Loading...
HomeMy WebLinkAboutMaps and schematicSimpkins Bog—Project Abutters Town Vision Map 5 feet± 12 feet± 3 feet± 6”x6” hardwood sill 3 @ 2”x 6” hardwood stringers Rebar anchor Rebar anchor 21 @ 2”x 6” untreated hardwood decking Not to scale Sketch Design Plan— Simpkins Bog Conservation Area Ditch Crossing Prepared by The Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy Handrail for safety Minor ground disturbance is proposed to install the sill and stringers at grade. Silt sock will be installed along the edge of the bank to prevent any loose sediment entering the water. 6”x6” hardwood sill Example of similar structure installed in Falmouth by Eagle Scout Dec 22, 2023 Stringers Sill Sill Trail 4 feet wide Decking 2 screws per stringer (6 on each board) 1” gap Sketch Design Plan— Simpkins Bog Conservation Area Ditch Crossing Prepared by The Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy (Pre-drill hardwood to avoid splitting) Project Locus Project Locus—Simpkins Bog Ditch Crossing. Prepared by the Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy Project Locus Proposed ditch crossing Simpkins Bog Conservation Area Sketch Plan—Simpkins Bog Ditch Crossing. Prepared by the Compact of Cape Cod Conservation Trusts, Inc. for the Native Land Conservancy Location of ditch crossing Flow appears to be mainly underground in this section Water flows through this ditch rather than mapped stream channel Shaded Relief from Lidar showing project location