HomeMy WebLinkAboutReview Checklist -Z-G
TOWN OF YARMOUTH , //t,
SEWAGE PLAN REVIEW CHECKLIST / rX
Location: A.M. Lot el- Zone of Contribution: In )ut_ Acreage ,i' ',.- `'
Commercial: Residential:
Street: - i Gjl/,l/4
Village: 7 Floor Plan: #Bedrooms:
Owner: /0 /L-G/`( / Installer:
61-(42/,
Address: Phone: , ' 3f�'" - G
Phone:
Builder: Engineer: Ott4PG'
Address: 7 Phone: '�-- - F22_
Phone: Ai t +i ‘?'- iv, te, , ��,"
N/A YES )O
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table _ l<----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: (_----'
6.Benchmark indicated and shown-NGVD if near wetlands . L,--
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 1------
°9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
c2. System meets all other setback requirements Var.: _---
13. Uses adjustment for maximum high groundwater Var.: a),2 C i,,,�
14.Leaching set 4-5 ft above adj.water or 9ftest hole Var.: /
15. System not in top or subsoil(A,B horizons)or ' removai' ✓�
16.Proposed contours are suitable L/
17. System meets slope requirements-min. 1/8", ' "preferred ') L-/
18. System meets breakout requirements i PVC liner: ft),,,J`Wall: L.��
19. Specified tee sizes are proper, gas baffle on outlet tee.__
?r0. Sewage is under 10,000 gpd for parcel L.------.'
21.No garbage disposal
22. System adequately sized for its intended use L/
23.Minimum 6"stone or compacted below tank and dbox �f
24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field k_/
26. Electrical permit for pump chamber/Separate meter for duplexes L/
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size �------
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking ./
_30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: -�
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature :�---'
33. H-20 loading is subject to vehicular traffic, groundwater ✓�
34. Title V Application andpermit fee, installer signature _/
35.Foundation footing min. 2 feet above adjusted ground water for new house -----
36.Deed Restriction required max. #bedrooms: max. flow: gpd i
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: �zf' 6/03/03