HomeMy WebLinkAboutMaps and schematicSimpkins Bog—Project Abutters
Town Vision Map
5 feet±
12 feet±
3 feet±
6”x6” hardwood
sill
3 @ 2”x 6” hardwood stringers
Rebar anchor Rebar anchor
21 @ 2”x 6” untreated
hardwood decking
Not to scale
Sketch Design Plan— Simpkins Bog Conservation Area Ditch Crossing
Prepared by The Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy
Handrail for safety
Minor ground disturbance is proposed to install the sill and stringers
at grade. Silt sock will be installed along the edge of the bank to
prevent any loose sediment entering the water.
6”x6” hardwood
sill
Example of similar structure installed in Falmouth by Eagle Scout
Dec 22, 2023
Stringers
Sill Sill
Trail
4 feet
wide
Decking 2 screws per stringer
(6 on each board)
1” gap
Sketch Design Plan— Simpkins Bog Conservation Area Ditch Crossing
Prepared by The Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy
(Pre-drill hardwood to avoid splitting)
Project Locus
Project Locus—Simpkins Bog Ditch Crossing. Prepared by the Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy
Project Locus
Proposed ditch
crossing
Simpkins Bog
Conservation Area
Sketch Plan—Simpkins Bog Ditch Crossing. Prepared by the Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy
Location of ditch crossing
Flow appears to be mainly
underground in this section
Water flows through this ditch
rather than mapped stream
channel
Shaded Relief from Lidar showing project location