Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plan AQ10.00 Wave Pool Equipment Room and MEP Notes
�T % %'' /' ,� j ' CAISSON CAISSON I r r x s'• t ?" z f V v. r I' r A I. F ✓fj IA 77/ 0 0 WAVE GENERATION EQUIPMENT, SEE MANUFACTUERS PLANS. FLOOR DRAIN BY PLUMBING CONTRACTOR. SEE PLUMBING PLANS s t y` • i • �.� ., r :r-, ..r, ..y.., .1 "h. f 1. x 1, 850 GALLON CHLORINE TANK it SECONDARY CONTAINMENT, COORDINATE LOCATION WITH ARCHITECT. SIZE SECONDARY CONTAINMENT PER ". MANUFACTURERS RECOMMENDATIONS AT A MINIMUM OF 1 04% CONTAINMENT VOLUME ELECTRICAL ROOM GENERAL NOTES: 1. POOL CONTRACTOR SHALL SET PUMPS. ELECTRICAL CONTRACTOR SHALL PROVIDE STARTERS, BREAKERS, DISCONNECTS, AND ELECTRICAL SERVICE TO THE PUMPS. 2. POOL CONTRACTOR SHALL SET HEATER(S). PIPING TO AND FROM HEATERS SHALL BE SCHEDULE 80 CPVC PIPING. 3. EQUIPMENT AND PIPING SHOWN FOR SCHEMATIC PURPOSES ONLY. POOL CONTRACTOR SHALL LOCATE EQUIPMENT AND PIPING IN FIELD. 4. ALL VALVES TO HEATERS AND HEATER BY-PASS SHALL BE GEAR OPERATED OR INFINITELY ADJUSTABLE. 5. POOL CONTRACTOR TO CONNECT AUTOMATIC WATER FILL SYSTEM AND FILL SPOUT COLD WATER LINES FROM WATER SOURCE IN EQUIPMENT ROOM. G. POOL CONTRACTOR SHALL PROVIDE CONCRETE HOUSE -KEEPING PADS UNDER PUMPS AND OTHER REQUIRED EQUIPMENT. 7. PROVIDE ELECTRICAL GROUNDING AND BONDING OF ALL REQUIRED ITEMS IN EQUIPMENT ROOM AND POOL ROOM INCLUDING ALL METALLIC ITEMS WITHIN 5' OF THE POOL EDGE. WORK SHALL CONFORM TO APPLICABLE NEC, STATE, AND LOCAL CODES. ITEMS TO BE BONDED INCLUDE, BUT ARE NOT LIMITED TO: REINFORCING STEEL, HANDRAILS, LADDERS, UNDERWATER LIGHTS, ADA LIFTS, ALL METAL PARTS OF THE POOL STRUCTURE, DRAINS, CONDUIT * PIPING, WATER FEATURE, RAIL ANCHORS, PUMPS, AND POOL EQUIPMENT. SEE DETAIL I ON AQ20.09. MECHANICAL CONTRACTOR NOTES: MECHANICAL CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING. MECHANICAL DESIGN BY OTHERS. 1. PROVIDE EQUIPMENT ROOM, CHEMICAL STORAGE AREA, AND RESTROOM VENTILATION. ALL VENTILATION TO BE DESIGNED PER APPLICABLE CODE(S). WAVE POOL _.____._._.___--------._---- -- -- - ___-___._____._-__ CAISSON CAISSON '; CAISSON ' CAISSON I �, w � ,.. , ,... ., s. f ,::.."f .. .3 r.". < 'r _ t 7•, .,. s y., r ,.. .- :, , r , t •�J. {`-. A. r ,.., , , r < ,.. 3...: „. ,. r r. , , ,. r ,.. r..,.. :.•, ., r �. , r t , ~•z r r t, r- .,,� . EQUIPMENT ROOM / ABOVE CAISSONS I \ 3 y, F.F. ELEV.= 99'-9°/. 1 \ / BELOW GRADE PIPING TO BALANCE TANK \ \ INTERIOR AND EXTERIOR EQUIPMENT ROOM \ FLOOR MUST BE SLIP RESISTANT AND THE ENTIRE FLOOR AREA MUST BE SLOPED TO FLOOR DRAINS OR GRADE. SEE FILTER DRAIN HUB WIG" AIR GAP BELOW ARCHITECTURAL AND PLUMBING PLANS. FILTER TANK. TO BE SIZED FOR 300 GPM. EQUIPMENT ROOM SHIPS LADDER, SEE, SEE PLUME31NG HOSE BIB BY PLUMBING CONTRACTOR. (INTERIOR) F.F. ARCHITECTURAL PLANS PLANS. ELEV.= 97-0" s r r., y 77777777 t r r f s'. s 3` WAVE POOL AIR ' COMPRESSOR , ° • ° ( I EYEWASH STATION BY PLUMBING CONTRACTOR, SEE PLUMBING PLANS. ©° PUMP VFD / DISCONNECT BY ELECTRICAL CHEMICAL 1 WAVE POOL CONTRACTOR, SEE ELECTRICAL CONTROLLER FILTER e �� i PLANS. TYPICAL. CO2 FEEDER O CHEMICAL PUMPS \ EQUIPMENT ROOM CO2 CYLINDERS ® (EXTERIOR) F.F. O O� ELEV.= 97-0" ' 2 REGEN FILTER DRAIN TANK, Q20 08 SEE PLUMBING PLANS FOR DESIGN * LOCATION. SUMP PIT AND PUMP BY PLUMBING CONTRACTOR. FIELD COORDINATE FINAL LOCATION. REGEN FILTER DRAIN TANK DISCHARGE HUB BY PLUMBING CONTRACTOR. SEE PLUMBING PLANS FOR DESIGN LOCATION. ELECTRICAL CONTRACTOR NOTES: ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING. ELECTRICAL DESIGN BY OTHERS. 1. FURNISH AND INSTALL GFCI PROTECTED JUNCTION BOXES, CONDUITS AND SWITCHES FOR UNDERWATER POOL LIGHTING. LIGHT FIXTURES AND NICHES TO BE FURNISHED BY POOL CONTRACTOR. WATER -TIGHT CONDUIT TO TERMINATE ABOVE WATER LEVEL. 2. ELECTRICAL WIRING TO SOLENOID VALVES, POOL WATER SENSORS, AND POOL FILLS. POOL CONTRACTOR TO SUPPLY SOLENOID VALVES FOR POOL FILLS 3. FURNISH AND INSTALL EMERGENCY SHUT OFF SWITCH FOR THE FEATURE PUMP AND WAVE POOL FEATURE. SHUT OFF SWITCH SHALL HAVE A PLASTIC COVER. EMERGENCY SWITCH TO SHUTOFF ALL FEATURE PUMPS. 4. ELECTRICAL WIRING TO PUMPS, STARTERS, DISCONNECTS, BREAKERS, VFD'S, CONDUIT AND WIRING. ALSO PROVIDE ELECTRICAL SERVICE TO THE FLOWMETER(S). 5. LIGHTING IS REQUIRED IN THE EQUIPMENT ROOM AND RESTROOMS. G. ELECTRICAL WIRING TO CHEMICAL CONTROLLERS THRU SEPARATE DISCONNECT. CONTROLLERS TO BE INTERLOCKED WITH POOL RECIRCULATION PUMPS AND SHUT DOWN WHEN NO FLOW CONDITION EXIST. I 7. PROVIDE POOL AREA LIGHTING SO THAT EVERY PART OF THE POOL CAN BE CLEARLY SEEN PER MASSACHUSETTS POOL CODE. CONTROLS MUST BE INACCESSIBLE TO THE PUBLIC. 8. PROVIDE GFCI PROTECTED RECEPTACLES IN THE EQUIPMENT ROOM. 9. ALL POOL EQUIPMENT SHALL HAVE GFCI PROTECTION. 10. REFER TO FEATURE SUPPLIER PLANS AND SUBMITTALS FOR ELECTRICAL SERVICE FOR OPERATION OF WAVE GENERATION EQUIPMENT AND WATER FEATURE(S). PLUMBING CONTRACTOR NOTES: PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING. PLUMBING DESIGN BY OTHERS. POOL AREA: 1. HOSE BIBS - PROVIDE HOSE BIBS IN THE POOL AREA TO CONVENIENTLY SERVE THE POOL AREA WITH A MAXIMUM 100' HOSE. 2. DRINKING FOUNTAIN - PROVIDE AT LEAST ONE DRINKING FOUNTAIN IN THE POOL VICINITY. EQUIPMENT ROOM: 1. PROVIDE A HOSE BIB. 2. PROVIDE FLOOR DRAINS AND SUMP WITH PUMP AS NECESSARY. PUMP TO DISCHARGE THROUGH AN AIR GAP. 3. PROVIDE BACKWASH HUB IN COMPLIANCE OF PLUMBING CODE(S), BOARD OF HEALTH, AND DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS. POOL IL WATER - PROVIDE A T W U • 4 F L R R PROTECTED WATER SUPPLY IN THIS EQUIPMENT ROOM, SEE DETAIL G ON AQ20.08. 5. FURNISH AND INSTALL SUMP AND PUMP FOR REGENERATIVE MEDIA FILTER DRAINAGE, SEE DETAIL 2 ON AQ20.08 FOR AIR GAP REQUIREMENTS. BATHROOMS: 1. FLOOR DRAINS ARE REQUIRED. 2. PROVIDE HOSE BIBS IN THE BATHROOMS OR ENSURE THAT THE POOL A�A HOSE BIBS ARE LOCATED TO BE ABLE TO SERVE THE BATHROOMS WITH A MAXIMUM 100' HOSE. WAVE POOL BALANCE TANK / \ 3 ---0 ?0.08 AUTO FILL CONTROLLER\ / AUTOFILL RPZ BY PLUMBING CONTRACTOR, SEE PLUMBING PLANS. FIELD VERIFY FINAL L LOCATION WITH POOL - CONTRACTOR. PUMP PIT f F.F. ELEV.= 88'-01 I WAVE POOL WAVE POOL RECIRC PUMP FEATURE PUMP PUMP PIT BARRIER RAIL, SEE ARCHITECTURAL PLANS PUMP PRESSURE / VACUUM GAUGE, TYPICAL FEAT U RE MANIFOLD NORTH REQUIRED ELECTRICAL SERVICE FOR POOL EQUIPMENT ROOM QTY. ITEM VOLT / PHA5E COMMENTS I CHEMICAL FEED CONTROLLER 1 10 / 1 ELEC. SERVICE INTERLOCKED WITH RECIRC. PUMP I CHEMICAL FEED PUMP 1 10 / 1 ELEC. SERVICE THRU CONTROLLER I CO2 CONTROLLER 1 10 / 1 ELEC. SERVICE THRU CHEMICAL CONTROLLER 2 WATER PUMPS 4GO / 3 RECIRCULATION * FEATURE PUMPS I AUTOFILL CONTROLLER 1 10 / 1 CONTROLS SOLENOID VALVE I FILTER CONTROLLER 1 10 / 1 REFER TO MANUFACTURER'S MANUAL I AIR COMPRESSOR (FILTER) 1 10 / 1 REFER TO MANUFACTURER'S MANUAL 3 DIGITAL FLOWMETERS 1201 1 SEE EQUIPMENT LIST FOR ADDITIONAL NOTES 2 WAVE GENERATION FANS --- SEE FEATURE SUPPLIER PLANS I WAVE CONTROLLER 1 10 / 1 SEE FEATURE SUPPLIER PLANS I AIR COMPRESSOR (WAVES) --- SEE FEATURE SUPPLIER PLANS NOTE: *** PUMPS SIZED 5.0 H.P. OR GREATER SHALL UTILIZE VARIABLE FREQUENCY DRIVES. SEE ELECTRICAL PLANS. *** R/Ai"'MAKER em loyee-oyined (608) 643-4100 www.ramaker.com C&ti icataon * Seal: I hereby certify that this plan, speafication, or report was prepared by me or under my direct superw5101`1 and that I am a duly Licensed Professional Engineer under the laws of the 5tate of Massachusetts. 0F MAES R, mil'tV3rR0N Ili 00L (4i O, 47833 1 , ri 1 2 16 2022 gistered CmI Engineer Signature: Date: AI 211 G/22 I DOH REVISION MARK I DATE I DESCRIPTION DATE 01 /25/2022 ISSUED: ISSUE STATE SUBMITTAL PHASE: PROJECT TITLE: CAPE COD N FLATABLE PARK PROJECT OWNER: CAPE COD INFLATABLE PARK PROJECT LOCATION: WEST YARMOUTH, MA55ACH U5ETT5 SHEET TITLE: WAVE POOL EQUIPMENT ROOM AND MEP NOTES O 1 '-3" 2'-G" 5' I I" x 1 7" - 3/ I G" = I' 2 2" x 34" - 3/8" = 1 ' NUOMBER 52987 NUMBER AQ 10.00