Loading...
HomeMy WebLinkAboutReview Checklist -Z-G TOWN OF YARMOUTH , //t, SEWAGE PLAN REVIEW CHECKLIST / rX Location: A.M. Lot el- Zone of Contribution: In )ut_ Acreage ,i' ',.- `' Commercial: Residential: Street: - i Gjl/,l/4 Village: 7 Floor Plan: #Bedrooms: Owner: /0 /L-G/`( / Installer: 61-(42/, Address: Phone: , ' 3f�'" - G Phone: Builder: Engineer: Ott4PG' Address: 7 Phone: '�-- - F22_ Phone: Ai t +i ‘?'- iv, te, , ��," N/A YES )O 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table _ l<---- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: (_----' 6.Benchmark indicated and shown-NGVD if near wetlands . L,-- 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 1------ °9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: c2. System meets all other setback requirements Var.: _--- 13. Uses adjustment for maximum high groundwater Var.: a),2 C i,,,� 14.Leaching set 4-5 ft above adj.water or 9ftest hole Var.: / 15. System not in top or subsoil(A,B horizons)or ' removai' ✓� 16.Proposed contours are suitable L/ 17. System meets slope requirements-min. 1/8", ' "preferred ') L-/ 18. System meets breakout requirements i PVC liner: ft),,,J`Wall: L.�� 19. Specified tee sizes are proper, gas baffle on outlet tee.__ ?r0. Sewage is under 10,000 gpd for parcel L.------.' 21.No garbage disposal 22. System adequately sized for its intended use L/ 23.Minimum 6"stone or compacted below tank and dbox �f 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field k_/ 26. Electrical permit for pump chamber/Separate meter for duplexes L/ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size �------ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking ./ _30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: -� 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature :�---' 33. H-20 loading is subject to vehicular traffic, groundwater ✓� 34. Title V Application andpermit fee, installer signature _/ 35.Foundation footing min. 2 feet above adjusted ground water for new house ----- 36.Deed Restriction required max. #bedrooms: max. flow: gpd i 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: �zf' 6/03/03