Loading...
HomeMy WebLinkAboutEngineer Pan5 ft.Soil Removal (see note 13) I 10D \ 11i Benchmark set Right car. bulkhead �- E1.=100.86 (Assumed) CL h N m TERRY ANN WARNER No. 33721 -7/Wog No. 1140 100-, N 79'30'02 ' ,:epee--1pp.00 shed 65r1 O / q 1 Deck J22 I TOF=102.29 (ASSUMED) O / ( E '\O \ \100 / l I Lot 74 T—T S�' I 10, 000t S.F. Mop 77 Parcel 90 0 1 p0.0p , 1 / S 79*30 14)� edge Of wiNDJAMMER 0 LEGEND PROPOSED CONTOUR ® PROPOSED SPOT GRADE -- gg -- EXISTING CONTOUR + 96.52 EXISTING SPOT GRADE —W- OEM � / I Paved Driye 198 FT 98 YaAM i �-98 Iyame LANE EXISTING WATER SERVICE TEST PIT 1 LOCUS MAP N.T.S. GENERAL NOTES: 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. 2. ALL WORK AND MATERIALS SHALT_ CONFORM TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL. CODE, TITLE V. AND ANY APPLICABLE LOCAL RULES AND REGULATIONS. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON ASSUMED DATUM. 6. THE DESIGN ENGINEER IS Nat RESPONSIBLE FOR THE FAILURE OF THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO A CONDITION AGREED UPON BETWEEN OWNER AND CONTRACTOR. 9. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION, 10. EXISTING LEACHING PITS TO BE PUMPED, CRUSHED AND REMOVED PER TITLE V. REPLACE WITH CLEAN MEDIUM SAND 11. 48 HOUR NOTICE FOR ENGINEER CERTIFICATION 12. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY 13. REMOVE ALL UNSUITABLE SOILS 5 FEET AROUND LEACHING TO EL. 95.67 OR TOP OF C LAYER AND REPLACE WITH CLEAN MEDIUM SAND PER TITLE V. 14. NO PRIVATE WELLS WITHIN 150 FT. OF PROPOSED LEACHING 15. NO WETLANDS WITHIN 100 FT. OF PROPOSED LEACHING 15. PLACE 40 ml POLY BARRIER AS SHOWN FROM EL. 102 - 98.17 TO PREVENT BREAKOUT 16. ALL PIPING TO BE 4" SCH 40 ® 1/8"/rT (UNLESS SPECIFIED) PROPOSED SEPTIC SYSTEM UPGRADE PLAN 22 WINDJAMMER ROAD, SOUTH YARMOUTH, MA_ MAP: 077 Prepared_ for: Todd Krinsky _ LOT.'090 Engineering by: Surveying by: SCAIE DRAWN JOB. N0. DARREN M. MEYER, R.S. Radler Surveying 1 "=20' DMM PO Box 98t 22 Long Road EAST SANDWICH, MA 02537 Harwich, MA 02645 r06O/O7 CHECKED SHEET NO. 508-361-2922 (508) 432-8303 DMM 1 Of 2 ELEV. TOP PROPOSED TANK FOUNDATION INSTALL RISERS W/IN 6" OF FINISH GRADE (Existing) = 102.29� I- EL.100 r- CELLAR FLOOR I:1:T•15I1T • - . mk mormc„ . INV.-100. TEE'S ARE M BE 4' SCH 40 PVC EL. 100 98.35 'a 1,000 GALLON SEPTIC TANK (H-10 LOAD) GAS BAFFLE TO BE INSTSALLED ON OUTLET TEE AS MANUFACTURED BY TUF-TITE, ZABEL, OR EQUAL PUMP CHAMBER INSTALL RISERS W/IN 6" OF FINISH GRADE EL. 100 to' n-13 INSTALL RISERS W/W 6" OF FINISH GRADE N1 Go .ems+�. �c."x�<:•��.;.• �,.•sau.a•.�� INV.- 99.22 J D-BOX TEE SHALL NOT EXTEND BELOW FLOW LINE DB-6 AM `-INV.=98.0 1000 GALLON PUMP CHAMBER(H-10) NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING 3) INSTALL INLET & OUTLET TEES AS REQUIRED. PIPE INVERTS PRIOR TO CONSTRUCTION. 4) REPLACE EXISTING 1,000 GALLON SEPTIC FINISH GRADE=100.25 MAINTAIN 2% MIN SLOPE OVER LEACHING AREA L-10'(MAX) 4" SCH An P 0 S= 1% (MIN.) INV.ELEV.=98.92 MAX. COVER OVER S.A.S. = 36" ---INSPECTION PORT TO BE PLACED ON END UNIT SOIL ABSORPTION SYSTEM (PROFILE) NJ.& CULTEC NO. 410 FILTER F 2) SEPTIC TANK, PUMP CHAMBER AND D-BOX SHALL BE TANK WITH 1500 GALLON SEPTIC TANK 12" MI SET LEVEL AND TRUE TO GRADE ON A MECHANICALLY IF FAILED, DAMAGED, OR UNDERSIZED. TOP OF CHAMBER ELEV.=99.58 IN COMMA CMRS15122C7(2'RUSHED STONE BASE, AS SPECIFIED 5) INSTALL SANITARY TEE IN D-BOX INV.ELEV.=98.92 SEPTIC SYSTEM PROFILE BOTTOM ELEV.=98.67 N.T.S. INSTALL 1' PVC CONDUIT TO HOUSE FOR PARING WITH WATERTIGHT JOINTS. WARE HIGH WATER ALARM PROVIDE WATERTIGHT CONCRETE RISER FLOAT TO GP 2000 HIGH WATER ALARM PANAL ON PATH SECURED COVER TO GRADE CIRCUIT SEPARATE FROM CIRCUIT TO THE PUMP, NEMA 4 JUNCTION BOX CORROSION RESISTANT & LIQUID -TIGHT CABLE CONNECTORS SUPPORTED HOISTING CABLE 7x19 STAINLESS SIEEI BY 1-1/4" PVC CONDUIT. JOINTS TO BE MADE 1/8' DIAMETER. / 1,760 LB. STRENGTH. WATERTIGHT 2"BALL VALVE W/ UNIONS SCH. 80 PVC PC INV.(IN)=98.25 GEORGE FISHER CO. MODEL NO. 560 OR EQUAL 2"SCH. 40 DISCHARGE TO D-BOX ALARM ON EL: 96.66 2"SCH. 40 TEE w/ CLEAN -OUT CAP PUMP ON EL' 95.33 PROVIDE 1/4" WEEP HOLE IN DISCHARGE BOTTOM OF PUMP OFF EL: 95.0 If6. _- PIPE FOR SELF -DRAINING FORCE MAIN PUMP CHAMBER 12 2" BALL CHECK VALVE SCH. 80 PVC 1 ELEV.- 94.0 100 P.S.I. FLOWMATIC MODEL No. 208S PROVIDE 2- WDE ANGLE FLOATS: FLOAT NOA: PUMP ON/OFF (BARNES 073618 OR EQUAL) 2" SCH. 40 PVC DISCHARGE PIPE FLOAT NO.2: ALARM ACTIVATION (BARNES 073612 OR EQUAL) BARNES SEV412 PUMP .5 H.P. 115 V 2" DISCHARGE PASSING 2" SOLIDS OR EQUAL PUMP CHAMBER, PUMP & ACCESSORIES AVAILABLE AS A UNIT THROUGH WIGGEN PRECAST CORP., BOURNE MA. (800) 564-6774 PUMP & ACCESSORIES AVAILABLE THROUGH WILLIAMSON ELECTRIC (781) 444-6800 PUMP DETAIL N.T.S. BUOYANCY CALCULATIONS DOSING & STORAGE REQUIREMENTS DAILY FLOW: 330 GPD DOSING REQUIRED: 4 CYCLES/DAY (SAND) No Buoyancy Calculations RequNed 330 - 4 = 82.5 GALLLONS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS: 82.5 GAL/CYCLE= 250 GAL/FT = 0.33 FT/CYCLE (4"') STORAGE REQUIRED ABOVE WORKING LEVEL: 330 GALLONS STORAGE PROVIDED: INV.(IN) EL:98.25 - PUMP ON EL:95.33 =2.92' STORAGE PROVIDED = 2.66' X 250 GAL/FT = 730 GALLONS 5' MIN. ABOVE BOTTOM OF T.P. EXCAVATION OR G.W. ADJ. GIN EL: 93.67 - SOIL LOGS DATE: MAY 30, 2007 SOIL EVALUATOR: DARREN MEYER, R.S., CSE WITNESS: AMY VONHONE, YARM. BOH PERC RATE <2 MIN/IN. ("C" HORIZON) Elev. TH-1 Depth 99.0 Q" AnLOAMYSANIO 98.33 B8" 95.67 C1 MEDIUM SAND 2.5Y 6/6 90.67 ESTABLISH VEGETATIVE COVER BACKFILL WITH CLEAN SAND (NATIVE OR PERC SAND) n � n EXISTING SUITABLE MATERIAL EFFECTIVE WIDTH-13.0' - USE 3 ROWS OF 3-CULTEC C-4 FIELD DRAIN UNITS WITH 6" SEPARATION BETWEEN EACH ROW & NO STONE SOIL ABSORPTION SYSTEM (SECTION) i DESIGN CRITERIA -Mtrtx \ 1140 NUMBER OF BEDROOMS: 3 BEDROOM __K ate/ Ito SOIL TEXTURAL CLASS: CLASS I DESIGN PERCOLATION RATE: <2 MIN/IN 44NITAV DAILY FLOW: 110 G.P.D./BR G' 10 DESIGN FLOW: 330 G.P.D. (MIN REQ'D) GARBAGE GRINDER: NO PROPOSED SEPTIC TANK: 1000 GALLON (existing) PROPOSED PUMP CHAMBER: 1000 GALLON LEACHING AREA REQUIRED: (330) = 445.9 S.F. .74 BOTTOM AREA: (GENERAL USE APPROVAL FOR 6.7 SF/LF OF C-4 UNIT) 40' 3 UNITS x B.O'/UNIT = 24.0 FT 3 ROWS x 24.0' x 6.7 SF/LF = 482.4 SF DESIGN FLOW PROVIDED: 0.74(482.4 S.F.) = 357.0 G.P.D. 100" GROUNDWATER OBSERVED AT 76" EL. 92.67 INDEX WELL: AIW-230 ZONE: C LEVEL- 21.7 ADJUSTMENT: 1.2 ft. USE BOARD OF HEALTH ALLOWED ADJ: 1.0 R ADJUSTED HIGH GROUNDWATER AT EL. 93.67 PROPOSED SEPTIC SYSTEM UPGRADE PLAN 22 WINDJAMMER ROAD, SOUTH YARMOUTH, MA Prepared for: Todd Krinsky Engineering by: Surveying by: SCALE DRAWN JOB, NO. DARRENM. MEYER, R.S. Warner Surveying, N.T.S. DMM POSOX981 22 Long Road EASTSANDINICH, MA 62537 Harwich, MA 02645 DATE CHECKED SHEET N0. 508362-2922 (508) 432-8309 06/10/07 DMM 2 Of 2