fee RF Multiplier Sub Total
A.) WORK ON DOCKS, PIERS, REVETMENTS,
DIKES, ETC. (COASTAL OR INLAND).90 4.00
RFA MULTIPLIER
1.5 540.00
City/Town share of filling fee
$282.50
State share of filing fee
$257.50
Total Project Fee
$540.00
Massachusetts Department of Environmental Protection
Bureau of Resource Protection Wetlands
WPA Form 3 Notice of Wetland FeeTransmittal
Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:
eDEP Transaction #:1707085
City/Town:YARMOUTH
Page 1 of 1 * ELECTRONIC COPY
1
d
Proposed reconstruction of pier, ramp, and float
NOTICE OF
INTENT FILING
Filing Date: 042024
60 Grand View Drive
Yarmouth, MA
Prepared by: WRS
Engineering
THE DJM/MJD REALTY
60 Grand View Drive
2
Table of Contents
1. eDEP online filing application including original owner signature
2. Town of Yarmouth Administrative Checklist for NOI
3. Existing and Proposed Conditions narrative
4. Construction Sequence narrative (equipment, staging locations, etc.)
5. Alternatives Analysis narrative
7. Performance standard narrative (310 CMR 10.00 and Town of Yarmouth Wetland Bylaw
Chapter 143
9. Additional information (research, deeds, tax assessors card, maps)
10. Existing License and Plan
11. Shellfish Survey (on plan)
12. Other town forms
13. Certified mail receipts
14. Copies of checks
15. 1 original and 7 copies of Notice of Intent Plan
16. Certified abutters list and Notice to Abutters
60 Grand View Drive
3
Property Description
The property is located on middle section of the Bass River South of High Bank Road in Yarmouth, MA; a tidal
river on Nantucket sound. The project site is approximately 2.8 miles inland from Nantucket Sound. The property
is located on the Northern section of the channel facing South and subject to Southwest winds. The area of direct
flow for the channel is South of the dock at a distance of approximately 700’ and subject to current from both
flood and ebb tides. The site has an existing single family dwelling with a expired chapter 91 licensed licensed
pier, ramp, and float that was destroyed in Hurricane Bob according to sources. The area upland of MHW is a
coastal bank with remnants of the existing pier an existing stairway. The Coastal Bank consists of a rock
revetment. It appears that the dock was constructed approximately 40 to 50 feet East of where it was shown in
the original license. This is due to the water is deeper the farther you go east. We placed the new pier in this
direction 75’ from the adjacent pier to the East.
The area along the shoreline consists a coastal beach, revetment and salt marsh to the East that prevents
erosion from the river waters.
The site consists of an existing single family dwelling that was recently purchased in 2022 by
the current owner. There is an existing stairway on the coastal bank, that is the corrider we will
access the new pier ramp and float. Based on the latest MORIS maps, the scope of this project
is noy located within NHESP jurisdiction for estimated or rare wildlife (see below).
60 Grand View Drive
4
Project Description
Project Description
This Notice of Intent filing proposes the construction of a monopile pier, ramp, and 200 s.f. float
that extends 80’ from the mapped Mean High Water Line. The existing licensed structure was not
reconstructed within the allowable 5 years so a new NOI and Ch91 License is being requested.
The new proposed structure will be a monopile pier that is designed with minimal impact on the
resource areas. We are proposing something that was already in place from 1961 to 1995. The
structure is in line with all the existing piers on the shoreline and meets town requirements. The
equipment anticipated for the project will be a small barge with a crane and an impact or vibratory
hammer that will be utilized to drive the piles. The piles are not in the marsh and the piles will be
driven with a impact or vibratory hammer suspended off the barge. The barge will be used at
high tide as to not ground out at low tides. The use of the structure was an existing use for many
years and will not impact any recreational use of the waterway as its sided on both sides by
existing structures.
Resource Area Determination
The project site is located on Bass River, a tidal river which flows to and from Nantucket Sound. Mean High Water
and Mean Low Water elevations were obtained from survey utilizing an rtk gps and refercing the conversions
from NAVD88 in the project area. Please note that previous licenses reference MLW as the project datum while
this filing references NAVD88 vertical datum (conversion provided in plans). The further you travel upstream,
the more impact the river bottom, land restrictions, etc. impact the flow of water and reduce tidal flow except
in storm events. Since the proposed project property is located relatively far to the mouth of the river, the
existing tidal elevations from the charts can be used along with vegetation changes.
60 Grand View Drive
5
Performance Standards
The project proposes the construction of a pile supported pier, utilizing a fiberglass mono-pile support system
that extends from the top of the existing coastal bank to the float as shown on the project plans. The areas
directly affected by the project are coastal bank, LSCSF, area containing shellfish, and land under ocean. The
project as proposed will not have any adverse effects to the surrounding resource areas which include the areas
listed above.310 CMR 10, sections 10.21 through 10.37. The work proposed in this area consists of removing
some old piles and the stairway and driving new piles to support the pier and anchor the float. The area consists
of the coastal beach, land containing shellfish, land under ocean, and LCCSF. The construction is located in the
footprint of the old existing dock. Therefore, the project as proposed can be permitted under 310 CMR 10.30 (6)
through (8).
Land Containing shellfish – A portion of the dock is within land containing shellfish. The disturbance to the area
consists of removing and constructing fiberglass pilings to support the pier and float. The float will not be less
than the 3’ required height above the bottom at low tide. The disturbance to the area from the construction
effort is expected to be minimal and will not adversely affect any shellfish. The project will not change what is
relative to the bottom substrate, and therefore have no significant impact to the following interests: alterations
of water circulation, alterations in the distribution of sediment grain size, alterations from natural drainage from
adjacent land, or changes in water quality. This includes but is not limited to, fluctuations in level of salinity,
dissolved oxygen, nutrients, temperature and turbidity, or the addition of pollutants. Therefore, the project as
proposed will not have any significant adverse impacts to the coastal beach can be permitted under 310 CMR
10.34 (4) through (7).
Alternatives Analysis for dock
The proposed work consists of re-constructing of a pre-existing pier, ramp, and float that was destroyed. The
project as proposed occupies only a small area of the resource areas where the piles are driven and the float is
located as such, the following analysis is offered to describe the available options for this project.
OPTION 1: Do Nothing – If nothing is constructed the water dependent use of the property will be lost as there
is no way to access the water due to the steep rock revetment.
OPTION 2: Replace just beach stairs. The shoreline has forced high water so the stairs would serve no purpose
as there is minimal beach at only low tide. Therefore, this is not the preferred option.
OPTION 3: Reconstruct the previously licensed pier ramp and float to meet the current town requirements. This
will be a 1 time activity that will have the least impact on the resource areas, Therefore this is the preferred
option. As part of the project we feel that it is appropriate to mitigate the work by contributing to the
propagation of shellfish seed. We will be happy to contribute the amount suggested by shellfish or waterways.
60 Grand View Drive
6
CONSTRUCTION PROTOCOL
Water based Construction Protocol
The proposed work shall be performed with the minimum amount of equipment required to obtain the project
objectives. The staging area for materials will be from a working barge and the upland property. All equipment
shall be stored on the barge or away from the resource areas when not in use. When the equipment is not being
utilized the barge shall not come in contact the adjacent marsh at any time and shall not be allowed to bottom
out.
Coastal Bank Construction Protocol
The proposed work shall be performed in the following manner. The existing stars and deck will be replaced in
the existing footprint of the existing stairs and pier. All old materials will be removed and disposed of. Any
disturbance to the bank will be restored to pre-existing conditions.
Pre-Construction Meeting
Prior to construction, a pre-construction meeting shall be held on-site with the Contractor, Property Owner,
Conservation Commission and/or agent, and the Project Manager (WRS Engineering LLC). The purpose of the
meeting is to clearly delineate the limits of work and access, as well as the staging area. The Contractor will
describe the proposed means and methods for performing the work within the requirements of the plans, order
of conditions and construction protocol. The Contractor will comply with mitigation measures as established by
the Conservation Commission.
To be discussed at this meeting:
Existing property conditions, necessary precautions to be taken by the Contractor;
Means and methods for construction;
Necessary post-construction reparations and conditions;
Procedure for post-construction inspection;
WRS Engineering’s responsibilities for inspection and project coordination
During Construction, the site shall be accessible for inspection during reasonable hours by all parties, members
of the conservation commission and their agents, and the Project Manager.
Post-construction meeting
Upon completion of construction, but prior to equipment being removed from the site, a post-construction
meeting shall be held on-site with the Contractor, Property Owner, Conservation Commission and/or agent, and
the Project Manager (WRS Engineering). The purpose of this meeting is to determine that the project has been
satisfactorily completed in accordance with all permits, and that no additional work or mitigation is required by
the Contractor.
60 Grand View Drive
7
Restoration of project area
Upon completion of construction any and all areas disturbed by the construction effort shall be returned as
much as practical to their pre-construction conditions to the satisfaction of the property owner and conservation
agent. All disturbed marsh or vegetated areas shall be re-vegetated with indigenous or grass vegetation to match
pre-construction conditions for the surrounding areas, or as determined during the pre-construction meeting.
60 Grand View Drive
8
60 Grand View Drive
9
60 Grand View Drive
10
events. Since the proposed project property is located relatively far to the mouth of the river, the
existing tidal elevations from the charts can be used along with vegetation changes.
support system that extends from the existing coastal bank to the float as shown on the project plans.
The areas directly affected by the project are salt marsh, coastal bank, LSCSF, area containing
shellfish, and land under ocean. The project as proposed will not have any adverse effects to the
surrounding resource areas which include the areas listed above.310 CMR 10, sections 10.21 through
10.37. The work proposed in this area consists of removing and driving some piles to support the
dock. The area consists of the coastal beach, land containing shellfish, land under ocean, and salt
marsh. The construction is located in the footprint of the existing dock. Therefore, the project as
proposed can be permitted under 310 CMR 10.30 (6) through (8).
Salt Marsh – Both t shown on the project plans. A minimum number of proposed 3 pilings will be
driven around the salt marsh. The new height of the dock is the required minimum over the marsh,
with 3/4 deck board spacing as to not prohibit sunlight from reaching the marsh. Therefore, the
project as proposed can be permitted under 310 CMR 10.32 (5).
Land Containing shellfish – A portion of the dock is within land containing shellfish. The disturbance to
the area consists of removing and constructing wood pilings to support the float. The float will not be
less than the required height above the bottom at low tide. The disturbance to the area from the
construction effort is expected to be minimal and will not adversely affect any shellfish. The project will
not change what is relative to the bottom substrate, and therefore have no significant impact to the
following interests: alterations of water circulation, alterations in the distribution of sediment grain size,
alterations from natural drainage from adjacent land, or changes in water quality. This includes but is
not limited to, fluctuations in level of salinity, dissolved oxygen, nutrients, temperature and turbidity, or
the addition of pollutants. Therefore, the project as proposed will not have any significant adverse
impacts to the coastal beach can be permitted under 310 CMR 10.34 (4) through (7).
Alternatives Analysis for dock
The proposed work consists of re-constructing of the dock and float. The project as proposed occupies
only a small area of the resource areas where the piles are driven and the float is loc following
analysis is offered to describe the available options for this project.
OPTION 1: Do Nothing – If nothing is constructed the existing structure will eventually collapse.
Therefore, this is not the preferred option.
OPTION 2: Repair the existing structure. The dock has not been serviced in many years and all the
piles and timber are dry rotted and the entire structure would eventually have to be replaced anyway.
Therefore, this is not the preferred option.
OPTION 3: Reconstruct the dock in kind as allowed under the existing chapter 91 License. This will
the preferred option.
UCTION PROTOCOL
Water based Construction Protocol
The proposed work shall be performed with the minimum amount of equipment required to obtain the
staging area for materials will be from a working barge and the upland property. All equipment shall be
stored on the barge or away from the resource areas when not in use. When the equipment is not
being utilized the barge shall not come in contact with the marsh at any time and shall not be allowed
to bottom out.
Coastal Bank Construction Protocol
The proposed work shall be performed in the following manner. The existing stars and deck will be
replaced in kind in the existing footprint. All old materials will be removed and disposed of. Any
disturbance to the bank will be restored to pre-existing conditions.
Pre-Construction Meeting
60 Grand View Drive
11
Prior to construction, a pre-construction meeting shall be held on-site with the Contractor, Property
Owner, Conservation Commission and/or agent, and the Project Manager (WRS Engineering LLC).
The purpose of the meeting is to clearly delineate the limits of work and access, as well as the staging
area. The Contractor will describe the proposed means and methods for performing the work within
the requirements of the plans, order of conditions and construction protocol. The Contractor will
comply with mitigation measures as established by the Conservation Commission.
To be discussed at this meeting:
Existing property conditions, necessary precautions to be taken by the Contractor;
Means and methods for construction;
Necessary post-construction reparations and conditions;
Procedure for post-construction inspection;
coordination
During Construction, the site shall be accessible for inspection during reasonable hours by all parties,
members of the conservation commission and their agents, and the Project Manager.
Post-construction meeting
Upon completion of construction, but prior to equipment being removed from the site, a post-
construction meeting shall be held on-site with the Contractor, Property Owner, Conservation
Commission and/or agent, and the Project Manager (WRS Engineering). The purpose of this meeting
is to determine that the project has been satisfactorily completed in accordance with all permits, and
that no additional work or mitigation is required by the Contractor.
Restoration of project area
Upon completion of construction any and all areas disturbed by the construction effort shall be
returned as much as practical to their pre-construction conditions to the satisfaction of the property
owner and conservation agent. All disturbed marsh or vegetated areas shall be re-vegetated with
indigenous or grass vegetation to match pre-construction conditions for the surrounding areas, or as
determined during the pre-construction meeting.
91/ 178/ / /
LOVE CAROL L
70 GRANDVIEW DR,
SOUTH YARMOUTH , MA 02664
91/ 177/ / /
STEEL PAUL M
STEEL JODY L
23 OPAL CIR
FRANKLIN , MA 02038
91/ 176/ / /
MARTELL DONNA JEAN TR
THE DJM/MJD REALTY TRUST
18 JOHNSON LN
WEST YARMOUTH , MA 02673
91/ 175/ / /
ANDERSON KENNETH
ANDERSON CYNTHIA
264 WESTON RD
WELLESLEY , MA 02482
91/ 169/ / /
COSTA ANTHONY L
COSTA SUSAN A
49 GRANDVIEW DR
SOUTH YARMOUTH , MA 02664
91/ 174/ / /
DADDARIO PETER F TRS
44 TALL TIMBERS DR
FARMINGTON , CT 06032
91/ 185/ / /
FOLTZ JAMES A TR
DOYLE KARIN N TR
136 ARIEL CIR
SUTTON , MA 01590
Please use this signature to certify this list of properties
abutting within 100' of the parcel located at:
60 Grandview Dr., South Yarmouth, MA 02664
Assessors Map 91, Lot 176
_____________________________________
Andy Machado, Director of Assessing
April 8, 2024
NOTIFICATION TO ABUTTERS UNDER THE
MASSACHUSETTS WETLANDS PROTECTION ACT &
TOWN OF YARMOUTH WETLAND BY-LAW, CHAPTER 143
In accordance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40,
you are hereby notified of the following:
A. The name of the applicant is _MARTEL DONNA JEAN TRUST/THE DJM-MJD REALTY TRUST_____
B. The applicant has filed a Notice of Intent with the Yarmouth Conservation Commission, seeking
permission to remove, fill, dredge or alter an Area Subject to Protection under the Wetlands
Protection Act (MGL c. 131 s. 40 & Town of Yarmouth Wetland By-Law, Chapter 143).
C. The address of the lot where the activity is proposed is __60 GRAND VIEW DRIVE____________
D. Proposed work is ____CONSTRUCTION OF PIER AND FLOAT_______________________
____________________________________________________________________________
E. Copies of the Notice of Intent may be examined at the Yarmouth Town Hall at the Conservation
Commission office between the hours of 9:00 a.m. and 4:00 p.m. Monday thru Friday. For more
information, call (508) 398-2231 ext. 1288.
F. Copies of the Notice of Intent may be obtained from either the applicant or applicant’s
representative. Applicant’s phone number _____________________________________
Or Applicant’s representatives phone number ___508-776-0956________________
G. Information regarding the date, time and place of the public hearing may be obtained by calling
the Yarmouth Conservation Commission office at (508) 398-2231 ext. 1288
H. Person sending this notification (applicant, representative or other)
Name ____WRS Engineering LLC Roy Okurowski______________________________________
Address ____67 Stetson St.____________________________________
Town ___Hyannis______________ State __MA_____ Zip __)2601_______
Telephone ______508-776-0956_________________________________
NOTES :
Notice of the public hearing, including date, time and place will be published at least five (5)
days in advance in a newspaper of general circulation.
Notice of the public hearing, including date, time and place will be posted in the Town Hall not
less than forty-eight hours in advance.
You may also contact the Southeast Regional Office of the Department of Environmental
Protection at (508) 946-2800 for more information about this application.
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231
If the applicant is not the property owner, please submit this form with your application. The owner
must be sent a copy of the application on the same day it is filed with this office.
Property Address: _____________________________________________________________
Assessors Map/Lot: _____________________________________________________________
I (we) hereby authorize the individual members of the Yarmouth Conservation Commission and its
agents to enter upon the referenced property for the purpose of gathering information regarding the
application filed with the Commission pursuant to the Wetlands Protection Act (M.G.L. Ch. 131, s.
40) and/or the Yarmouth Wetlands Protection Bylaw (Chapter 143).
Authorized Signature: _______________________________________ Date: ______________
Please Print Name: _________________________________________
If other than owner, please state whether tenant, agent, or other: _____________________
Mailing Address: ________________________________________________
________________________________________________
________________________________________________
Phone: __________________________ Cell: __________________________
Email: __________________________ Fax: __________________________
DEPARTMENT
OF
CONSERVATION
60 Grand View Drive
Map 191 Lot 176
04-16-2024
Roy Okurowski
Agent
WRS Engineering LLC
67 Stetson St.
Hyannis, MA 02601
508-776-0956
royokurowski@gmail.com
21 day waiver
CONSERVATION
OFFICE
Town of Yarmouth
Conservation Commission
21-DAY WAIVER
Please complete this form, sign at the bottom and return to the Conservation Office.
I, , hereby waive the
21-day time period for a public hearing/meeting and/or issuance of the:
OOC / DOA / COC / ORAD following receipt of my filing of a:
Notice of Intent
Request for Determination of Applicability
Request for Certificate of Compliance
Other
by the Yarmouth Conservation Commission under Massachusetts General Laws,
Ch. 131, sec. 40, and/or under Yarmouth Wetland Bylaw.
The application was submitted on
(date received by Conservation Office)
for work at
(project address/location)
I am the: Applicant
Applicant's Representative
Property Owner
Signature Date
NOTE: Please be advised that you will be notified of the meeting date once this
application has been assigned to a Conservation Meeting Agenda at the email address
listed on the application.
Roy Okurowski
x
April 16, 2024
60 Grand View Drive
x
04-16-2024
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
N O T N O T
A N A N
O F F I C I A L O F F I C I A L
C O P Y C O P Y
240MISC
SEWER P
12812
1013
Account #12812 Bldg #1 Sec # 1 of Card # of
UTILITIESTOPO LOCATION
815
CURRENT ASSESSMENT
Total
1013
1013
530,900
962,800
1 1 Paved 2 Suburban
SUPPLEMENTAL DATA
SALE DATE PREVIOUS ASSESSMENTS (HISTORY)
This signature acknowledges a visit by a Data Collector or AssessorOTHER ASSESSMENTS
APPRAISED VALUE SUMMARY
EXEMPTIONS
528,500
1,500
900
962,800NOTES
22-007352 06-27-2022
BUILDING PERMIT RECORD
LAND LINE VALUATION SECTION
Level
CURRENT OWNER
V/IQ/U
60 GRANDVIEW DRProperty Location Map ID
Vision ID
Bldg Name State Use
STRT / ROAD
Total
VISIT / CHANGE HISTORY
1,493,700 1,493,700
4 BEDROOMS PER HEALTH 7/13/15 CW
1 1 1
Description Code Assessed
530,900
962,800
Assessed
CodeYear AssessedCodeYear
Total
Assessed VYearCodeAssessed
TotalTotal
2023 2022 1013
1013
1013
1013
1013
1013
469,900
908,900
375,100
726,500
1,493,700 1,378,800 1,101,600
0
Permit Id Issue Date
Year Code Description Amount
0.00
Code Description Number Amount Comm Int
Appraised Bldg. Value (Card)
Appraised Xf (B) Value (Bldg)
Appraised Ob (B) Value (Bldg)
Appraised Land Value (Bldg)
1,493,700Total Appraised Parcel Value
962,800
Land Value
42.5
Adj Unit P
Special Land Value
U
U
962,800
VISION
1
Use Code
Type
RF Re-Roof
Description
27,600
Amount Insp Date % Comp Date Comp Comments
Re-roofing the existing flat and
1.0000
Description
SFR WATER M
Zone Land Type Cond.
1.00
Nbhd.
0080
Nbhd. Adj
1.650 WF4
Location AdjustmentNotes
Total Card Land Units 0.52 Total Land Value
B
1013 81.00000SF22,651
Site IndexSize AdjUnit PriceLand Units
Parcel Total Land AreaSF22,651
6.69
KM
DM
BH
JB
JB
DH
IdDate
02-24-2020
07-21-2015
01-01-2014
06-28-2005
06-28-2005
07-19-1995
91/ 176/ / /
Assoc Pid#
YARMOUTH, MA
Cyclical
Field Review
CYCLICAL 2014
Measur+2Visit - Info Card l
Measur+1Visit
Measur+Listed
Purpost/Result
CL
54
CY
02
01
00
1
Is CdType
02
01
ASSESSING NEIGHBORHOOD
Nbhd
0080
Nbhd Name B Tracing Batch
Total Appraised Parcel Value 1,493,700
Valuation Method C
530,900
962,800
2024
THE DJM/MJD REALTY TRUST
579 BUCK ISLAND RD UNIT 156
MARTELL DONNA JEAN TR
LAWN SPRINKLERS
04-07-2022
07-22-1997
0
0
0
Print Date 9/18/2023
ZIP CODE 2664:
I
I
I
RESIDNTL
RES LAND
VOTE Y
PRIVATE GRANDVIEW DR-
150B
M_311154_826463GIS ID
PLAN #
Alt Prcl ID 81/ X006/ / /
WEST YARMOUTH MA 02673 12/19/1995VOTE DATE
BETTERMENTS
1F
1F
VC
100
100
0
SALE PRICE
C229602
D700048
MARTELL DONNA JEAN TR
MARTELL DONNA JEAN
MARTELL ELY A
BK-VOL/PAGERECORD OF OWNERSHIP
1013
Account #12812 Bldg #1 Sec # 1 of Card # of
60 GRANDVIEW DR
Element
Dep % Ovr
Dep Ovr Comment
Misc Imp Ovr
Misc Imp Ovr Comment
Cost to Cure Ovr
Element
Undeprec Value
COST / MARKET VALUATION
67
528,500
Adjust Type
CONDO DATA
Factor%
12812
Property Location
Vision ID
Map ID Bldg Name State Use
Print Date1 11
Description
Cost to Cure Ovr Comment
Description
Code
OB - OUTBUILDING & YARD ITEMS(L) / XF - BUILDING EXTRA FEATURES(B)
BUILDING SUB-AREA SUMMARY SECTION
Unit Cost
RCNLD
Condition
1
0Ext. Comment
0Functional Obsol
33
Year Remodeled
Remodel Rating
1960Year Built
788,854
F
First Floor
Basement, Finished
Porch, Enclosed, Finished
Garage
Patio
Basement, Unfinished
BAS
FBM
FEP
FGR
PTO
UBM
Ttl Gross Liv / Lease Area
2,190
0
0
0
0
0
2,190 4,174
2,190
191
112
202
14
123
2,832
272.14
122.59
190.50
109.07
13.61
54.34
595,989
51,979
30,480
54,973
3,810
33,473
Parcel Id 0.0
SB
C
CONSTRUCTION DETAIL CONSTRUCTION DETAIL (CONTINUED)
Owne
Condo Flr
Condo Unit
Code Description
FPL1
SHD1
Code Description Living Area
2,190
424
160
504
280
616
Floor Area
Appr. Value
1,500
900
Depreciation Code
Building Value New
Effective Year Built
Depreciation %
Trend Factor
Condition %
Percent Good
Unit Price Yr Blt
1980
1960
Cond. Cd
67
100
% Gd Grade Grade Adj.
0.00
0.00
Description
FIREPLACE 1
SHED FRAME
B
L
L/B Units
1
114
2200.00
8.00
91/ 176/ / /
Cd
Eff Area
770,704
Cd
Style:
Model
Grade:
Stories:
Occupancy
Exterior Wall 1
Exterior Wall 2
Roof Structure:
Roof Cover
Interior Wall 1
Interior Wall 2
Interior Flr 1
Interior Flr 2
Heat Fuel
Heat Type:
AC Type:
Total Bedrooms
Total Bthrms:
Total Half Baths
Total Xtra Fixtrs
Total Rooms:
Bath Style:
Kitchen Style:
Ranch
Residential
Average +20
1 Story
Wood Shingle
Gable/Hip
Asph/F Gls/Cmp
Drywall/Sheet
Hardwood
Gas
Hot Water
Central
3 Bedrooms
6 Rooms
Average
Modern
01
01
05
1
14
03
03
05
12
03
05
03
03
4
0
6
02
02
9/18/2023