Loading...
HomeMy WebLinkAboutPlan AQ10.01 Northern Equipment Room and MEP NotesREQUIRED ELECTRICAL SERVICE FOR POOL EQUIPMENT ROOM °C PUMP PREssuRE QTY. ITEM VOLT / PHASE COMMENTS 4 CHEMICAL FEED CONTROLLER 1 10 / 1 ELEC. SERVICE INTERLOCKED WITH RECIRC. PUMP VACUUM GAUGE, . a TYPICAL qA /h 4 CHEMICAL FEED PUMPS 1 10 / 1 ELEC. SERVICE THRU CONTROLLER >' 4 CO2 CONTROLLERS 1 10 / 1 ELEC. SERVICE THRU CHEMICAL CONTROLLERR/"wMAKER '. \\, 5 WATER PUMPS 4GO / 3 RECIRCULATION t FEATURE PUMPS el��pio�+ee-a� �ned r NORTH \ 4 AUTOFILL CONTROLLERS 1 10 / 1 CONTROLS SOLENOID VALVE (608)-4100 FLOWRIDER AUTOFILL 4 FILTER CONTROLLERS 1 10 / 1 REFER TO MANUFACTURER'S MANUAL CONTROLLER I AIR COMPRESSOR (FILTER) I I O / I REFER TO MANUFACTURER'S MANUAL UV UNIT 208-240 / 1 FLOW SWITCH FUNCTION THRU CHEMICAL CONTROLLER G 4 DIGITAL FLOWMETERS 1 20 / 1 SEE EQUIPMENT LIST FOR ADDITIONAL NOTES i Q20.0 _ FLOWRIDER FEATURE --- SEE FEATURE SUPPLIER PLANS 00 ELECTRICAL 9 FUTURE WATER PUMPS 4GO / 3 8 SLIDES AND I RECIRC. PUMP AQUATIC DEVELOPMENT GROUP 9 FUTURE DIGITAL FLOWMETERS 1201 1 --- „ xx I FUTURE AIR COMPRESSOR (SLIDE) --- --- //� NOTE: *** PUMPS SIZED 5.0 H.P. OR GREATER SHALL UTILIZE VARIABLE FREQUENCY DRIVES. SEE ELECTRICAL PLANS. *** PUMP VFD / DISCONNECT BY 0 �y GENERAL NOTES: ELECTRICAL CONTRACTOR, SEE ELECTRICAL PLANS. I 1. POOL CONTRACTOR SHALL SET PUMPS. ELECTRICAL CONTRACTOR SHALL PROVIDE STARTERS, BREAKERS, DISCONNECTS, TYPICAL. I AND ELECTRICAL SERVICE TO THE PUMPS. FLOWRIDER HOSE BIB BY PLUMBING 2. POOL CONTRACTOR SHALL SET HEATER(S). PIPING TO AND FROM HEATERS SHALL BE SCHEDULE 80 CPVC PIPING. L- RECIRC PUMP CONTRACTOR. SEE PLUMBING PLANS. FLOOR DRAIN BY PLUMBING 3. EQUIPMENT AND PIPING SHOWN FOR SCHEMATIC PURPOSES ONLY. POOL CONTRACTOR SHALL LOCATE EQUIPMENT AND CONTRACTOR. SEE PIPING IN FIELD. EYEWASH STATION BY PLUMBING PLUMBING PLANS. \ CONTRACTOR, SEE PLUMBING PLANS. UNI-STRUT FRAME WITH PLYWOOD 4. ALL VALVES TO HEATERS AND HEATER BY-PASS SHALL BE GEAR OPERATED OR INFINITELY ADJUSTABLE. Certlficatlon`'I` hereby certify that th€5 plan, 5pecificat4on, or report was prepared MOUNTING PANEL ANCHORED TO by me or under my direct 5uperv€5ion and that I am a duly Licensed CO2 CYLINDERS EQUIPMENT ROOM FLOOR AND 5. POOL CONTRACTOR TO CONNECT AUTOMATIC WATER FILL SYSTEM AND FILL SPOUT COLD WATER LINES FROM WATER Profe55€onal Engmeer under the laws of the 5tate of Massachusetts. CHEMICAL PUMPS, TYPICAL CEILING. FIELD VERIFY FINALSOURCE IN EQUIPMENT ROOM. DIMENSIONS. EQUIPMENT ROOM FLOOR MUST BE SLIP RESISTANT AND THE ENTIRE FLOOR AREA 6. POOL CONTRACTOR SHALL PROVIDE CONCRETE HOUSE -KEEPING PADS UNDER PUMPS AND OTHER REQUIRED EQUIPMENT. OF ® - - - MUST BE SLOPED TO FLOOR DRAINS. SEE ® ARCHITECTURAL AND PLUMBING PLANS. 7. PROVIDE ELECTRICAL GROUNDING AND BONDING OF ALL REQUIRED ITEMS IN EQUIPMENT ROOM AND POOL ROOM INCLUDING I ALL METALLIC ITEMS WITHIN 5' OF THE POOL EDGE. WORK SHALL CONFORM TO APPLICABLE NEC, STATE, AND LOCAL CODES.6 Jr:t Sri. ACTIVITY - OK0 �? a ® POOL UV ITEMS TO BE BONDED INCLUDE, BUT ARE NOT LIMITED TO: REINFORCING STEEL, HANDRAILS, LADDERS, UNDERWATER LIGHTS, I1`L CONTROL AUTOFILL RPZ(5) BY PLUMBING CONTRACTOR, ADA LIFTS, ALL METAL PARTS OF THE POOL STRUCTURE, DRAINS, CONDUIT t PIPING, WATER FEATURE, RAIL ANCHORS, PUMPS, No 47833 X ® PANEL f SEE PLUMBING PLANS. FIELD VERIFY FINAL AND POOL EQUIPMENT, SEE DETAIL I ON AQ20.09. � - X - LOCATION(S) WITH POOL CONTRACTOR.. \` O _ MECHANICAL CONTRACTOR NOTES: " ` PJ At t1- X------ O MECHANICAL CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING. MECHANICAL DESIGN BY OTHERS. x 1. PROVIDE EQUIPMENT ROOM, CHEMICAL STORAGE AREA, AND RESTROOM VENTILATION. ALL VENTILATION TO BE DESIGNED 211 6 Date: % 2022 � it I g€stered Crvd Engineer Signature: Date: PER APPLICABLE CODE(S). CO2 ELECTRICAL CONTRACTOR NOTES: REGEN FILTER DRAIN TANK DISCHARGE HUB FEEDERS I BY PLUMBING CONTRACTOR. SEE PLUMBING ° PLANS FOR DESIGN LOCATION. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING. ELECTRICAL DESIGN BY OTHERS. 1. FURNISH AND INSTALL GFCI PROTECTED JUNCTION BOXES, CONDUITS AND SWITCHES FOR UNDERWATER POOL LIGHTING. LIGHT FIXTURES AND NICHES TO BE FURNISHED BY POOL CONTRACTOR. WATER -TIGHT CONDUIT TO TERMINATE ABOVE WATER 1200 GALLON CHLORINE TANK ON SUMP PIT AND PUMP BY 2 LEVEL. SECONDARY CONTAINMENT PAD, ACTIVITY POOL I PLUMBING CONTRACTOR. FIELD COORDINATE LOCATION WITH ARCHITECT. UV UNIT I COORDINATE FINAL LOCATION. Q20.08 2. ELECTRICAL WIRING TO SOLENOID VALVES, POOL WATER SENSORS, AND POOL FILLS. POOL CONTRACTOR TO SUPPLY SIZE SECONDARY CONTAINMENT PER J \; SOLENOID VALVES FOR POOL FILLS MANUFACTURERS RECOMMENDATIONS AT A POOL FILTER AIR ' >� x , : ,.. x 3. FURNISH AND INSTALL EMERGENCY SHUT OFF SWITCH FOR THE FEATURE PUMPS AND FLOWRIDER FEATURE. SHUT OFF MINIMUM OF I37% CONTAINMENT VOLUME: COMPRESSOR. >'. /' , , .. �, , ,, ,; , . i SWITCH SHALL HAVE A PLASTIC COVER. EMERGENCY SWITCH TO SHUT OFF ALL FEATURE PUMPS. CHEMICAL CONTROLLERS FILTER DRAIN HUB WIG" AIR GAP f / ./ 4. ELECTRICAL WIRING TO PUMPS, STARTERS, DISCONNECTS, BREAKERS, VFD'S, CONDUIT AND WIRING. ALSO PROVIDE ELECTRICAL SERVICE TO THE FLOWMETER(S). BELOW EACH FILTER TANK. TO BE / FUTURE SLIDE SIZED FOR 300 GPM. i COMPLEX FILTER 5. LIGHTING IS REQUIRED IN THE EQUIPMENT ROOM AND RESTROOMS. - - ; TTG. ELECTRICAL WIRING TO CHEMICAL CONTROLLERS THRU SEPARATE DISCONNECT. CONTROLLERS TO BE INTERLOCKED WITH POOL RECIRCULATION PUMPS AND SHUT DOWN WHEN NO FLOW CONDITION EXIST. FLOWRIDER ACTIVITY / ` �: I FUTURE SLIDE BAR POOL C.. . �, �`s i FILTER I I POOL FILTER / FILTER ;� _ l PUMP 1 f !(f`t j f xf 7. PROVIDE POOL AREA LIGHTING 50 THAT EVERY PART OF THE POOL CAN BE CLEARLY SEEN PER MASSACHUSETTS POOL CODE. / ..... ............ CONTROLS MUST BE INACCESSIBLE TO THE PUBLIC. i - f - ! .f ell 8. PROVIDE GFCI PROTECTED RECEPTACLES IN THE EQUIPMENT ROOM. EQUIPMENT ROOM I b' .; n ; REGEN FILTER F.F. ELEV.= XX'-XX" °� G / DRAIN TANK, SEE 9. ALL POOL EQUIPMENT SHALL HAVE GFCI PROTECTION. PLUMBING PLANS FOR DESIGN t LOCATION. 10. ELECTRICAL SERVICE TO UV UNIT(S). 1 1. REFER TO FEATURE SUPPLIER PLANS AND SUBMITTALS FOR ELECTRICAL SERVICE FOR OPERATION OF FLOWRIDER AND 1 211 G/22 DOH REV15101\1 /, . ; , / ! ; ... WATER FEATU RE(S). Q20.0 FUTURE SLIDE MARK DATE DESCRIPTION / I t V,i% PUMP , PLUMBING CONTRACTOR NOTES: i , I �.: DATE 01/25/2022 ISSUED: FUTURE SLIDE AIR - PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING. PLUMBING DESIGN BY OTHERS. PUMP PIT BARRIER RAIL, COMPRESSOR gqj �--�- PHASE: STATE SUBMITTAL BAR POOL AUTOFILL SEE ARCHITECTURAL PLANS POOL AREA: / STANDPIPE t CONTROLLER SHIPS LADDER, SEE .� y _ i� t. /... .... �� -' PROJECT TITLE. �� FUTURE SLIDE 1. HOSE BIBS - PROVIDE HOSE BIBS IN THE POOL AREA TO CONVENIENTLY SERVE THE POOL AREA WITH A MAXIMUM 100' ARCHITECTURAL PLANS i «_ X BAR POOL PUMP ( I HOSE.--- / RECIRC PUMP CAPE COD H 6 I___._.., , R' 2. DRINKING FOUNTAIN - PROVIDE AT LEAST ONE DRINKING FOUNTAIN IN THE POOL VICINITY. /, NfLATADLE / 11D 3. FURNISH AND INSTALL DECK DRAIN PIPING t SUMP ALONG WITH PUMP. PUMP TO DISCHARGE TO SANITARY SEWER THROUGH % FUTURE SLIDE FUTURE SLIDE FUTURE SLIDE AN AIR GAP. (�7 ACTIVITY POOL AUTOFILL FUTURE SLIDE PUMP PUMP PUMP j� \ I AI \K STANDPIPE t CONTROLLER RECIRC PUMP ` -.- EQUIPMENT ROOM: ACTIVITY POOL I . PROVIDE A HOSE BIB. RECIRC PUMP PROJECT OWNER: CAPE COD I ; PUMP PRESSURE / -�" I.. i 2. PROVIDE FLOOR DRAINS. VACUUM GAUGE, TYPICAL % \� FUTURE SLID E I j �,, � 7 II PUMP f s ,_. ��_� .� 3. PROVIDE BACKWASH HUB IN COMPLIANCE OF PLUMBING CODE(S), BOARD OF HEALTH, AND DEPARTMENT OF INFLATABLE PARK ENVIRONMENTAL PROTECTION REGULATIONS FOR DISCHARGE OF POOL WATER AND REGENERATIVE FILTER MEDIA. PROJECT LOCATION: x PUMP PIT ;, :, ,; I T WEST YARMOUTH, - .�. - i F. F. ELEV. = XX'-XX" �� ( ` 4. POOL FILL WATER - PROVIDE A PROTECTED WATER SUPPLY IN THE EQUIPMENT ROOM; SEE DETAIL 5 ON AQ20.08. ACTIVITY POOL'S /. FEATURE PUMP I ,,.. „j A. f� / F' MA55ACH U5ETT5 s� 1,: _.._ __ / , } / / 5. FURNISH AND INSTALL SUMP AND PUMP FOR REGENERATIVE MEDIA FILTER DRAINAGE, SEE DETAIL 2 ON AQ20.08 FOR AIR FUTURE SLIDE PUMP (� l GAP REQUIREMENTS. SHEET TITLE: ' 1 c .., > _ . 4 x I I I I / f _� s BATHROOMS: TBY NORTHERN / ELECTRICAL CONTRACTOR, I.FLOOR DRAINS ARE REQUIRED. ........ OOM SEE ELECTRICAL PLANS. , ; - r E U I NT R X TYPICAL. r S 2. PROVIDE HOSE BIBS IN THE BATHROOMS OR ENSURE THAT THE POOL AREA HOSE BIBS ARE LOCATED TO BE ABLE TO SERVE AND MEP NOTES FEATURE x ; I ;'' THE BATHROOMS WITH A MAXIMUM I00' HOSE. \,NMI,Mm MANIFOLD .. ...,... , ,, / ;i i% ,f / i /.' i / x , 2 2" x 34" - 3/8" = I ' PROJECT NUM5 2987 BER SHEET NUMBER AQ 10.0 1 I