Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM ¢ LOT /1 Date of Subdivision Approval Street /(�,( / � 9-rrr�4 Zone of Contribution: In Out Village X a Commercial Residential, Owner: S4t47/4/ 7 AtG ,7h 9L Installer 76742 Builder: Th2-ee/ �' i Engineer � Ot �/ J/i PD ,,)/ 7- / ��c% - if'd ' V ti o2bV Tk-4) 43- CI SbF- Pt‘--- . (1 F�t1` d.:hcm I/lk1Lt. '. `( :di_. 9.,;;,‘ p2i.c V&vt: C r N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material. above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. i_� 5. Water availability letter from Water Department for new construction. "A.,t ;' 6. Benchmark indicated and shown-NGVD if near wetlands. 7. Building sewer does not exit center of house. i/ 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking welLs/25 feet from irrigation wells. __ 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. 14. Leac ' g 4-5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. 17. System meets slope requirements - min 1/8". 1/4" preferred. L 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. t..- 19. Specified tee sizes are proper, gas baffle on outlet tee. t,/ 20. Sewage flow under 10.000 apd for parcel. , 21. No garbage disposal. 22. System adequately sized for its intended use. L/ 23. Minimum 6" stone or mechanical1v compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26 Pumpystem- 2" line weep hole check valve sanitary in d-box alarm on separate circuit 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a, clay removal b. wall construction schedule c: commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing.2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: 4 ,9e '91/6 vfr7q°77. k.J7(1 0-742-49/77'1 i16`i-K/7