Loading...
HomeMy WebLinkAbout2024-04-30 Summary of Plan Revisions Engineers Environmental Scientists Software Developers Landscape Architects Planners Surveyors 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919 APRIL 30, 2024 www.bscgroup.com Kathy Williams, P.E. Yarmouth Town Planner 1146 Route 28 South Yarmouth, MA 02664 RE: DRC Application, 811 Route 28 Dear Kathy, BSC Group, Inc. (BSC) has revised the site plans for the proposed multi-family development at 811 Route 28 in South Yarmouth. The plans were revised based on the comments that we received during the VCOD Site Plan Review meeting on April 16, 2024. The following summarizes the plan modifications that have resulted in the current site plans, revised April 26, 2024: · Added a sidewalk connection to the existing sidewalk on Route 28. · Moved the bike rack further away from the fire lane and added protective bollards. · Added a 3’ x 3’ concrete pad to the rear of each unit for a condenser. The hot water heater will be located in the closet below the stairs of each unit. · Modified the design of the septic system. The previous design included 500-gallon precast concrete chambers. These were replaced with Cur-tech CTL-12 chambers, which have a shallower profile. · Swapped the location of Infiltration System #1 and the reserve area to provide greater separation to between the infiltration and soil absorption systems. · Modified the grading of the access drive to ensure more effective drainage of stormwater runoff. · Decreased the overall length of the access drive and moved the dumpster out of the 20-foot buffer to the residentially zoned properties to the south. · Added four (4) new trees at intervals of 30 feet, along the southern boundary of the site to comply with the VCOD buffer requirements. · Modified site landscaping by replacing invasive species with non-invasives. · Combined driveways of Units 1 & 2, Units 3 & 4, Units 5 & 6 and Units 7 & 8. This allowed us to increase the width of the landscaped islands between Units 2 & 3 and Units 6 & 7, in order to provide larger canopy trees in those locations. · Added plantings to the proposed Rain Garden. · Replaced English Yew with Holly throughout the site. 349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919 I look forward to presenting them to the Design Review Committee next week. If you have any questions or comments in the interim, please feel free to reach out at your convenience. Sincerely, BSC Group, Inc. Brian G. Yergatian, P.E., LEED AP Manager of Civil Engineering, Senior Associate