HomeMy WebLinkAboutBLDE-23-002242 Commonwealth of Official Use Only • 11.11t1 Massachusetts Permit No. BLDE-23-002242 BOARD OF FIRE PREVENTION REGULATIONS Occupancy and Fee Checked [Rev.1/07] APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (MEC),527 CMR 12.00 (PLEASE PRINT IN INK OR TYPE ALL INFORMATION) Date:10/26/2022 City or Town of: YARMOUTH To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location(Street&Number) 2 BARNBOARD LN Owner or Tenant JACKSON JOSEPH Telephone No. Owner's Address 2 BARNBOARD LN, WEST YARMOUTH, MA 02673 Is this permit in conjunction with a building permit? Yes 0 No ❑ (Check Appropriate Box) Purpose of Building Utility Authorization No. Existing Service Amps Volts Overhead 0 Undgrd 0 No.of Meters New Service Amps Volts Overhead 0 Undgrd 0 No.of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Installation of solar PV system (24 Panels 7.6 KW)(NO ESS) Completion of the following table may be waived by the Inspector of Wires. No.of Recessed Luminaires No.of Ceil.-Susp.(Paddle)Fans No.of Total Transformers KVA No.of Luminaire Outlets No.of Hot Tubs Generators KVA No.of Luminaires Swimming Pool Above ❑ In- ❑ No.of Emergency Lighting grnd. rnd. Battery Units No.of Receptacle Outlets No.of Oil Burners FIRE ALARMS No.of Zones No.of Switches No.of Gas Burners No.of Detection and Initiating Devices No.of Ranges No.of Air Cond. Total No.of Alerting Devices Tons No.of Waste Disposers Heat Pump Number Tons , KW No.of Self-Contained Totals: Detection/Alerting Devices No.of Dishwashers Space/Area Heating KW Local ❑ Municipal 0 Other: Connection No.of Dryers Heating Appliances KW Security Systems:* No.of Devices or Equivalent No.of Water KW No.of No.of Ballasts Data Wiring: Heaters ,Signs No.of Devices or Equivalent No.Hydromassage Bathtubs No.of Motors Total HP Telecommunications Wiring: No.of Devices or Equivalent OTHER: Attach additional detail if desired,or as required by the Inspector of Wires. Estimated Value of Electrical Work: (When required by municipal policy.) Work to start: Inspection to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COVERAGE:Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent.The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE:INSURANCE 0 BOND 0 OTHER 0 (Specify:) I certify,under the pains and penalties of perjury,that the information on this application is true and complete. FIRM NAME: JAMES E PRECOURT Licensee: James E Precourt Signature LIC.NO.: 12418 (If applicable,enter"exempt"in the license number line.) Bus.Tel.No.: Address:244 S WORCESTER ST,APT 3,NORTON MA 027663445 Alt.Tel.No.: *Per M.G.L.c. 147,s.57-61,security work requires Department of Public Safety"S"License: OWNER'S INSURANCE WAIVER:I am aware that the License does not have the liability insurance coverage normally required by law.But my signature below,I hereby waive this requirement.I am the(check one) 0 owner 0 owner's agent. Owner/Agent Signature Telephone No. PERMIT FEE: $150.00 ;i(1s1 .77v• 1 ( :3cm ) r4 ilti Wzz/ eg 1 ,.,,4� 1212 /z. RECEIVE ' RECEIVED ,.\; u ''�'0��l� - yy� OC 25 2022 ofalUse Only t rN NrT — c3- 7 , r' ; iLDING DEPART LDING DEPA RTM_�I�t e-,' __ t.a n1 o`�w .nrtcoa__ and Fee Checked »` BOARD OF FIRE PREVENTION REGULATIONS (leave blank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC).527 CMR 12.00 (PLEASE PRINT IN INK OR TYPE ALL INFORMATION) Date: 10/05/2022 City or Town of: Yarmouth To the Inspector of Wires: By this application the undersigned gives notice of his or hernttention to perform the electrical work described below. Location(Street&Number) 2 Barnboard Ln Owner or Tenant Jackson Joseph Telephone No. 508-916-9254 Owner's Address 2 Barnboard Ln,Yarmouth,MA,02673 Is this permit in conjunction with a building permit? Yes ® No ❑ (Check Appropriate Bel) Purpose of Building Residential Utility Authorization No. Existing Service Amps / Volts Overhead❑ Undgrd❑ No.of Meters ?few Service Amps / Volts Overhead❑ Undgrd❑ No.of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Installation of 24 root mounted solar panels.7.6 kw.No ESS V' Completion of the followingpxble muv be waived by the Inspector of Wires. "• Na.or Total 4 No.of Recessed Luminaires No.of Ceit.-Susp.(Paddle)Fans Transformers KVA V. KVA C. No.of Luminaire Outlets No.of Hot Tubs Generators C t No.of Luminaires Swimming Pool Above ❑ In- ❑ No.of Emergency Lightinggrnd. grnd. Battery Units No.of Receptacle Outlets No.of Oil Burners FIRE ALARMS 1No.of Zones i, No.of Switches No.of Gas Burners No.of Detection and �' InitiatinggDevices 11 No.of Ranges No.of Air Cond. Total No.of Alerting Devices No.of Waste Disposers Heat Pump Number Tons KW No.of Self-Contained Po Totals: Detection/Alerting Devices No.of Dishwashers Space/Area Heating KW Local❑M Connectiounicipaln ❑Other No.of Dryers Heating Appliances KW Security Systems:' No.of Devices or Equivalent No.of Water No.of No.of Data Wiring: Heaters KW No. Ballasts No.of Devices or E9nivallent No.Hydromassage Bathtubs No.of Motors Total HP Tel No.of eviceionss or Eq ivident OTHER: Attach additional detail if desired.or as required by the Inspector of Wires. Estimated Value of Electrical Work: 3,007.70 (When required by municipal policy.) Work to Start: 10/19/2022 Inspections to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COVERAGE: Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE ❑ BOND ❑ OTHER❑ (Specify:) /certify,under the pains and penalties of perjury,that the information on this application is true and complete. FIRM NAME: James Precourt LIC.NO.: Licensee: 12418 A Signature -I0-4".43'Pre-court LIC.NO.: (If applicable.enter"exempt"in the license,,amber line.) Bus.Tel.No.' Address: Alt.Tel.No.: *Per M.G.L.c.147,s.57-61,security work requires Department of Public Safety"S"License: Lic.No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below,I hereby waive this requirement. I am the(check one)0 owner 0 owner's agent. Owner/Agent Ja'vvey Pre.tourr Signature Telephone No. 339-201-7769 PERMIT FEE:5 _ • The Commonwealth of Massachusetts �= �--?.„ Department of Industrial Accidents _may 1 Congress Street, Suite 100 _4 t Boston, MA 02114-2017 ti='� �'' www.mass.gov/dia `Yorkers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/lndividual): Summit Energy Group Address: 15 Berkshire Rd City/State/Zip: Mansfield, MA, 02048 Phone #: 339 201 7769 Are you an employer?Check the appropriate box: ( Type of project(required): 1.2 I am a employer with 10 employees(full and/or part-time).' 7. ❑New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. ❑ Remodeling any capacity.[No workers'comp.insurance required.) 3. I am a homeowner doingall work myself. t 9. ❑ Demolition ❑ y [No workers'comp.insurance required.] 10 0 Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.0 Electrical repairs or additions proprietors with no employees. 12.0 Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.E Roof repairs These sub-contractors have employees and have workers'comp.insurance.t 6.0 We area corporation and its officers have exercised their right of exemption per MGL c. 14.®Other Solar 152,§1(4),and we have no employees. [No workers'comp.insurance required.] `Any applicant that checks box 41 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. +Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Colony Insurance Company Policy#or Self-ins.Lic.#: 001120909 Expiration Date: 01-01-2023 Job Site Address: 2 Barnboard Ln City/State/Zip: Yarmouth, MA, 02673 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: JU-1'fu', K rug U-e, Date: 10/05/2022 Phone#: 339-201-7769 Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: DIRECTORY NEW PV SYSTEM : JACKSON JOSEPH PV1 PROJECT SUMMARY PV2 NOTES 2 BARNBOARD LN , WEST YARMOUTH , MA 02673 , USA PV3 PLOT PLAN PV4 SITE PLAN -, PV5 ATTACHMENT DIAGRAM (41 .661292 , -70.242161 ) PV6 ATTACHMENT DETAILS&ELEVATION PV7 THREE LINE DIAGRAM PV8 BILL OF MATERIALS PV SYSTEM RATING (DC): 9.480 KW PV9 WARNING LABELS PV9.1 PLACARD PV10-PV13 DATA SHEETS (06._,..3 I SYSTEM INFORMATION .. ',t T _ . . . r. p . �"� a ? `. 'a•..K. rt C COMPANY. DC SYSTEM SIZE 9.480 Kw ► rroo. `• .r. M 1� , I. SUMMIT ENERGY GROUP ur._ .. AC SYSTEM SIZE 7.60 KW ,� •" �E • i b DC/AC RATIO 1.25 "• �y * g .n,*„ ` . 4 293 LIBBEY INDUSTRIAL PKWY, REC SOLAR ALPHA PURE r� tt y ' y 1 _«`'1-� a ; 'f.SSr ' ;. UNIT 250,WEYMOUTH, MODULE �. ��� BLACK SERIES395W `' 1." 4 4 1y� h- - - '' .1-0 ..T 1 `t. pMpA02c18e9,USA M.- api + , 4 • 3 K .,f�, ^ �M+i 1 ,L Y j.� 4. .� .f: Y • 1•_q,*.'? A ' 888-678-6648 SOLAREDGE TECHNOLOGIES, i * s ♦ 6' •['T..'�.+ .„, Win. h _ . t +- . , 1" =r .�- www.summitsolarener com MLPEJINVERTER --'� i a *� * .. � •+, ww.sum 95/• S440,SE7600H-USRGM + I► * ` t — hw, i { f ca m? ''�` �, i r r..0t,,. illt RACKING UNIRAC 4 A Ilk e q • . �r'�� t ' � s Yrt- L e A; CUSTOMER DETAILS ATTACHMENTS FLASHLOC , • . ' • _ - - . TOTAL ARRAY AREA 480.0 SOFT. CI) CO p :. `• ♦ :• Y. ... NO.OF MODULES 24 ., 4 / M�Y/R _ - o 4 f _ .. = c~fJ ARRAY 1 AZIMUTH 262° , ': x : '« , •± ' �,' a� ;,, — _ -- I W WCL al_ :-.7:-.79- ARRAY 1 PITCH 45° » - _ "p T a f '4 ; ARRAY 2 AZIMUTH 262° .— — .__ p p ARRAY 2 PITCH 45° ` 4 ..: : ' -ir a i 44,r '° � _ . ARRAY 3 AZIMUTH ,,y p ;- i*.a �. „,d N . 9..... F, . Ir(75 O = W ARRAY 3 PITCH - ! :6 .it ',ii:r ARRAY 4 AZIMUTH • • 'x , '....•�.a ...r ;,'i=. "YE.",": fii• tr.r a ".rY_ -��4aS �— ,.. N } Z ARRAY 5 AZIMUTH _ U ARRAY 5 PITCH FINANCE TYPE CONCERT AERIAL VIEW 2 STREET VIEW PROJECT ID: MANG9.48-2020 UTILITY NAME EVERSOURCE 1 NOT TO SCALE PREPARED ON: 10/1/2022 NOT TO SCALE REMOTE YES — DRAWN BY: UNIRAC MONITORING N INTERCONNECTION DETAILS CHECKED BY: S.T. SITE DETAILS STAMPED BY: S.W. ASHRAE 2%HIGH 96.8°F(36.0°C) r `\-\` NEW SUPPLY SIDE AC ASHRAE EXTREME LOW 4.4°F(-20.2°C) I \, DESIGN ENGINEER POINT OF CONNECTION CONNECTION PER NEC UTILITY EVERSOURCE \ ARTICLE 705.12(B)(2) \ / SIDDHARTH TEMBURNI PE STAMP It'!TN SIGNAT E NABCEP PVIP CERTIFIED UTILITY SERVICE 120/240V 1 CLIMATE DATA BARNSTAW :725067)BOA, I `\� ....... _ $ SID@SUMMIT.SOLAR 100A MAIN BREAKER, �A►a SOURCE MA,USA(WMO: �"� WELECTRICAL PANEL f f y PROFESSIONAL ENGINEER 200A PANEUBUS c* ✓ 1�0i%, WIND SPEED 125 MPH(ASCE 7-10) 1 , .1 MODE OF INTERCONNECTION BTM LINE SIDE TAPRISK CATEGORY II1 1 / / \ SCOTT WYSSLING iW CONSULTING SERVICE ENTRANCE UNDERGROUND , WIND EXPOSURE P.E.ri_ • CATEGORY B ' PE STRUCTURAL,PP, CME / �1: \ (0):(201)874-3483 GROUND SNOW LOAD 40 PSFS DOCUMENT DESCRIPTION ` THIS DOCUMENT HAS BEEN PREPARED FOR THE PURPOSE OF .. `<•• APPLICABLE CODES &STANDARD \s i DESCRIBING THE DESIGN OF A PROPOSED PHOTOVOLTAIC POWER �jf y'',4(,.." - \ / ► SYSTEM WITH ENOUGH DETAIL TO DEMONSTRATE COMPLIANCE WITH , -- SCOPE OF WORK MASSACHUSETTS:INTERNATIONAL _ APPLICABLE CODES AND REGULATIONS.THE DOCUMENT SHALL NOT BUILDING BE RELIED UPON AS A SUBSTITUTE FOR FOLLOWING MANUFACTURER Signed 10/3/2022 RESIDENTIAL CODE 2015 THIS PROJECT INVOLVES THE INSTALLATION OF SOLAR PANELS.THE INSTALLATION INSTRUCTIONS.CONTRACTOR SHALL INSTALL 9 SOLAR PANELS WILL BE RACKED USING A PRE-ENGINEERED RACKING EQUIPMENT IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS MASSACHUSETTS ELECTRICAL PLOT MAP THE RACKED MODULES WILL BE ELECTRICALLY CONNECTED WITH DC AND NOTHING IN THIS DOCUMENT SHALL BE INTERPRETED IN A WAY PAGE DESCRIPTION ELECTRICAL CODE(527 CMR 12.00)NFPA 70E TO AC POWER INVERTERS AND INTERCONNECTED TO THE LOCAL THAT OVERRIDES THEM.CONTRACTOR IS RESPONSIBLE FOR4 6 NEC2020 NOT TO SCALE UTILITY USING MEANS AND METHODS CONSISTENT WITH THE RULES VERIFICATION OF ALL CONDITIONS,DIMENSIONS,AND DETAILS IN THIS P FIRE 2015 NFPA 1,FIRE CODE WITH MA1111) ENFORCED BY THE LOCAL UTILITY AND PERMITTING JURISDICTION. DOCUMENT. AMENDMENTS PROJECT SUMMARY 2.1.1 SITE NOTES: LEGENDS 2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA 2.4.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 REGULATIONS. THROUGH 250.106.IF EXISTING SYSTEM IS INACCESSIBLE,OR INADEQUATE,A 2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250,NEC 690.47 UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. AND AHJ. 2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING,MECHANICAL,OR 2.4.10 ACCORDING TO NEC 690.47(C)(3),UNGROUNDED SYSTEMS INVERTER MAY SIZE DC Q &L2L BUILDING ROOF VENTS. GEC ACCORDING TO EGC REQUIREMENTS OF NEC 250.122.HOWEVER,DC GEC TO BE 0 JUNCTION BOX 2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED UNSPLICED OR IRREVERSIBLY SPUCED. p ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 2.4.11 IN UNGROUNDED INVERTERS,GROUND FAULT PROTECTION IS PROVIDED 2.1.6 ROOF COVERINGS SHALL BE DESIGNED,INSTALLED,AND MAINTAINED IN BY ISOLATION MONITOR INTERRUPTER,"AND GROUND FAULT DETECTION rd ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S PERFORMED BY"RESIDUAL-CURRENT DETECTOR." INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE 2.6.1 INTERCONNECTION NOTES: BUILDING OR STRUCTURE. 2.5.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH[NEC 690.64 J 2.2.1 EQUIPMENT LOCATIONS (B)] / 2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2.5.3 THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT 2.2.3 WRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED EXCEED 120%OF BUSBAR RATING[NEC 705.12(D)(2)(3)]. OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31(AMC)AND NEC TABLES 2.5.4 WHEN SUM OF THE PV SOURCES EQUALS>100%OF BUSBAR RATING,PV PV INVERTER EPC COMPANY 310.15(8)(2)(A)AND 310.15(B)(3)(C). DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE A-� L SUMMIT ENERGY GROUP 2.2.3 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES BUS FROM THE UTILITY SOURCE OCPD[NEC 705.12(D)(2)(3)]. 'q'q ACCORDING TO NEC 690.34. 2.5.5 AT MULTIPLE INVERTERS OUTPUT COMBINER PANEL,TOTAL RATING OF ALL AA Eb/o Om 2.2.4 ADDITIONAL AC DISCONNECT(S)SHALL BE PROVIDED WHERE THE INVERTER IS NOT OVERCURRENT DEVICES SHALL NOT EXCEED AMPERAGE OF BUSBAR.WITHIN SIGHT OF THE AC SERVICING DISCONNECT. HOWEVER,THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED UNIT 250,W 293 LIBBEY INDUSTRIALPKWY, H, 2.2.5 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC 705.12(D)(2)(3)(C). LINE ACCORDING TO NEC APPLICABLE CODES. 2.5.6 FEEDER TAP INTERCONNECTION(LOAD SIDE)ACCORDING TO NEC 705.12 MA 02189,USA 2.2.6 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR (D)(2)(1) O o NON FUSIBLE 888.878.8848 USAGE WHEN APPROPRIATE. 2.5.7 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12(A)WITH AC DISCONNECT www.summRsolar•mrgy.com 2.3.1 STRUCTURAL NOTES: SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.3.2 RACKING SYSTEM&PV ARRAY WILL BE INSTALLED ACCORDING TO 2.5.8 BACKFEEDING BREAKER FOR UTIUTY-INTERACTIVE INVERTER OUTPUT IS LOAD CUSTOMER DETAILS CODE-COMPLIANT INSTALLATION MANUAL.TOP CLAMPS REQUIRE A EXEMPT FROM ADDITIONAL FASTENING[NEC 705.12(D)(5)J. DESIGNATED SPACE BETWEEN MODULES,AND RAILS MUST ALSO EXTEND A 2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, 2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH ppp3 ACCORDING TO RAIL MANUFACTURER'S INSTRUCTIONS. IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO LINE O O I < 2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS'SPECIFICATIONS. THE TERMINALS MARKED"LINE SIDE"(TYPICALLY THE UPPER TERMINALS). IF ROOF-PENETRATING TYPE,IT SHALL BE FLASHED A SEALED PER LOCAL 2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL,BE t1y1 S REQUIREMENTS. LOCKABLE,AND BE A VISIBLE-BREAK SWITCH. FUSIBLE IL W S M St AC DISCONNECT W �p) L7 2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND 2.6.4 BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED. O Z Z N z SFAI FD W/APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED THEREFORE BOTH MUST OPEN WHERE A DISCONNECT IS REQUIRED. LOAD -3 W J o rn P CONTRACTOR. ACCORDING TO NEC 690.13. �a Z 0 p< 03 2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE 2.6.5 DC DISCONNECT INTEGRATED INTO ROOFTOP DC COMBINER OR INSTALLED — CO 0 y 0.'2 to DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. WITHIN 6 FT,ACCORDING TO NEC 690.15(C). CO Lu m H N 2.3.6 WHEN POSSIBLE,ALL PV RELATED RACKING ATTACHMENTS WILL BE 2.6.6 RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY 111 g STAGGERED AMONGST THE ROOF FRAMING MEMBERS. OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS.CONTROLLED < Z 7 Z 0- 2.4.1 GROUNDING NOTES: CONDUCTORS 530V AND 6240VA[NEC 690.12].LOCATION OF LABEL CilUTILITY/NET METER O = LU 2.4.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE,AND ACCORDING TO AHJ. BIDIRECTIONAL m 2 GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH 2.6.7 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8,690.9, 0_ USE. AND 240. N Y Z 2.4.3 AS IN CONVENTIONAL PV SYSTEMS,UNGROUNDED PV SYSTEMS REQUIRE AN 2.6.6 BOTH POSITIVE AND NEGATIVE PV CONDUCTORS ARE UNGROUNDED, p EQUIPMENT GROUNDING CONDUCTOR.ALL METAL ELECTRICAL EQUIPMENT AND THEREFORE BOTH REQUIRE OVER-CURRENT PROTECTION,ACCORDING TO ...9.1.1.1... STRUCTURAL COMPONENTS BONDED TO GROUND,IN ACCORDANCE WITH 250.134 OR NEC 240.21.(SEE EXCEPTION IN NEC 690.9) i��/► UTILITY ELECTRIC 250.136(A).ONLY THE DC CONDUCTORS ARE UNGROUNDED. 2.6.9 IF REQUIRED BY AHJ, ,�, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION GRID PROJECT ID:MANG9.48-2020 2.4.4 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM ACCORDING TO NEC 690.11 AND UL1699B. ,♦, PREPARED ON:10/1/2022 NEC TABLE 250.122. 2.7.1 WIRING&CONDUIT NOTES: 2.4.5 METAL PARTS OF MODULE FRAMES,MODULE RACKING,AND ENCLOSURE 2.7.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. DRAWN BY: UNIRAC CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE CHECKED BY: S.T. 2.4.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CUPS AS SHOWN IN REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ.IF WEEBS ARE 2.7.3 ALL CONDUCTORS SIZED ACCORDING TO NEC 690.8,NEC 690.7. STAMPED BY: S.W. NOT USED,MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED 2.7.4 EXPOSED UNGROUNDED PV SOURCE AND OUTPUT CIRCUITS SHALL USE WIRE UTILITY:EVERSOURCE GROUNDING LUG HOLES PER THE MANUFACTURERS'INSTALLATION LISTED AND IDENTIFIED AS PHOTOVOLTAIC(PV)WIRE[690.35(D)].PV UTILITY/NET METER I REQUIREMENTS. MODULES WIRE LEADS SHALL BE LISTED FOR USE WITH UNGROUNDED �1�// BIDIRECTIONAL PE STAMP WITH SIGNA 2.4.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT SYSTEMS,ACCORDING TO NEC 690.35(D)(3). Q WITH METER MAIN THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO 2.7.5 PV WIRE BLACK WIRE MAY BE FIELD-MARKED WHITE(NEC 200.6(A)(6)]. ANOTHER MODULE. 2.7.6 MODULE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY. - ` 2.4.8 GROUNDING AND BONDING CONDUCTORS,IF INSULATED,SHALL BE COLORED 2.7.7 ACCORDING TO NEC 200.7.UNGROUNDED SYSTEMS DC CONDUCTORS 111 0f GREEN OR MARKED GREEN IF#4 AWG OR LARGER[NEC 250.119] ® li A. • 4 -::-I- oCOLORED OR MARKED AS FOLLOWS: FIRE SETBACK FLASHING DC/OC POWER _DC POSITIVE-RED,OR OTHER COLOR EXCLUDING WHITE,GRAY AND ATTACHMENT OPTIMIZERS • GREEN DC NEGATIVE-BLACK,OR OTHER COLOR EXCLUDING WHITE,GRAY SOLAR MODULES EGC&GC a • / AND GREEN ON THE —STRINGS BONDED AND N,u'ONAL E7+1a 2.7.8 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: 1 ROOF/GROUND BLACK RAIL = GROUNDED PHASE A OR LI-BLACK 0 0 BACK FEED S(gn•d 'I OI3/2022 PHASE B OR L2-RED,OR OTHER CONVENTION IF THREE PHASE BREAKER SMART/ �� RESIDENTIAL PHASE C OR L3-BLUE,YELLOW,ORANGE',OR OTHER CONVENTION - O N I TESLA BATTERY OPTION NEUTRAL-WHITE OR GRAY 0 CORODUCTION / PAGE DESCRIPTION •IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE ELECTRIC O METER � TO BE MARKED ORANGE[NEC 110.15]. WIRE TAPS P V 2 GENERAL PROJECT NOTES •• • NOTE:THIS DOCUMENT HAS BEEN CREATED FOR THE PURPOSE OF DESCRIBING THE DESIGN OF A PROPOSED r-PROPERTY LINE PHOTOVOLTAIC POWER SYSTEM WITH ENOUGH DETAIL / TO DEMONSTRATE COMPLIANCE WITH ALL APPLICABLE / CODES AND REGULATIONS.THE DOCUMENT SHOULD / NOT BE RELIED UPON AS A SUBSTITUTE FOR FOLLOWING r--- / SHALLMANU INSTALL AIL EQUIPMENTION MIN ACCORDANCE LERWITH I \,�\ /-UTILITY/ NET METER SHALL INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THISMAN DOCUMENT INSTSHOULD BEIN MANUAINTERPRETED ING IN • \� /r-AC DISCONNECT THIS DOCUMENT SHOULD INTERPRETED IN A WAY \. / THAT OVERRIDES THE INSTRUCTIONS IN I \� // • MANUFACTURER INSTALLATION MANUALS. I I. `\ %j/-SMART METER I \.\ INVERTER / r 1 I W %i�/�\�\� EPC COMPANY: (J1 i \- SUMMIT ENERGY GROUP zI N /1 \'\. J r p RIV EW AY 293 LIBBEY INDUSTRIAL PKWY, //// \ UNIT 250,WEYMOUTH, r// \� MA 02189,USA Q I d \.\` 888-678-6648 -MAIN SERVICE PANEL \'\, wwwsummitsolarenergy.eom I CUSTOMER DETAILS Q _, (INSIDE) m I 66' KERCAN(INSIDE) %/ Q__ _CL zr _ 3 ww5Oco U ZN Q Io ± iTT7.74 / o a wARRAY 1---- , ¢Et z ui N I #18,REC 395AA / a o w #18,SE S440 CI m 04¢ aTILT 45° 1 > 0 ARRAY 2-- / _16 1'- #6,REC 395AA PROJECT ID:MANG9.48-2020 I / PREPARED ON:10/1/2022 \ #6,SE S440 \ TILT 45° CS1 / DRAWN BY' UNIRAC 1 CHECKED BY: S.T. 1 STAMPED Y. S.W. \ `\ ,^ UTILITY:EVERSOURCE I PE STAMP WITH SIGNA •tE .\ / 0�AA CJ! '� N I V I. --- ._--_____.__--— W .-_ B Signed 10/3/2022 \ O PLOT PLAN PV 3 SCALE:1'0"=1'0" BUCK ISLAND ROAD PAGE DESCRIPTION s PLOT PLAN NOTE 1:EQUIPMENT LIKELY TO BE WORKED UPON WHILE ENERGIZED SHALL BE INSTALLED IN LOCATIONS THAT SATISFY MINIMUM WORKING ®AC D SM SYSTEM INFORMATION - CLEARANCES PER NEC 110.26. DC SYSTEM SIZE 9.48I KW 113 NOTE 2:CONTRACTOR SHALL USE ONLY COMPONENTS LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY FOR THE ^� MS P AC SYSTEM SIZE 7.60 KW INTENDED USE.. `/ DC/AC RATIO 1.25 NOTE 3:CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL RELATED EQUIPMENT,CABLES,ADDITIONAL CONDUITS,BOXES,RACEWAYS,AND MODULE REC SOLAR ALPHA PURE OTHER ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL BLACK SERIES 395W PV SYSTEM. NOTE 4:THE SYSTEM SHALL COMPLY WITH NEC ARTICLE 690,ALL MLPE/INVERTER SOLAREDGE TECHNOLOGIES, MANUFACTURERS LISTING AND INSTALLATION INSTRUCTIONS,AND THE 5440,SE7800H-USRGM RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING TOTAL ARRAY AREA 480.0 SQ.FT. JURISDICTION'S(AHJ)APPLICABLE CODES. ----20.3� - NOTE 5:WHERE DC PV SOURCE OR DC PV OUTPUT CIRCUITS ARE RUN NO.OF MODULES 24 INSIDE THE BUILDING,THEY SHALL BE CONTAINED IN METAL RACEWAYS, ARRAY 1 AZIMUTH 262° TYPE MC METALCLAD CABLE,OR METAL ENCLOSURES FROM THE POINTITCH q5° EPC COMPANY: OF PENETRATION INTO THE BUILDING TO THE FIRST READILY ACCESSIBLE ARRAYARRAA 2 1 AZIMUTH 26 SUMMIT ENERGY GROUP DISCONNECTING MEANS,PER NEC 690.31(G) NOTE 6:ABOVE DIMENSIONS ARE FOR THE RESPECTIVE ROOF PLANES ARRAY2 PITCH 45° MEASURED BETWEEN THE ROOF RIDGE TO THE EVE AND RAKE TO RAKE UTILITY NAME EVERSOURCE 293 LISBEY INDUSTRIAL PKWY, UNIT 250,WEYMOUTH, MA 02189,USA LEGENDS: 888-678.664E www.summits Olarenergy.com MO UTILITY/NET METER O et, CUSTOMER DETAILS IMSPl MAIN SERVICE PANEL )-_ . IACDI AC DISCONNECT Nn BREAKER CAN J` 0 = n< a v WITH 40A MAIN BREAKER ri N rn W U � ' Z IQ INVERTER z o -1< rn SM MA SMART METER On In <1 V) W U m F H n REC 395AA Ni J T a 4 w _STRINGS,MINIMUM 8 MODULES V, c m 0 a Q AND MAX 6000W PER STRING N =0 -------ARRAY 1 "`- Z U I I1 MODULE CLEARANCE #18, REC 395AA Cn i A \ #18, SE S440 PROJECT ID:MANG9.48-2020 PREPARED ON:10/1/2022 TILT 45° DRAWN BY: UNIRAC CO01 CHECKED BY: S.T. Lis_ O STAMPED BY: S.W. `' �� 3.34' UTILITY:EVERSOURCE -ARRAY 2 PE S7AMP WITH SIGMA if Ni #6, REC 395AA .►.' t N ; „ 4 , #6, SE S440 REC ALPHA PURE BLACK `+ , SERIES,REC395AA,395W TILT NOTE:THIS DOCUMENT HAS BEEN CREATED FOR THE A, .'.- /2 :: N PURPOSE OF DESCRIBING THE DESIGN OF A PROPOSED - PHOTOVOLTAIC POWER SYSTEM WITH ENOUGH DETAIL TO DEMONSTRATE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS.THIS DOCUMENT SHOULD NOT BE RELIED 16.1 � Signori 10/3/2022 UPON AS A SUBSTITUTE FOR FOLLOWING MANUFACTURER j__ a - INSTALLATION MANUALS.INSTALLER SHALL INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER 41, Illo SITE PLAN PAGE DESCRIPTPES4ION INSTALLATION MANUALS.NOTHING IN THIS DOCUMENT SHOULD BE INTERPRETED IN A WAY THAT OVERRIDES THE SCALE:1'O"=1'O" INSTRUCTIONS IN MANUFACTURER INSTALLATION MANUALS. S SITE PLAN I— Z oZ a 13 -....-1 od_ I I I I 11"H. I I 1 EPC COMPANY: Cr I I I SUMMIT ENERGY GROUP 293 LIBBEY INDUSTRIAL PKWY, UNIT 250.WEYMOUTH, • • I • 0 MA 02189,USA -♦ • • 888-678-6648 1 )1( www.summitsolarenergy.eom ■ • • • CUSTOMER DETAILS 1tam o LEGENDS I co co _ I • I N O) UNIRAC SM LIGHT DARK • • • h---- ----2"X8" RAFTERS o"w Z Z w J O O Q W �'_-'a FLASHLOC ---@-16" O.C. o c cc 2 h w c_ Y x m I v • • 1 • • ARRAY 1 Q w J aO o w WALLNOTE 1:DIMENSIONS IN RED INK MEASURES THE I I I • • • I #1 H, REC 395AA m = 2 HORIZONTAL DISTANCE BETWEEN RIDGE AND THE SIDEI ca Q d Z NOTE 2:MOUNTS/ATTACHMENTS SHOULD BE I #1 8, SE S440 } 0 INSTALLED AS PER MANUFACTURER'S INSTRUCTIONS NOTE 3:FLASHINGS ONCE INSTALLED SHOULD BE I TILT 45° SEALED TO WATER TIGHT PROJECT ID:MANG9.48-2020 NOTE 4:IF THE ROOF IS DETERMINED TO BE WEAK AT —11-1---ram I p PREPARED ON:10/1/2022 THE INSTALL,STOP THE WORK AND NOTIFY THE • I I DRAWN BY: UNIRAC PROJECT ENGINEER ----ARRAY 2 CHECKED BY: S.T. DEAD LOAD CALCULATIONS • • I #6 REC 395AA STAMPED BY: S.W. LOAD QTY. LBS. TOTAL LBS • • I ,UTILITY.EVERSOURCE MODULES 24 45 1080 I #6, SE S440 PE STAMP WITH SIGNA tE OPTIMIZERS 24 1.70 41 — T I TILT 45° A,,►►,►a LINEAR FEET OF RAIL(ft.) 162 0.4 65 1 FLASHLOC 55 0.09 5 • • • • -.Ili - 2"X6" RAFTERS ►��.' ot SIMPLE GRIP-SQ 0 0.09 0 - ° • MID CLAMPS 38 0.09 3 @ 1 6" O.C. ,,,,,,Li END CLAMPS 20 0.09 2 -mil- 1 01 _► W GROUND EEBS 5 0.09 0 MISC.HARDWARE 0 TOTAL ARRAY WEIGHT 1196 AREA NAME QTY. SQ.FT. TOTAL SQ.FT. Signed 10/3/2022 MODULES 24 20 480.00 ATTACHMENT PLAN TOTAL ROOF AREA - _ - PAGE DESCRIPTION 41111 OF ROOF AREA COVERED BY SOLAR PV(-/-) - SCALE:1'0"=1'0" PV POINT LOAD(TOTAL ARRAY WI/ATTACHMENTS),Lbs/Sq.ft. 22 DIST.LOAD(TOTAL ARRAY WT/TOTAL SO.FT.),Lbs/Sq.ft. 2.49 ATTACHMENT DIAGRAM PART TABLE P/N DESCRIPTION 004085M FLASHLOC COMP KIT MILL, 20 PACK SOLARMOUNT STANDARD RAIL 004085D FLASHLOC COMP KIT DARK, 20 PACK Z2L END CAP 5�16"x4"SS LAG BOLT ,` -t. W/SS E DM BONDED WASHER EPC COMPANY: _` 1ab.i SS SERRATED T BOLT SUMMIT ENERGY GROUP 1111 � :�. 293 LIBBEY INDUSTRIAL PKWY, 1"1\�=�71 '' UNIT 250,WEYMOUTH, SS SERRATED FLANGE NUT ,var L! \FLASHLOC BASE www.summitsolarenergv.com 3 MILL OR DARKiL� UNIRAC RAIL: LIGHT/STD CUSTOMER DETAILS 0 !JI za 2 " 81 OWOw Izo g �\^' UNIVERSAL AF UNIVERSAL AF COLo o ICI �� END CLAMP MID CLAMP I- Lii J p w 2 ii, m D_ d gg } Z �/�UNIRB,c � ' Q V Q` /1in. I I I I PROJECT ID:MANG9.48-2020 All D 22 _ UNIR PREPARED ON: C DRAWN BY: UNIRA 6 i" All �I CHECKED BY: S.T. 111�- STAMPED BY: S.W. I 30mm to /jJ' 30mm to UTILITY:EVERSOURCE MODULE FRAME MODULE FRAME •� I" }• PE STAMP WITH SIGMA 2E t ►1►1 r®�mII r�l�l "I I I I I I I I a. -_ ''-'.'")^,,/,,.V.,,,,, FLASHLOC ATTACHMENT 4111 UNIVERSAL END AND MID CLAMP Signed 10/3/2022 O PAGE DESCRIPTION PV 6 ATTACHMENT DETAILS NOTE 1:ALL EQUIPMENT SHALL BE PROPERLY GROUNDED PER THE REQUIREMENTS OF NEC ARTICLES MARKED GREEN IF#4AWG OR LARGER 250&690 NOTE 7:DISCONNECTING MEANS SHOULD BE ACCESSIBLE WITHIN 10'OF THE SUPPLY SIDE NOTE 2:PV MODULES SHALL BE GROUNDED TO MOUNTING RAILS USING MODULE LUGS OR RACKING CONNECTION,IT CAN BE A FUSED DISCONNECT OR A MANUALLY OPERATED CIRCUIT BREAKER INTEGRATED GROUNDING CLAMPS AS ALLOWED BY LOCAL JURISDICTION.ALL OTHER EXPOSED METAL NOTE 8:INSTALLATION SHOULD BE NEC 2020 CODE COMPLIANT PARTS SHALL BE GROUNDED USING UL-LISTED LAY-IN LUGS. NOTE 9:EQUIPMENT SHOULD BE SERVICE RATED NOTE 3:GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE NOTE 10:WIRE SIZING SHOULD BE AS PER 690.31(NEC 2020) NOTE 4:AC SYSTEM GROUNDING ELECTRODE CONDUCTOR(GEC)SHALL BE A MINIMUM SIZE#8AWG NOTE 11:NEUTRAL AND GROUND SHOULD BE BONDED ONLY ONCE WHEN INSULATED,#6AWG IF BARE WIRE. NOTE 12:A SEPARATE GROUND ROD MUST BE INSTALLED FOR SOLAR PV AS PER 250.52 A(1)THROUGH (41""" NOTE 5:EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC ARTICLE 690.45, A(8)TO MEET NEC 2020 REQUIREMENTS. THE ADDITIONAL GROUND ROD IS NOT REQUIRED AS PER AND BE A MINIMUM OF#10AWG WHEN NOT EXPOSED TO DAMAGE,AND#6AWG SHALL BE USED WHEN 250.53 A(2)EXCEPTION WHICH READS IF A SINGLE ROD,PIPE,OR PLATE GROUND ELECTRODE HAS A EXPOSED TO DAMAGE RESISTANCE TO EARTH OF 25 OHMS OR LESS. NOTE 6:GROUNDING AND BONDING CONDUCTORS,IF INSULATED,SHALL BE COLOR CODED GREEN,OR WIRE SIZING SCHEDULE EPC COMPANY WIRE ID GAUGE DESCRIPTION SUMMIT ENERGY GROUP A 8 AWG THWN-2 COPPER EGC WIRE FROM JUNCTION BOX-GEC.#6 BARE CU WIRE ON THE ROOF BETWEEN THE RAILS 293 LIBBEY INDUSTRIAL PKWY, B 10 AWG PV WIRE COPPER MODULES AND DC OPTIMIZER WIRE TO JUNCTION BOX UNIT 250,WEYMOUTH, MA 02189,USA C 10 AWG THWN-2 COPPER JUNCTION BOX TO INVERTER 888-678-6648 D,E 8 AWG THWN-2 COPPER INVERTER-SMART METER-AC DISCONNECT-BREAKER CAN www.summitsolarsnergy.com F 6 AWG THWN-2 COPPER BREAKER CAN-LINE SIDE TAP-MAIN SERVICE PANEL-GRID CUSTOMER DETAILS SYSTEM SUMMARY COMMUNICATION DIAGRAM STRING 1 STRING 2 STRING 3 SINGLE INVERTER MULTIPLE INVERTERS a o OPTIMIZER MAXIMUM OUTPUT CURRENT 15A 15A 15A a u)�uu N OPTIMIZERS IN SERIES 12 12 71 la El ai 5 m 6 z NOMINAL STRING VOLTAGE 480Vdc • (c )) 17. DC OPERATING CURRENT 20.4A =I =I #I T` z o o¢ m TOTAL ARRAY STC POWER 9480 Wdc/ 7600 Wac SPORT AL E `,'�/ Y W <Q-' O=DAISY CHAIN DAISY CHAIN F COMMUNICATION SE 5 YR-GSM CELL KIT g �(R)) U CO H w a INVERTER MAX INPUT DC/MAX OUTPUT AC 20.9Adc/32Aac Sc w„EoGE It Z o o W INVERTER MAX INPUT DC POWER 11780Wdc r _ PORTAL `4�' - _ ALLOWABLE MIN/MAX STRING POWER MIN 8 MODULES IN SERIES/MAX 6000W IN A STRING _ 0-1 m Y o z BOA,240V AC NON FUSIBLE U SOLAREDGE TECHNOLOGIES o , o SE7600H-USRGM,NEMA 3R,UL LISTED, DISCONNECT INTEGRATED GFDI AND DC DISCONNECT. LOCKABLE,NEMA 3R, BREAKER CAN 240V PROJECT ID:MANG9.48-2020 EQUIPPED WITH RAPID SHUT DOWN MA SMART UL LISTED WITH 40A MAIN BREAKER N BIDIRECTIONAL PREPARED ON:10/1/2022 SOLAR EDGE METER SOCKET. GANG OPERATED, INDOOR RATED UTILITY METER GRID S440 OPTIMIZER FORM 2S,200A OPEN BLADE DRAWN BY: UNIRAC 24-REC 395AA = READILY ACCESSIBLE UL LISTED 120I240V 1 OPTIMIZER PER MODULE 120/240V WITHIN 10'OF THE TAP METER#2269 468 CHECKED BY: S.T. NEMA 3R 3'WITHIN UTILITY METER u STAMPED BY: S.W. ...00 i I. UTILITY EVERSOURCE a JUNCTION BOX i ta�F F • SUPPLY SIDE PE STAMP WITH SIGNATURE sooV,UL LISTED 1Ga �N INTERCONNECTION ---- I G 1 UNE UNE— LINE—�M` AS PER 705.12(B)(2) ____ Q i G o ND ° --MAIN BONDING JUMPER C2 I d O LOAD—L LOAD V _ni,.,1 1 C I L--- ------ V 1- I I 1 A 200A MAIN SERVICE PANEL._ 1 2 3 0 0 0 0 0 11 12 I I 100A MAIN BREAKER ____ ______L__� 120I240Vac ___ o BRYANT D D PAGE DESCRIPTION PV 7 ELECTRIC DIAGRAM BILL OF MATERIALS CATEGORY MAKE&MODEL QTY DESCRIPTION MODULE REC SOLAR ALPHA PURE BLACK SERIES 395W 24 REC 395AA,MONO-CRYSTALLINE BOB INVERTER SOLAREDGE TECHNOLOGIES SE7600H-USRGM 1 HD WAVE SETAPP INVERTER SE7600H-USRGM W/RGM&CONSUMPTION METER0416: 1:\ POWER OPTIMIZERS SOLAR EDGE S440 24 SOLAR EDGE S440 DC OPTIMIZERS(ONLY WITH SE INVERTERS) COMMUNICATION CELL KIT SOLAREDGE CELL-B-R05-US-S-S2 CELL 1 MODEM WITH 5 YRS FOR RESIDENTIAL SETAPP INVERTERS CT CLAMPS SOLAR EDGE SEACT0750-200NA-20 200 CT - SOLAR EDGE CTs ONLY FOR SUNNOVA PROJECTS AC COMBINER PANEL 100A COMBINER EATON OR EQUI. - 60A,240V 3W 1PH AC COMBINER PANEL,NEMA 3R AC FUSIBLE DISCONNECT SQUARE D DU222NRB OR EQUIV. - 60A,OVER CURRENT PROTECTION DEVICE AS LISTED IN NEC 2020 — AC NON FUSIBLE DISCONNECT SQUARED DU222RB OR EQUIV. 1 60A,OVER CURRENT PROTECTION DEVICE AS LISTED IN NEC 2020 EPc COMPANY; - DC NON FUSIBLE DISCONNECT SQUARE D OR EQUIV. - 60A OVER CURRENT PROTECTION DEVICE AS LISTED IN NEC 2020 SUMMIT ENERGY GROUP JUNCTION BOX EQUIVALENT JUNCTION BOX 1 DC COMBINER ENCLOSURE,600VDC,120A,UL1741,NEMA 3R,CSA C22.2 293 LIBBEY INDUSTRIAL PKWY, FUSES BUSS FUSETRON OR EQUI. - 40A,240VAC FUSES UNIT 250,WEYMOUTH, BREAKER CAN EATON OR EQUI. 1 40A,2P MODE OF INTERCONNECTION,MAX RATED VOLTAGE:240VAC MA 02189,USA 888-678-6648 SMART METER SQUARE D OVERHEAD OR UNDERGROUND METER SOCKET 1 200A,120/240V,NEMA 3R SMART METER SOCKET www.summitsolarenergy.com CONDUIT RUN EMT TBD ONSITE i"OR 1"EMT CONDUIT RUN SHOULD BE INSTALLED AS PER THE CODE CUSTOMER DETAILS TRENCH RUN RIGID PVC SCHEDULE 80 TBD ONSITE TRENCH SHOULD BE AT LEAST 18"DEEP.USE WARNING TAPE DURING BACKFILL 0 H< v v x �(D oz ZN D Z O Z o< ip i§ COMPONENT SPECIFICATIONS °w a- . w MODULES 0 0- U 0E- LLl Lu MAKE&MODEL QTY. PMAX PTC ISC VOC VMP TEMP.COEFF. FUSE • ' Q w O OF VOC RATING N>- ° Z REC ALPHA c3 PURE BLACK 24 395W 376.63W 10.20A 48.7V 41.8V -0.24%/°C 25A o PROJECT ID:MANG9.48-2020 POWER OPTIMIZERS PREPARED ON:10/1/2022 MAXIMUM MAXIMUM DC DRAWN BY: UNIRAC MAKE&MODEL RATED INPUT QTY. OUTPUT INPUT MAXIMUM DC WEIGHTED CHECKED BY: S.T. POWER CURRENT CURRENT VOLTAGE EFFICIENCY 'STAMPED BY: S.W. SOLAR EDGE S440 440W 24 15A 14.50A 60V 98.6% UTILITY:EVERSOURCE PE STAMP WITH SIGNATURE INVERTER MAKE& QTY. AC GROUND RATED OUTPUT MAX INPUT MAX INPUT WEIGHTED MODEL VOLTAGE POWER CURRENT CURRENT VOLTAGE EFFICIENCY SOLAR EDGE 1 240V FLOATING 7600W 32A 20A 480V 99% 7600H-US RAIL AND MOUNTS RAIL RAIL MOUNTS TYPE LENGTH #OF RAILS #OF #OF MID #OF END #OF MODEL MOUNTS CLAMPS CLAMPS GLUGS •SM LIGHT UNIRAC FLASHLOC ALL DARK 14'EACH 14 55 38 20 5 DARK PAGE DESCRIPTION PV 8 BILL OF MATERIALS ON METERS, SERVICE PANELS, CONDUITS INVERTER, AC DISCONNECTS WARNING:p PHOTOVOLTAIC AWARNING PHOTOVOLTAIC SYSTEM WARNING AC DISCONNECT ON ALL CONDUITS,OWERISOURCE TURN OFF PHOTOVOLTAIC ELECTRIC SHOCK HAZARD A WARNING/ DUAL POWER SUPPLY AC DISCONNECT PRIOR TO IF GROUND FAULT IS INDICATED SOURCES UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM ' - DC JUNCTION BOX WORKING INSIDE PANEL ALL NORMALLY GROUNDED ELECTRIC SHOCK HAZARDCI7Lc oMPANr CONDUCTORS MAY BE DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES SUMMIT ENERGY GROUP ON MAIN SERVICE PANEL ON JUNCTION BOX ON ROOF UNGROUNDE4D AND ENERGIZED MAY BE ENERGIZED IN THE OPEN POSITION ON INVERTER OPERATING VOLTAGE VOLTS 293 LIBBEY INDUSTRIAL PKWY, PHOTOVOLTAIC ! WARNING OPERATING CURRENT=AMPS UNIT 250,WEYMOUTH, MA 02189,USA SYSTEM kWh METER DUAL POWER SUPPLY ON AC DISCONNECT INSIDE AND OUTSIDE 888-678-6648 PHOTOVOLTAIC SYSTEM NEXTTOMEIER www.summitsolarenergy.com ON SMART METER SOCKET EQUIPPED WITH CUSTOMER DETAILS SOURCES:UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM RAPID SHUTDOWN SOLAR PV SYSTEM EQUIPPED PHOTOVOLTAIC SYSTEM ON ALL AC DISCONNECTS WITH RAPID SHUTDOWN /t\DC DISCONNECT ON UTILITY METER.MAIN SERVICE PANEL //\\ HD m TURN RAPID / \ 0 V)I`'7 N 3 ' 1 SHUTDOWN SWITCH S N TO THE"OFF' ECTA N W n z OPERATING VOLTAGE VDC /I\ WARNING POSITION TO SHUT °PAN E`S o Z •Z o DOWN PV SYSTEM AND OPERATING CURRENT AMPS_ REDUCE SHOCK Z p i MAX SYSTEM VOLTAGE VDC SOLAR CIRCUIT HAZARD IN THE O S, oSHORT CIRCUIT CURRENT AMPS ARRAY. ■ Y i BREAKER IS BACKFED :H- U z D di CL CL ON SMART METER SOCKET DO NOT RELOCATE NEC 690.66(C)(1)(a) X O O w THIS OVERCURRENT DEVICE m 2 a a ON INVERTER N< Z ON MAIN SERVICE PANEL WHEN USING } 0 BACK FEED p ESS PROJECT ID:MANG9.48-2020 PREPARED ON:10/1/2022 DRAWN BY: UNIRAC ENERGY STORAGE ESS- CHECKED BY: S.T. RATED FREQUENCY: A .A ' ING AWARNING STAMPED BY: S.W. SYSTEM DISCONNECT PHASES:_ UTILITY EVERSOURCE RATING(kW/kVA):_ AVAILABLE FAULT CURRENT DUAL POWER SUPPLY ELECTRIC SHOCK HAZARD PE STAMP WITH SIGNATURE NOMINAL ESS AC VOLTAGE: (AT OUTPUT TERMINALS):_ MAXIMUM ESS DC VOLTAGE: MAXIMUM (AT UT ANDOUTPUTPUT TERMINALS):INPUT CURRENT SOURCES: UTILITY GRID AND (AT OUTPUT TERMINALS ON THE LINE AND MAXIMUM OUTPUT AND INPUT VOLTAGE PV SOLAR ELECTRIC SYSTEM ON ESS DISCONNECT (AT OUTPUT TERMINALS):_ LOAD SIDES MAY BE ENERGIZED UTILITY-INTERACTIVE CAPABLE:_ UTILITY GRID,ESS AND PV SOLAR ELECTRIC IN THE OPEN POSITION SYSTEM ONATS,INVERTER,BATTERY CABINET ON THE NET METER NOTE:PLACARD FORMAT IS PROVIDED FOR REFERENCE.INFORMATION FROM RAPID SHUTDOWN RAPID SHUTDOWN PVT,THE SINGLE LINE DIAGRAM WILL BE ADDED AND INSTALLED ON ALL DISCONNECT 1/2 DISCONNECT 2/2 APPLICABLE UTILITY,STATE AND LOCAL REQUIRED PLACARDS USED FOR THIS INSTALLATION BEFORE PROJECT INSPECTION AND COMPLETION PA GE DESCRIPTION ON ESS DISCONNECT ON INTERACTIVE SYSTEM DISCONNECT PV 9 PV LABELS CAUTION POWER TO THIS BUILDING IS SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN N, 8 I-UTILITY/NET METER,`, 1rAC DISCONNECT K,..___ ^I-^" �,rSMART METER EPC COMPANY.- DRIU 1 q,,%/-INVERTER SUMMIT ENERGY GROUP Z O'v: --I ' .MAIN SERVICE PANEL 293 LIBBEY INDUSTRIAL PKWY, 0 (INSIDE) UNIT 250.VVEYMOUTH, �/ 1110---BREAKER CAN MA 02189,USA Q (INSIDE) 888-678-6648 0 www_summitsolarenergy.com CO ::: CUSTOMER DETAILS Q :::1i1 -HOUSE 0 CO I♦�� • • (O a v w ---SOLAR ARRAY uW)V m a' 0 II ONROOFTOP -,Z Z 0rn 17, — Oo CO j ¢ o w U m 1 Q Q Z, CC VBUCK ISLAND ROAD Lu a M � 5 03 ix a c,} Z 0 0 PROJECT ID:MANG9.48-2020 DIRECTORY PREPARED ON:10/1/2022 PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE DRAWN BY. UNIRAC SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. CHECKED BY S.T. STAMPED BY: S.W. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN:NEC UTILITY:EVERSOURCE 690.56(B)&(C),[NEC 705.10]) PE STAMP WITH SIGNATURE THE REQUIREMENTS FOR THE PLACARD ARE: -MADE OF METAL OR HARD PLASTIC -HAVE A RED BACKGROUND WITH WHITE ENGRAVING -LETTERS SHOULD BE 9MM(1/4")TALL(COMPARABLE TO 25 POINT ARIAL FONT) PAGE DESCRIPTION PV 9.1 PLACARD • SOLAR'S MOST TRUSTED RCC SOLARSMDRCC TRUSTED PRODUCT SPECIFICATIONS At?'X\ .A ten•un1.7.o.n CERTIFICATIONS Llt�tl gel •_ 46011511 - IEC E1215.22161CC 51730201E UL:173, .— .._• _._— 1 ....___. "-., :EC621304 PlD 193.714.091 5EC61/01 52115451 OPM131♦ 6(62/16 Am^.mra Resistance O11925.2 Ignitan IRy8tass 9 Y 68.84 G EPC COMPANY IEC 62782 Dynamic Mrzlrvaltoaa pa4IDm1 — !E WC6121522016 HaasIawl351818 SUMMIT ENERGY GROUP "T £ _ 2 EC62321 Lhaeucp RW5E8863/2015 : --,:. a g ,� eoMoolma:se9oo1m15aFsnseml:.m]ec6au! 16 • S L Irew.r 293 LIBBEY INDUSTRIAL PKWY, f)1r1 y1,s'q..„ is 1-,..,, s i w o G❑0 c•+,N .- UNIT 250,WfYMOUTH, 1 "- "fT'`' 3 p0 unN MA 02189,USA WARRANTY' 888-678-6648 xis..as 1)001473I — Standard REC Plena, ti rod.on �—� www.summitsolarenergy.com = 1 153.714951 $o1r RR NTY' w.t fast No Yes Yes e e k._ ...__-_._.,,_ .._.--.--_�_ - .-_.... • sMwnsu All 425kW 15-5004W CUSTOMER DETAILS as0/1 aaspN >•)116 A - Prm.n:Waranty.Yr•1 20 25 25 --. _---- .__.I 30(1.91 P.m-W.wo.44 s) 25 25 25 ,_, •a<.t.. .•mr,nmenfni L Labor INw arty(yrs) 0 25 10 "' +w Powr In Year 98% 98% 98% I—(I) OD GENERAL DATA M1wM Dagrada.., On% 025% 025% d cn D N O) Ia2o.t<o1REr 1818•8rc M!s SFaoWMCaw-6014551414,,onI Pones Inv 25 92% 92% 92% W W n 0 Cell typo. wan lead rree,gapie, nrdogy Connectors a.cwn.nceramKC6265z ,,.,t,w Iw Mtarsronat.wnapW w 0 6slrilgsnf22 N In IP5aw4Ywt•^trarv...d O Z Z 09 .— Z 32 melerglasswan amm•sdreaae IIm•1>m MA%IMUMRATINGS` Z W —I o m Q Glass. Cable. O Q 1 _ anlranerhre sutace treatment v,rcwaan<.taF.Etasa6re Oywauna l«ryre,lure 40_035•C O cn- W 2 8p W "•^ i'la+..rm. «: Mawmun sys:rmroltage: 11N109 .1 I— Brkshwe H1gnly res8tanlperymer lMxkl Drmensians 1821 x 1016 a 3Omm O= Maekme8 test:cad Promo •7000P.I713kg7st3' e U m F- Li; Frame- - Anndioer,Omni.. 0,1mkl Weight 20.5kg Maxlmunt 811 4608). -4000Pa(407kg/mq $ 0 O Z W \N/� 39. byoa:aides.ea24ree Max seems t ing. 25A E Q REC A L P H V V`p) Jon,don 6w �r 4 n 1 .^n 6C62ry0 Dr gin Mada 5ngapo a Max.a a 7 0.nt 25A m› a Z Sof wont na:nnn,a'°lwmnncngmuu5A t ELECTRICAL DATA Product Cpdi•:RECn�AA Pun Pow..e.Not er/151wietylactan ° U 9 li Power Output•P•a.(Wp) 3as 390 395 400 405 ° TEMPERATURE RATINGS' i PURE SERIES Wan Class Srttrg lW) O/•5 Q•S 0/•5 0/•5 0/•5 Nom MmnM pwar Qlm el;r 44 r(e2Y) fi Nominn1Pow41 Voltage-V,•,Ivl 412 415 41.8 421 42.4 _ :- PROJECT ID MANG9.48-2020 ga Nomnal Oow•r Curren)•�(A) 935 940 9.45 9.51 956 Twtlperatv.,.., NntaFVa, 0.24%r( t. PREPARED ON 10/1/2022 PRODUCTSPECIFICATIO "0posCurwlVottege•V.(V) 4e5 416 48 7 48.8 489 Tanparatorero.mr•emal6r 0 04%/I. DRAWN BY: UNIRAC Snort Crr mA Current-!„IA) 10 t0 rots 1020 1025 10.30 Retn•p••ague•aemrwssmedare*vale., CHECKED BY: S.T. Power Dentrly(Wfrol 206I 2108 2135 2162 2190 LOw LIGHT REHAVIOIIR STAMPED BY: S.W. Pane,El5rier.,l%) 208 21.1 213 216 219 - .."'a .,�.. lyp,n,u ran.,.,repe.ldrm,ncenrntomd.a5rz g UTILITY:EVERSOURCE Power Output-P .IWPI 293 297 301 305 309 _' Ss„ :� PE STAMP WITH SIGNATURE Nomna1884 VNage•Y,(.44 755 391 394 768 772 Y g NomnMPow C rem-Ire(A) 7.55 759 7.63 768 ].7T €j OpenCatuil Voltage-V.IV) 45.7 458 45.9 460 46.1 1 . - y Shut Canna current-IxIAI 816 820 824 828 832 araaevpaAaa) t w•awd8cns(51C a-inn,ale 5.a.tlre•148 win,'te.aaWn•CL bawd onapol.tw pm...h I EXPERIENCE Yaws a a"n:aP"V,sl,.newam,•Q..an. s a•.r.alr,:aneoperrigler.pww.-06MMwma,swlsn� OF0n/w+.rolomm•M.w wordiN+I•vrt.•.a.waaawnrl.,a...rea••atna:P-„Iat S1r 4.a. 405 WP REC - 19 25 YEAR 1111t1P1' Founded 1996REGGroups pip g e gy4 { R�� 2 1 / W m� dedicated S•moo i0 e n 1 hgaaby �,.,, REC .u. ar.mit end Slow.Most l Trusted, t high quality. roue.* LEAD-FREE :.laidw•woll ar lNo and l panels t .Aa[tses aaip; A n Norway h pe.a ral :lit: hea;pwrtnsto5lgapove.R C 1 h gan Il,b A•n.ra. EI I[-'F ROHS COMPLIANT PERFORMANCE Europe dodos,P ma ®•- PAGE DESCRIPTION PV 10 MODULE DATA SHEET 04,..°— Power Optimizer For North America .//)(\ Power Optimizer O 5440,5500 5440 5500 Unit For North America "PDT Ao ti . NQ.t„a,a,.:.1A1 ra S440,S500 m MPPP7oPw.ngRange a �° M,m.,,„vmc.r,.rcMr.aaxlac PV Module tees -�6 is ; Vdc T Mm,xr,,NEaw+cy 993 1 % EPC COMPANY: N WertEEa Efficiency %6 SUMMIT ENERGY GROUP OUTPUT DURING OPERATION 2$ O _. Ma.+,ur.ovwacv„ae 1s AQ- 293 LIBBEY INDUSTRIAL PKWY, UNIT 250,WEYMOUTH, YEAR ',foram„•Output voeage 60 _:_ver_ WARRANTY/ T OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) MA 02189,USA v smvonv.:vcaox en pc., gprr4.r - - 888.878-8848 STANDARD COMPLIANCE wIMN.summitsolarenergy.aom Ptbtoralla[Rapd Vwr4own Syu.m NEC 2016,2017 a 2020 — tM[ FCC von s Class 0.Ec6t0o0-6 z,Ic610006i --- CUSTOMER DETAILS -__r - St Y :Ec6211911c16‘r1 54etlll7.1 _. MRNial I 1A96 V-0.UVPeewit_ -- -------.___ i_._.. Yes _. ROHS — j VDE-M-E 2%ID7¢N3-05 1-_-_-_.. F-CD 03 < INSTALLATION sPfUFICl1TIDNS I 2A I a. 1.4aximun Mooed Sysren Voltage 1000 i V�fc W > Of Pmem.„n;W rt.M r29 1S5 a 30/507r6111.iI9 rte" -. 0 Z N40 Z m r • _ we7rt!•ckmry;abks) 655/t5 __.._ ?'M O J O 05 Q trqutC ne[tor -_._-.. ...--.. RqA W.c lc„uPM1 0.1/032 m/a tD Output Connector ----- --- --6 Mc. cow Q S w Wive 0123,11010/(1754(10.32 - - m/a C.3 CC 0_ g Oprabg lmpnaveR . ' -aDb r65 _... •C lc Z 111 Protector,Raxn9 - PEA/I.MAMP .... 0 O 0 d RName Meeaa1, i 0-100 % m 2 I W a sx w....me,.P Oe...a.aaeroxoc Pow..rA 0 *,homes E.0.ree..ea..ro..a ----- -- d N} 0 PV System Design Using a SolarFdge Single i,,... Three Phase for Inverter HD.Wave 277/480V Grid PV power optimization at the module level P �,.,, p w • „ PROJECT ID:MANG9.48-2020 ---- - --- Wixom,Snr9 LeNr IPower Opt.na 1 25 -_ 50'e PREPARED ON:10/12022 MeammNor aNywerowsu.y. ( naom000wm �. DRAWN BY: UNIRAC /Specifically designed to work with SolarEdge / Faster installations with simplified cable SE7caaus WMa00%61 " residential inverters management and easy assembly using a single bolt ParaEP'Sennett danerentterve%C Onelte ere e ---- ---- - : CHECKED BY: S.T. .A m.y.,..a..3oop.....,a....a...NEC•a.WAY..Nquene.aa.M.r,a.9.•.::o•rove rte.-a.... STAMPED BY: S.W. Me....raw AC pow,1•ra.,....P,..pa.„....y ten n<,w..or,*„e,,,,,, rot.,.:.n...,m w b meYu.,r...,....eou 0c w-„ /Detects abnormal PV connector behavior, / Flexible system design for maximum space utilization 6 brae .,0611,01,„.6116 vore b m„9 NOVp1memo- vereix mt areefem nkaixo.mw....v.n,,,.pca.Thy m..N..wow ar..ua..,m.>apa prow UTILITY:EVERSOURCE preventing potential safety issues* Mr.aezni.EwP.e.et..b solo:caw ow mn7.ee.mt.e.nv,„zw,er...r.oe„.ew.ar.mn9.zaaow / Compatible with bifacial PV modules we.wa...tonu sway/ne w,ae,r,.w0..-.:.,n..,.. MTh SIGNATURE I Module-level voltage shutdown for installer and :- firefighter safety / Meets NEC requirements for arc fault protection (AFCI) and Photovoltaic Rapid Shutdown System a r e"y-__ EI I Superior efficiency(99.5%) (PVRSS) ~~^[,rye "/ 0 /Mitigates all types of module mismatch loss, '�+ tam '. EE:,- from manufacturing tolerance to partial shading �< . f=tr. •E merry ty No.e1 b were moe+re Em..w... solaredge.com SO I a r a ,. m r d ,�, uroe,o.0 ..,..,v, mob„. ,�.NN,..�,,,.. ,(C�►r)„ RoHS 1 PAGE DESCRIPTION °'"'eY PV 11 OPTIMIZER DATA SHEET Single Phase Inverter With HD-Wave Technology for North America Z SE3000H-US/SE3800H-US/SE5000H-US/SE6000H-US/ Single Phase Inverter SE7600H-US/SE10000H-US/SE11400H-US C SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US 5E10000E1-US SE11400H-US with HD-Wave Technology T OUTPUT I' ■ ■ �.�:±cK Pare,CSpA �•', 33W°alw ""-: I sDJ)ea 2:0v ''"k EPC COMPANY MawweP AC Nine Qapf 300) 7°pD°240V moo t 6mc°�'011 76W SUMMIT ENERGY GROUP for North America 7a. K�M,..,P,e,� ,,. 3303°20E" °°°°� y SE3000H-US/SE3800H-US/SES000H US/SE6000H-US/ 2b�'" • —nc cow wprwk-".44.. 293 LIBBEY INDUSTRIAL PKWY, SE7600H-US/SE10000H-US/SE11400H-US2189,USA p` UNIT250.WEYMOUTH, AC Prto010,4•a•W 59.3-0)-6)S+ Asa, ,cn,v m00r3pu Canax 024ov 25 • 21 25 32 42 I 47., - 8MA 0678 rene 6648 M•wam Cam...04ns - _ A wwwsummitsolarenergy.eom ,a aw r:.�"" —HD n13�r�, wNrP ernes tib z4 � 4Rs (d , GM ThanixndI A CUSTOMER DETAILS • edm::: - —HO • P.o3ec n.Ca:ray CONo,Mge Thresholds Cs -- 3 INPUT • Maunma Power WON 4650 5900 715n I 93M new 15500 1765:. co< ' - Maunun OC Paw ezcev - _ so) _1 7150 - - - I ssSW f w 0_ '1sN' N 01 • • TaWmn-kss.C9a•m _—_. sx i W S t CA 0 _ MainwnYgrt Wka9e 401) sax 0 0 . . . w Z N o Z •••• •••• Normal DC WA wPp MO 400 Wk , —I 0 Z 0 00 .- t., 1f, KS 20 2r x15 I Ae OW• • ,� Maa.AnWx Cuwre•20M 9 - 1 13.5 1 27 !AA: < sC) W do -_. ._ _- -- --_ Y o=• Ma pu Short Cowl Gem( K ' I— liow Pm4YRbxyRaRa Its Z Z 0• • GroMfN Wham Oamon COCaosmre39 o W MmPmPaer•E•oeaxy 93 992 Q ca I LTC Wegroed Efrbxy 99 rAiS• ,s • > Z a s • • — U al 0 11. . l ADDITIONAL FEATURES _ S,ayortea Connr:ta,.turbos PsaS EYwmN.ZVI.a°'w'aa Carex repuaaafl PROJECT ID:MANG9.48-2020 Revenue Gage DOA A1400220 °P'°"'re --------------- PREPARED ON:10/1/2022 Rape Auabar-NEC 2014 and Aaom•c Rape SMasown inn AC G9e OWcnneer Optimized installation with HD-Wave technology n7M490.12 COMPLIANCE -- DRAWN BY: UNIRAC DAty 0.174tU1)341 SA. an CSA C222.Canadian Arelaeea to ni M 3Yq -07 -- CHECKED BY: S.T. s,3e / Specifically designed to work with / Extremely small Geld COMM +Sundaes 0EE1547,Pile 2l Rue 14041 STAMPED BY. S.W. power optimizers e„m Con rcc Pat,5 na.,e UTILITY:EVERSOURCE / Record-breaking efficiency / Built-in module-level monitoring INSTALLATION SPECIFICATIONS - PE STAMP WITH SIGNATURE AC n sat Coati S¢e/ANC 3M n henren/144 AWG 3H'n0ar•rn M-4 AW(. Pa'9e / Fixed voltage inverter for longer strings / Outdoor and indoor installation DC Wl Coro.*Sae/•d Whys/ 3/2'minimum/1-2•ern y ub AWG yr n.waemy 1-3 erects 7 H-e A,1„ AWG Range / Integrated arc fault protection and rapid shutdown for/ Optional:Revenue grade data,ANSI C12.20 1wW,rn enernicea we,SaterySwitch17/a 14.6.50/4m4 MI,20 213 Is 14.6 a 73/540.370e 09 •I "/ NEC 2014 and 2017,per article 690.11 and 690.12 Class 0.5(0.5%accuracy) MN^Y'l wet,Wet/Smith a-o z5.1/114 I 262/09 1 See/176 T7 k9 None .25 I .m eeA / UL1741 SA certified,for CPUC Rule 21 grid Cooing Nara.Careeun compliance on.am9 Ywexeaac Page -40(O.401-25 to•30a(-40'r/.40c OpaW^ Y'Y P,qr-ttn Pxaq NEW ax(keener wim sxery SwircNl solar3 • w— rPm.ea..nsoar4� � .�.:a aw.a.4Mr.e.,wa...a��,e”,11* .,..a solaredge.com • • • ;Own0 %oa 110aC.,,1e,aM .ellpe ar4.P1 „,te,nra,orderaap-ae,eere :.aa"viodarra:"tore r(OGI 5..1.••••• :o ...,.a....,.m....NOLi.... ..e.OA RoHS PAGE DESCRIPTION PV 12 INVERTER DATA SHEET FLASH LOC :11UNIRAC, FLASH HOC :!:UNIRAC BETTER SOLAR STARTS HERE INSTALLATION GUIDE BETTER SOLAR STARTS HERE FLASHLOC is the ultimate attachment for composition shingle and rolled comp roofs.The all-in-one mount installs L PRE-INSTALL fast—no kneeling on hot roofs to install flashing,no prying or cutting shingles,no pulling nails.Simply drive the Snap chalk lines for attachment rows.On shingle roofs,snap lines 1-3/4"below upslope edge EPC COMPANY lag bolt and inject sealant into the base.FLASHLOC's patented TRIPLE SEAL technology preserves the roof and s 1 t F5, of shingle course Locale rafters and mark attachment locations. SUMMIT ENERGY GROUP protects the penetration with a permanent pressure seal.Kitted with lag bolts,sealant,and hardware for maximum yt ( At each location.drill a 1/32"pilot hole.Clean roof surface of dirt.debris,snow,and ice. convenience.Don't just divert water,LOC it out! Next.BACKER t ALL PILOT HOLES WITH SEALANT. 293 LIBBEY INDUSTRIAL PKWY, UNIT 250,WEYMOUTH, MA 02189,USA Nall-Space mounts per racking system install specifications. 888-678-6649 www.summitsolarenergy.com STEP 1:SECURE :aa 4� P * X'.rx - CUSTOMER DETAILS NIMC '. 1' �1 '`' ?'' Place FLASHLOC over pilot hole with lag on down-slope side.Align indicator marks on sides of �� 5 a'y mount with chalk line Pass included lag bolt and sealing washer through FLASHLOC into pilot TESTED TO TAS-100 hole.Drive lag bolt until mount is held firmly in place. N YEARWINO DRIVEN RAIN TESTop D AND U1441 RAIN TEST a NOTE.The LPN In the sealing washer will expand beyond the edge of the metal washer wh�;n w Wtfif181 proper torque is applied. L 6 z HARM :M' O,w z o oa Q ... ;y..,.r Z CJ CI< w CC -,, ,0 ,,.„,,,,,, °u> Q2 o STEP 2:SEAL U uj m a x e I'" ,Ta. +t t_ Insert tip of UNIRAC provided sealant into port.Inject until sealant exits both vents.Follow ¢ z z a t P y .;` "- sealant manufacturer's instructions.Fallow sealant manufacturer's cold weather application Q - v -. guidelines,if applicable. n;CL a z Y U • Continue array installation,attaching rails to invents with provided i-halts. o dr111E2021 FlASHIDCCORP_W \. \', PROJECT ID.MANG9.48-2020 -._„� 1 I 4r PREPARED ON.10/1/2022 7 `a� F ' NOTE.When FLASHLOC is installed over gap between shingle tabs or vertical joints, DRAWN BY. UNIRAC fill gap/joint with sealant between mount and upslope edge of shingle course. CHECKED BEY S.T. --,.- ?:1e. GA�Pr` STAMPED BY: S.W. 2 ) %1 USE 0N19UNIRACAPPROVEDSEAt ANTS:Chumllnk Dar ali�k50LhwolinxK1.8.11.14500.or5 iS-4 UTILITY:EVERSOURCE ® � PE STAMP WITH SIGNATURE i"x-r PROTECT THE ROOF LOC OUT WATER HIGH-SPEED INSTALL Install a high'srrength waterproof attachment Wlih an outer skid el conlowconfomeng gasket Simply wive lag bell and mod suelanl ion the port 0 -STAIaNT s1 K' without lulling,prying or damaging shingles. eland pressurized sealant chamber lithe triple Seal to create a permanent pressure seal . technology delivers a 100%waterproof connection. FASTER INSTALLATION. 25-YEAR WARRANTY. FASTER INSTALLATION. 25-YEAR WARRANTY. FOR U'I'I ,I,rlvl', IIR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 PAGE DESCRIPTION PV 13 ATTACHMENT DATA SHEET