Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH , c SEWAGE PLAN REVIEW CHECKLIST Location: AM LOT /S 7 Date of Subdivision Approval Street/ 44or /47/iV/i Zone of Contribution: In Out ' Village . iry , Commercial Residential Owner: �afr� (�('.e.-_ Installer P,/-Z/ ,3F - c1'3 , Builder: Engineer /),,_ , C� ', ) - r_, .237 , N/A YES NO 1. Required number of copies received. i� 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water tablet new construction) .,. 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown - NGVD if near wetlands. 7. Building sewer does not exit center of house. 8._ Septic tank a minimum of 10 feet from house and deck. ►� 9. Leaching a minimum of 20 feet from house and 10 feet from deck. J i. 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. ✓ - 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. ►/./ 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. ✓/ 17. System meets slope requirements - min. 1/8", 1/4" preferred. ✓✓ 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper, gas baffle on outlet tee. 20. Sewage flow under 10.000 gpd for parcel. ✓l 21. No garbage disposal. `� 22. System adequately sized for its intended use. ✓' 23. Minimum 6" stone or mechanically compacted below the tank and d-box. l/' 24. Manhole covers within 6" of grade - septic tank and pump chamber. •./ 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve. sanitary in d-box, alarm on separate circuit_/ 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal ‘...- b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. -� 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. `J 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. `f 6 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: