Loading...
HomeMy WebLinkAboutDrawing No. P0.1 Plumbing Abbreviations, Notes and SymbolsPLUMBING PIPING LEGEND SYMBOL. DESCRIPTION j---- - COLD WATER HOT WATER HOT WATER RECIRCULATION SANITARY DRAINIWASTE ABOVE FLOOR -----SAN j- ----SAN- SANITARY DRAIN/WASTE BELOW FLOOR V--- ..t VENT 2- W. INDIRECT WASTE PST STORM ABOVE FLOOR (PRIMARY) r-� -PST_ STORM BURIED (PRIMARY) STORM ABOVE FLOOR (SECONDARY) NATURAL GAS GREASE WASTE tL� --GW­ GREASE WASTE BELOW FLOOR __TW-_________? TEMPERED WATER (65°F) PIPE RISE (---�--.-0 PIPE DROP PIPE TEE TOWARDS (UP IN PLAN) PIPE TEE AWAY (DOWN IN PLAN) PIPE DROP AND RUN , DIRECTION OF FLOW PIPE TRAP W DIRT LEG �-II CO CLEANOUT UNION OR FLANGE i--�---II BLIND FLANGE END CAP REDUCER VALVE AND SYMBOL LEGEND SYMBOL DESCRIPTION BALL VALVE BALL VALVE WITH HOSE BIBB, CAP & CHAIN (DRAIN VALVES) BUTTERFLY VALVE ---pod-�� GLOBE VALVE tti-- DG-�i GATE VALVE OS&Y VALVE S PLUG VALVE I Daa-i PRESSURE REDUCING VALVE CHECK VALVE Y-PATTERN STRAINER SOLENOID VALVE _Q- AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR THREE WAY AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR r---�j----{ THREE WAY AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR �--�z COMBINATION SHUT OFFBALANCING VALVE (CIRCUIT SETTER) SAFETY RELIEF VALVE i PRESSURE GAUGE THERMOMETER DOUBLE CHECK VALVE ASSEMBLY REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY AND DRAIN ® GATE VALVE IN ROAD CURB BOX BACKWATER VALVE PUMP OWATER METER II OQ FLOOR DRAIN / FLOOR SINK / AREA DRAIN WITH PIPE TRAP (Q), ROOF / OVERFLOW DRAIN III TP TRAP PRIMER rG-M-1 GAS METER Y WATER HAMMER ARRESTOR ICI, JIL VENT THRU ROOF ® ADA ACCESSIBLE FIXTURE GENERAL ABBREVIATIONS AD ACCESS DOOR ADJ ADJUSTABLE AFF ABOVE FINISHED FLOOR ALT ALTERNATE AHJ AUTHORITY HAVING JURISDICTION AP ACCESS PANEL AV ACID VENT AVTR ACID VENT THRU ROOF I AW ACID WASTE SAS BUILDING AUTOMATION SYSTEM BTU BRITISH THERMAL UNIT STUH BTU/HOUR BOP BOTTOM OF PIPE CD CONDENSATE DRAIN CFH CUBIC FEET PER HOUR Cl CAST IRON CO CLEANOUT CW COLD WATER DIA DIAMETER DN DOWN DSN DOWN SPOUT NOZZLE DW DIRECT WASTE ELEC ELECTRICAL ET EXPANSION TANK EWS EMERGENCY EYEWASH/SHOWER °F DEGREES FAHRENHEIT FCO FLOOR CLEANOUT FFE FINISHED FLOOR ELEVATION FGCO FINISHED GRADE CLEANOUT FLA FULL LOAD AMPS FLO FLOOR DRAIN FS FLOOR SINK FT FEET I FT WG FEET HEAD G GAS GALL GALLONS GPH GALLONS PER HOUR GPM GALLONS PER MINUTE GSV GAS SOLENOID VALVE GW GREASE WASTE' GV GAS VENT, HS HOSE BIB HW HOT WATER HD HEAD HP HORSEPOWER HZ HERTZ HWR HOT WATER RECIRCULATION INT INTERCEPTOR INV ELEV INVERT ELEVATION IW INDIRECT WASTE KW KILOWATT LAV LAVATORY MAX MAXIMUM I MECH MECHANICAL MBH THOUSAND BTU PER HOUR MCA MINIMUM CIRCUIT AMPACITY MIN MINIMUM NIC NOT IN CONTRACT NG NATURAL GAS NTS NOT TO SCALE OD OVERFLOW DRAIN OW OIL WASTE PCD PUMPED CONDENSATE DRAIN PLBG PLUMBING i PSIG POUNDS PER SQUARE INCH GAUGE QTY QUANTITY i i RD ROOF DRAIN RPBP REDUCED PRESSURE BACKFLOW PREVENTER RTU ROOFTOP UNIT SAN SANITARY I SOFT / SF SQUARE FEET SS SOIL STACK ST STORM SST SECONDARY STORM TEMP TEMPERATURE TW TEMPERED WATER TYP TYPICAL V VENT' VS VENT STACK VTR VENT THRU ROOF W WASTE WS WASTE STACK W&V WASTE AND VENT EQUIPMENT ABBREVIATIONS BF BOTTLE FILLER BFP BACKFLOW PREVENTER COT CLEANOUT TEE ES EMERGENCY SHOWER ET EXPANSION TANK FCO FLOOR CLEANOUT GI GREASE INTERCEPTOR HS HAND SINK: HY WALL HYDRANT L LAVATORY LT LAUNDRY TUB MS MOP SINK I MV MIXING VALVE '.. P PUMP S SINK SH SHOWER VALVE SP SEWAGE PUMP TO TRENCH DRAIN TMV THERMOSTAT MIXING VALVE TP TRAP PRIMER TV TEMPERING VALVE U URINAL VC VENT CAP WC WATER CLOSET WCO WALL CLEANOUT WH WATER HEATER WHA WATER HAMMER ARRESTOR WHYD WALL HYDRANT YH YARD HYDRANT o JUN 01 0 HEALTH DEPT. GENERALNOTES GENERAL 1. GENERAL NOTES, SYMBOLS AND DETAILS ARE APPLICABLE TO ALL DRAWINGS WITHIN DIVISION 22. 2. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE, APPROXIMATE LOCATION AND GENERAL ARRANGEMENT. DETERMINE EXACT LOCATIONS OF SYSTEMS AND COMPONENTS IN FIELD. 3. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 4. PROVIDE INFORMATION AND HARDWARE AS NECESSARY TO COORDINATE CONCRETE PADS AND STEEL PLATFORMS REQUIRED FOR PLUMBING WORK 5. COORDINATE ROOF AND WALL PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH FLASHING REQUIREMENTS. COORDINATE SLAB PENETRATIONS WITH WORK OF OTHER SECTIONS. 6. RUN PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. 7. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS AND WITH ALL TRADES INVOLVED. PROVIDE OFFSETS IN PIPING AROUND OBSTRUCTIONS. 6. NOT ALL ACCESS DOORS HAVE BEEN SHOWN ON THE PLANS FOR CLARITY. PROVIDE ACCESS PANELS THROUGH BUILDING ASSEMBLIES TO SERVICE AND MAINTAIN EQUIPMENT UNLESS SUCH EQUIPMENT IS INSTALLED IN EXPOSED LOCATIONS OR ABOVE LAY -IN CEILINGS.. COORDINATE THE LOCATION OF ACCESS DOORS AND PANELS AND VERIFY THE EXACT QUANTITY, SIZE, AND LOCATIONS AFTER THE SYSTEMS AND EQUIPMENT REQUIRING ACCESS HAVE BEEN INSTALLED AND PRIOR TO THE CLOSURE OF THE AFFECTED CEILINGS AND BUILDING ASSEMBLIES. OBTAIN APPROVAL FOR ALL PANEL LOCATIONS FROM ARCHITECT. 9. AT SUBSTANTIAL COMPLETION, THE FOLLOWING ITEMS, NEW OR EXISTING, SHALL BE FULLY AND REASONABLY ACCESSIBLE: CONTROL BOXES, JUNCTION BOXES, VALVES, DOC CONTROL BOXES, ELECTRICAL PANELS, CLEAN OUTS, DISCONNECT SWITCHES AND ELEMENTS OF EQUIPMENT REQUIRING MAINTENANCE. "FULLY AND REASONABLY ACCESSIBLE" SHALL BE DEFINED AS NATIONAL ELECTRIC CODE REQUIRED CLEARANCE FOR POWERED EQUIPMENT AND CAPABLE OF BEING ACCESSED OR SERVICED WITHOUT REMOVING, MODIFYING OR DISTORTING OTHER COMPONENTS OF THE WORK. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCE FOR ALL EQUIPMENT. 10. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE FITTINGS TO TRANSITION TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION. 11. IN COMPLIANCE WITH THE FEDERAL SAFE WATER DRINKING ACT (SWDA), THE CONTRACTOR SHALL NOT PROVIDE ANY COMPONENTS IN THE DOMESTIC WATER SYSTEM THAT CONTAIN MORE THAN 0.25% LEAD ON ANY WETTED PARTS. THE CONTRACTOR SHALL PROVIDE THE LEAD FREE EQUIVALENT OF ANY EQUIPMENT SPECIFIED AND PROVIDE A LETTER CERTIFYING THAT ALL PLUMBING PRODUCTS PROVIDED MEET THIS REGULATION. 12. ALL PLUMBING WORK SHALL BE DONE IN ACCORDANCE WITH THE STATE PLUMBING AND FUEL GAS CODE, THE CONTRACTOR SHALL COORDINATE WITH THE INSPECTOR FOR ALL PLUMBING INSPECTIONS. 13. IN THE EVENT THAT THERE ARE DISCREPANCIES BETWEEN PIPE SIZES SHOWN ON THE PLANS, DETAILS AND DIAGRAMS, THE LARGER PIPE SIZE SHALL BE FOLLOWED. PIPING SYSTEM SPECIFIC NOTES: 1. PROVIDE ESCUTCHEONS AT EXPOSED PIPE PENETRATIONS OF CEILINGS AND WALLS 2. TOPS OF FLOOR DRAINS SHALL BE FLUSH WITH FINISHED FLOOR. 3. PROVIDE SHUT-OFF VALVES ON ALL BRANCH PIPING AND ON ALL SUPPLIES TO INDIVIDUAL FIXTURES AND EQUIPMENT. 4. SUPPORT PIPING FROM STRUCTURE. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING. 5. PROVIDE DRAIN WITH BALL VALVE, HOSE END VACUUM BREAKER, CAP AND CHAIN AT DOMESTIC WATER LOW POINTS AND PITCH PIPING TO DRAIN, 6. PROVIDE ACCESSIBLE CLEANOUTS AT THE BASE OF ALL STACKS. 7. ALL PLUMBING PIPING AND DRAINS SHALL BE PROTECTED FROM DEBRIS AND KEPT CLEAR OF BLOCKAGE DURING CONSTRUCTION. S. PROVIDE DIELECTRIC FITTINGS WHEN JOINING PIPES OF DISSIMILAR METALS. NATURAL GAS NOTES: 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING APPLICABLE PERMITS FOR THE WORK 2. PROVIDE DRIP POCKET AT THE BOTTOM OF ALL GAS RISERS. 3. ALL GAS PIPING TO COMPLY WITH STATE AND LOCAL CODES. 4. GAS PIPING AND SAFETY DEVICES SHALL CONFORM TO THE REQUIREMENTS OF NFPA 54 AND SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL OF THE STATE REGULATORY BOARD, S. PROVIDE GAS COCK VALVE AT EACH BRANCH RUNOUT FROM THE MAIN RISER SERVING GAS OUTLETS AND AT EACH INDIVIDUAL GAS FIXTURE. 6. GAS PIPING SHALL BE TESTED ACCORDING TO THE STATE FUEL GAS CODE AND NATIONAL CODE PROVISIONS OF THE LOCAL PLUMBING INSPECTOR, IF INSPECTION AND TEST SHOWS DEFECTS, DEFECTIVE WORK AND MATERIAL SHALL BE REPLACED AND INSPECTION AND TEST SHALL BE REDONE. FIRESTOPPING NOTES: 1. PROVIDE FIRE STOPPING AND SMOKE BARRIER SEALING OF ALL PENETRATIONS THROUGH FIRE WALLS OR SMOKE BARRIERS INCLUDING BOTH EMPTY OPENINGS AND OPENINGS CONTAINING CABLES, PIPES, DUCTS, CONDUITS AND OTHER PENETRATING ITEMS. REFER TO ARCHITECTURAL FLOOR PLANS AND CODE SHEETS FOR WALL RATINGS. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. PLUMBING DEMOLITION GENERAL NOTES 1. ALL PIPING TO BE REMOVED SHALL BE REMOVED COMPLETELY OR AS OTHERWISE SHOWN OR INDICATED ON DRAWINGS. ALL PIPE HANGERS, SLEEVES, RISER CLAMPS, ETC. SHALL BE REMOVED COMPLETELY WITH PIPING. NO EXISTING HANGER SYSTEMS SHALL BE REUSED FOR NEW PIPING. 2. ALL PIPING TO BE REMOVED SHALL BE REMOVED TO BELOW FLOOR, ABOVE CEILING OR IN WALLS BACK TO MAINS OR SHUT OFF VALVES AT MAINS AND PROPERLY CAPPED PER CODE WITHOUT LEAVING DEAD ENDED PIPING. - 3. NO EQUIPMENT OR DEVICES THAT HAVE BEEN DISCONNECTED AND OR ABANDONED SHALL REMAIN. 4. ALL EXISTING PIPING AND EQUIPMENT SHOWN HAS BEEN TAKEN FROM THE BEST AVAILABLE EXISTING INFORMATION. THE DRAWINGS ARE DIAGRAMMATIC AND ALL FIXTURES, PIPING, AND DEVICES MAY NOT BE SHOWN. THE INTENT OF THESE DRAWINGS IS THAT IN ALL AREAS OF RENOVATION THAT THEY ARE REMOVED, WHETHER OR NOT SHOWN (UNLESS INDICATED TO REMAIN). 5. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE EXISTING SYSTEMS AND CONDITIONS IN AREAS OF RENOVATION. 6, ANY SYSTEMS OR EQUIPMENT TO REMAIN ACTIVE DURING RENOVATION SHALL BE KEPT IN OPERATION BY PROVIDING TEMPORARY PIPING CONNECTIONS AS REQUIRED UNTIL NEW SYSTEMS ARE INSTALLED AND OPERATIONAL. 7. THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE OWNER, CM, AND OR GENERAL CONTRACTOR ANY AND ALL PHASING OF THE PLUMBING DEMOLITION WORK IN ORDER TO SATISFY THE CONSTRUCTION SCHEDULE AND OWNERS OCCUPANCY REQUIREMENTS. 6. THE PLUMBING CONTRACTOR SHALL ALSO REVIEW THE ARCHITECTURAL DEMOLITION DRAWINGS AS PART OF THIS CONTRACT FOR ADDITIONAL INFORMATION AND REQUIREMENTS. 9. ALL SERVICE INTERUPTIONS SHALL BE COORDINATED AND APPROVED WITH THE OWNER A MINIMUM OF 5 DAYS IN ADVANCE PRIOR TO COMMENCEMENT OF ANY WORK 10. THE PLUMBING CONTRACTOR SHALL COORDINATE THEIR DEMOLITION WORK WITH THAT OF OTHER TRADES IN ORDER TO AVOID CONFLICTS. STAMP: � t F" oZ� JAMES L. SENA1110 G MEN IC' .63130 O/ In >1 0 C AN Z) U N 2 Q p w CL H 5 K �O } U Lit N 0 Q W H N W oo W pop 1� N co C, oIn S 3 a uj Zr „ ' Z L)N V/ O 2 (jJ In 3 t� �L O W Z) i- O Opcf.LL =� H ad L-0 Q �W CVi- F_ D N F- a= 1 o wW li TITLE: PLUMBING BBREVIATIONc NOTES AND SYMBOLS DATE ISSUED: 4/25/2022 REVISIONS: No. I Description I Date 1 I Services U.CC 128 Cemegle Row, Ste.104 1 Norwood MA 02062 617.261.7161 ceseng.cam DRAWING NO.: 2022053.00 PO. 1 0 catalyst A�chited- I Imsrias, Mc. AA rVft reaevsd. The Copyrights to It designs and dr-hp era tin property CO2W Arch@e ftss I herias, I., No ttse or reproduction of this material is permitted vdta k emrsssad yrtRten corwA. II[