HomeMy WebLinkAboutDrawing No. P0.1 Plumbing Abbreviations, Notes and SymbolsPLUMBING PIPING LEGEND
SYMBOL.
DESCRIPTION
j---- -
COLD WATER
HOT WATER
HOT WATER RECIRCULATION
SANITARY DRAINIWASTE ABOVE FLOOR
-----SAN
j- ----SAN-
SANITARY DRAIN/WASTE BELOW FLOOR
V--- ..t
VENT
2- W.
INDIRECT WASTE
PST
STORM ABOVE FLOOR (PRIMARY)
r-� -PST_
STORM BURIED (PRIMARY)
STORM ABOVE FLOOR (SECONDARY)
NATURAL GAS
GREASE WASTE
tL� --GW
GREASE WASTE BELOW FLOOR
__TW-_________?
TEMPERED WATER (65°F)
PIPE RISE
(---�--.-0
PIPE DROP
PIPE TEE TOWARDS (UP IN PLAN)
PIPE TEE AWAY (DOWN IN PLAN)
PIPE DROP AND RUN ,
DIRECTION OF FLOW
PIPE TRAP
W
DIRT LEG
�-II CO
CLEANOUT
UNION OR FLANGE
i--�---II
BLIND FLANGE
END CAP
REDUCER
VALVE AND SYMBOL LEGEND
SYMBOL
DESCRIPTION
BALL VALVE
BALL VALVE WITH HOSE BIBB, CAP & CHAIN (DRAIN VALVES)
BUTTERFLY VALVE
---pod-��
GLOBE VALVE
tti-- DG-�i
GATE VALVE
OS&Y VALVE
S
PLUG VALVE
I Daa-i
PRESSURE REDUCING VALVE
CHECK VALVE
Y-PATTERN STRAINER
SOLENOID VALVE
_Q-
AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
THREE WAY AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
r---�j----{
THREE WAY AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
�--�z
COMBINATION SHUT OFFBALANCING VALVE (CIRCUIT SETTER)
SAFETY RELIEF VALVE
i
PRESSURE GAUGE
THERMOMETER
DOUBLE CHECK VALVE ASSEMBLY
REDUCED PRESSURE BACKFLOW
PREVENTER ASSEMBLY AND DRAIN
®
GATE VALVE IN ROAD CURB BOX
BACKWATER VALVE
PUMP
OWATER
METER
II OQ
FLOOR DRAIN / FLOOR SINK / AREA
DRAIN WITH PIPE TRAP
(Q),
ROOF / OVERFLOW DRAIN
III TP
TRAP PRIMER
rG-M-1
GAS METER
Y
WATER HAMMER ARRESTOR
ICI, JIL
VENT THRU ROOF
®
ADA ACCESSIBLE FIXTURE
GENERAL ABBREVIATIONS
AD
ACCESS DOOR
ADJ
ADJUSTABLE
AFF
ABOVE FINISHED FLOOR
ALT
ALTERNATE
AHJ
AUTHORITY HAVING JURISDICTION
AP
ACCESS PANEL
AV
ACID VENT
AVTR
ACID VENT THRU ROOF I
AW
ACID WASTE
SAS
BUILDING AUTOMATION SYSTEM
BTU
BRITISH THERMAL UNIT
STUH
BTU/HOUR
BOP
BOTTOM OF PIPE
CD
CONDENSATE DRAIN
CFH
CUBIC FEET PER HOUR
Cl
CAST IRON
CO
CLEANOUT
CW
COLD WATER
DIA
DIAMETER
DN
DOWN
DSN
DOWN SPOUT NOZZLE
DW
DIRECT WASTE
ELEC
ELECTRICAL
ET
EXPANSION TANK
EWS
EMERGENCY EYEWASH/SHOWER
°F
DEGREES FAHRENHEIT
FCO
FLOOR CLEANOUT
FFE
FINISHED FLOOR ELEVATION
FGCO
FINISHED GRADE CLEANOUT
FLA
FULL LOAD AMPS
FLO
FLOOR DRAIN
FS
FLOOR SINK
FT
FEET I
FT WG
FEET HEAD
G
GAS
GALL
GALLONS
GPH
GALLONS PER
HOUR
GPM
GALLONS PER MINUTE
GSV
GAS SOLENOID VALVE
GW
GREASE WASTE'
GV
GAS VENT,
HS
HOSE BIB
HW
HOT WATER
HD
HEAD
HP
HORSEPOWER
HZ
HERTZ
HWR
HOT WATER RECIRCULATION
INT
INTERCEPTOR
INV ELEV
INVERT ELEVATION
IW
INDIRECT WASTE
KW
KILOWATT
LAV
LAVATORY
MAX
MAXIMUM I
MECH
MECHANICAL
MBH
THOUSAND BTU PER HOUR
MCA
MINIMUM CIRCUIT AMPACITY
MIN
MINIMUM
NIC
NOT IN CONTRACT
NG
NATURAL GAS
NTS
NOT TO SCALE
OD
OVERFLOW DRAIN
OW
OIL WASTE
PCD
PUMPED CONDENSATE DRAIN
PLBG
PLUMBING i
PSIG
POUNDS PER SQUARE INCH GAUGE
QTY
QUANTITY i i
RD
ROOF DRAIN
RPBP
REDUCED PRESSURE BACKFLOW PREVENTER
RTU
ROOFTOP UNIT
SAN
SANITARY I
SOFT / SF
SQUARE FEET
SS
SOIL STACK
ST
STORM
SST
SECONDARY STORM
TEMP
TEMPERATURE
TW
TEMPERED WATER
TYP
TYPICAL
V
VENT'
VS
VENT STACK
VTR
VENT THRU ROOF
W
WASTE
WS
WASTE STACK
W&V
WASTE AND VENT
EQUIPMENT ABBREVIATIONS
BF
BOTTLE FILLER
BFP
BACKFLOW PREVENTER
COT
CLEANOUT TEE
ES
EMERGENCY SHOWER
ET
EXPANSION TANK
FCO
FLOOR CLEANOUT
GI
GREASE INTERCEPTOR
HS
HAND SINK:
HY
WALL HYDRANT
L
LAVATORY
LT
LAUNDRY TUB
MS
MOP SINK I
MV
MIXING VALVE '..
P
PUMP
S
SINK
SH
SHOWER VALVE
SP
SEWAGE PUMP
TO
TRENCH DRAIN
TMV
THERMOSTAT MIXING VALVE
TP
TRAP PRIMER
TV
TEMPERING VALVE
U
URINAL
VC
VENT CAP
WC
WATER CLOSET
WCO
WALL CLEANOUT
WH
WATER HEATER
WHA
WATER HAMMER ARRESTOR
WHYD
WALL HYDRANT
YH
YARD HYDRANT
o
JUN 01 0
HEALTH DEPT.
GENERALNOTES
GENERAL
1. GENERAL NOTES, SYMBOLS AND DETAILS ARE APPLICABLE TO ALL DRAWINGS WITHIN
DIVISION 22.
2. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE,
APPROXIMATE LOCATION AND GENERAL ARRANGEMENT. DETERMINE EXACT LOCATIONS OF
SYSTEMS AND COMPONENTS IN FIELD.
3. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4. PROVIDE INFORMATION AND HARDWARE AS NECESSARY TO COORDINATE CONCRETE PADS
AND STEEL PLATFORMS REQUIRED FOR PLUMBING WORK
5. COORDINATE ROOF AND WALL PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH
FLASHING REQUIREMENTS. COORDINATE SLAB PENETRATIONS WITH WORK OF OTHER
SECTIONS.
6. RUN PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS.
7. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS AND WITH ALL
TRADES INVOLVED. PROVIDE OFFSETS IN PIPING AROUND OBSTRUCTIONS.
6. NOT ALL ACCESS DOORS HAVE BEEN SHOWN ON THE PLANS FOR CLARITY. PROVIDE ACCESS
PANELS THROUGH BUILDING ASSEMBLIES TO SERVICE AND MAINTAIN EQUIPMENT UNLESS
SUCH EQUIPMENT IS INSTALLED IN EXPOSED LOCATIONS OR ABOVE LAY -IN CEILINGS..
COORDINATE THE LOCATION OF ACCESS DOORS AND PANELS AND VERIFY THE EXACT
QUANTITY, SIZE, AND LOCATIONS AFTER THE SYSTEMS AND EQUIPMENT REQUIRING ACCESS
HAVE BEEN INSTALLED AND PRIOR TO THE CLOSURE OF THE AFFECTED CEILINGS AND
BUILDING ASSEMBLIES. OBTAIN APPROVAL FOR ALL PANEL LOCATIONS FROM ARCHITECT.
9. AT SUBSTANTIAL COMPLETION, THE FOLLOWING ITEMS, NEW OR EXISTING, SHALL BE FULLY
AND REASONABLY ACCESSIBLE: CONTROL BOXES, JUNCTION BOXES, VALVES, DOC CONTROL
BOXES, ELECTRICAL PANELS, CLEAN OUTS, DISCONNECT SWITCHES AND ELEMENTS OF
EQUIPMENT REQUIRING MAINTENANCE. "FULLY AND REASONABLY ACCESSIBLE" SHALL BE
DEFINED AS NATIONAL ELECTRIC CODE REQUIRED CLEARANCE FOR POWERED EQUIPMENT
AND CAPABLE OF BEING ACCESSED OR SERVICED WITHOUT REMOVING, MODIFYING OR
DISTORTING OTHER COMPONENTS OF THE WORK. PROVIDE MANUFACTURER'S
RECOMMENDED CLEARANCE FOR ALL EQUIPMENT.
10. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS.
VERIFY AND PROVIDE FITTINGS TO TRANSITION TO FURNISHED EQUIPMENT. FIELD VERIFY
AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
11. IN COMPLIANCE WITH THE FEDERAL SAFE WATER DRINKING ACT (SWDA), THE CONTRACTOR
SHALL NOT PROVIDE ANY COMPONENTS IN THE DOMESTIC WATER SYSTEM THAT CONTAIN
MORE THAN 0.25% LEAD ON ANY WETTED PARTS. THE CONTRACTOR SHALL PROVIDE THE
LEAD FREE EQUIVALENT OF ANY EQUIPMENT SPECIFIED AND PROVIDE A LETTER CERTIFYING
THAT ALL PLUMBING PRODUCTS PROVIDED MEET THIS REGULATION.
12. ALL PLUMBING WORK SHALL BE DONE IN ACCORDANCE WITH THE STATE PLUMBING AND
FUEL GAS CODE, THE CONTRACTOR SHALL COORDINATE WITH THE INSPECTOR FOR ALL
PLUMBING INSPECTIONS.
13. IN THE EVENT THAT THERE ARE DISCREPANCIES BETWEEN PIPE SIZES SHOWN ON THE
PLANS, DETAILS AND DIAGRAMS, THE LARGER PIPE SIZE SHALL BE FOLLOWED.
PIPING SYSTEM SPECIFIC NOTES:
1. PROVIDE ESCUTCHEONS AT EXPOSED PIPE PENETRATIONS OF CEILINGS AND WALLS
2. TOPS OF FLOOR DRAINS SHALL BE FLUSH WITH FINISHED FLOOR.
3. PROVIDE SHUT-OFF VALVES ON ALL BRANCH PIPING AND ON ALL SUPPLIES TO INDIVIDUAL
FIXTURES AND EQUIPMENT.
4. SUPPORT PIPING FROM STRUCTURE. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS,
ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING.
5. PROVIDE DRAIN WITH BALL VALVE, HOSE END VACUUM BREAKER, CAP AND CHAIN AT
DOMESTIC WATER LOW POINTS AND PITCH PIPING TO DRAIN,
6. PROVIDE ACCESSIBLE CLEANOUTS AT THE BASE OF ALL STACKS.
7. ALL PLUMBING PIPING AND DRAINS SHALL BE PROTECTED FROM DEBRIS AND KEPT
CLEAR OF BLOCKAGE DURING CONSTRUCTION.
S. PROVIDE DIELECTRIC FITTINGS WHEN JOINING PIPES OF DISSIMILAR METALS.
NATURAL GAS NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING APPLICABLE PERMITS FOR THE
WORK
2. PROVIDE DRIP POCKET AT THE BOTTOM OF ALL GAS RISERS.
3. ALL GAS PIPING TO COMPLY WITH STATE AND LOCAL CODES.
4. GAS PIPING AND SAFETY DEVICES SHALL CONFORM TO THE REQUIREMENTS OF NFPA 54
AND SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL OF THE STATE
REGULATORY BOARD,
S. PROVIDE GAS COCK VALVE AT EACH BRANCH RUNOUT FROM THE MAIN RISER SERVING
GAS OUTLETS AND AT EACH INDIVIDUAL GAS FIXTURE.
6. GAS PIPING SHALL BE TESTED ACCORDING TO THE STATE FUEL GAS CODE AND
NATIONAL CODE PROVISIONS OF THE LOCAL PLUMBING INSPECTOR, IF INSPECTION AND
TEST SHOWS DEFECTS, DEFECTIVE WORK AND MATERIAL SHALL BE REPLACED AND
INSPECTION AND TEST SHALL BE REDONE.
FIRESTOPPING NOTES:
1. PROVIDE FIRE STOPPING AND SMOKE BARRIER SEALING OF ALL PENETRATIONS THROUGH
FIRE WALLS OR SMOKE BARRIERS INCLUDING BOTH EMPTY OPENINGS AND OPENINGS
CONTAINING CABLES, PIPES, DUCTS, CONDUITS AND OTHER PENETRATING ITEMS. REFER TO
ARCHITECTURAL FLOOR PLANS AND CODE SHEETS FOR WALL RATINGS. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
PLUMBING DEMOLITION GENERAL NOTES
1. ALL PIPING TO BE REMOVED SHALL BE REMOVED COMPLETELY OR AS OTHERWISE
SHOWN OR INDICATED ON DRAWINGS. ALL PIPE HANGERS, SLEEVES, RISER CLAMPS, ETC.
SHALL BE REMOVED COMPLETELY WITH PIPING. NO EXISTING HANGER SYSTEMS SHALL
BE REUSED FOR NEW PIPING.
2. ALL PIPING TO BE REMOVED SHALL BE REMOVED TO BELOW FLOOR, ABOVE CEILING OR IN
WALLS BACK TO MAINS OR SHUT OFF VALVES AT MAINS AND PROPERLY CAPPED PER
CODE WITHOUT LEAVING DEAD ENDED PIPING. -
3. NO EQUIPMENT OR DEVICES THAT HAVE BEEN DISCONNECTED AND OR ABANDONED
SHALL REMAIN.
4. ALL EXISTING PIPING AND EQUIPMENT SHOWN HAS BEEN TAKEN FROM THE BEST
AVAILABLE EXISTING INFORMATION. THE DRAWINGS ARE DIAGRAMMATIC AND ALL
FIXTURES, PIPING, AND DEVICES MAY NOT BE SHOWN. THE INTENT OF THESE DRAWINGS
IS THAT IN ALL AREAS OF RENOVATION THAT THEY ARE REMOVED, WHETHER OR NOT
SHOWN (UNLESS INDICATED TO REMAIN).
5. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE
EXISTING SYSTEMS AND CONDITIONS IN AREAS OF RENOVATION.
6, ANY SYSTEMS OR EQUIPMENT TO REMAIN ACTIVE DURING RENOVATION SHALL BE KEPT IN
OPERATION BY PROVIDING TEMPORARY PIPING CONNECTIONS AS REQUIRED UNTIL NEW
SYSTEMS ARE INSTALLED AND OPERATIONAL.
7. THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE OWNER, CM, AND OR
GENERAL CONTRACTOR ANY AND ALL PHASING OF THE PLUMBING DEMOLITION WORK IN
ORDER TO SATISFY THE CONSTRUCTION SCHEDULE AND OWNERS OCCUPANCY
REQUIREMENTS.
6. THE PLUMBING CONTRACTOR SHALL ALSO REVIEW THE ARCHITECTURAL DEMOLITION
DRAWINGS AS PART OF THIS CONTRACT FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
9. ALL SERVICE INTERUPTIONS SHALL BE COORDINATED AND APPROVED WITH THE OWNER
A MINIMUM OF 5 DAYS IN ADVANCE PRIOR TO COMMENCEMENT OF ANY WORK
10. THE PLUMBING CONTRACTOR SHALL COORDINATE THEIR DEMOLITION WORK WITH THAT
OF OTHER TRADES IN ORDER TO AVOID CONFLICTS.
STAMP:
� t F"
oZ� JAMES L.
SENA1110
G MEN IC'
.63130
O/
In
>1
0
C
AN
Z)
U
N
2
Q
p w
CL
H
5
K �O
} U
Lit
N
0
Q
W
H
N
W oo
W pop
1� N
co
C,
oIn
S
3 a
uj
Zr
„ '
Z L)N
V/ O 2
(jJ In 3
t� �L
O W Z)
i- O
Opcf.LL
=�
H ad
L-0 Q
�W CVi-
F_ D N F-
a= 1 o
wW
li
TITLE:
PLUMBING
BBREVIATIONc
NOTES AND
SYMBOLS
DATE
ISSUED: 4/25/2022
REVISIONS:
No. I Description I Date
1
I
Services U.CC
128 Cemegle Row, Ste.104
1 Norwood MA 02062
617.261.7161
ceseng.cam
DRAWING NO.: 2022053.00
PO. 1
0 catalyst A�chited- I Imsrias, Mc. AA rVft reaevsd.
The Copyrights to It
designs and dr-hp era tin property
CO2W Arch@e ftss I herias, I., No ttse or reproduction of this
material is permitted vdta k emrsssad yrtRten corwA.
II[